Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksXtract Regulatory News (XTR)

Share Price Information for Xtract (XTR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.875
Bid: 0.75
Ask: 1.00
Change: 0.00 (0.00%)
Spread: 0.25 (33.333%)
Open: 0.875
High: 0.875
Low: 0.875
Prev. Close: 0.875
XTR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Bushranger Drilling Programme Progress Update

5 Feb 2021 14:07

RNS Number : 2003O
Xtract Resources plc
05 February 2021
 

 

For immediate release

5 February 2021

 

Xtract Resources Plc

("Xtract" or the "Company")

Bushranger Copper/ Gold Project Drilling Programme - Further Progress Update

 

The Board of Xtract Resources Plc ("Xtract" or the "Company") announces the completion of drilling of the second hole in the Phase One diamond drilling programme at the Racecourse Mineral Resource on the Bushranger porphyry copper-gold exploration project located in the Lachlan Fold Belt ("LFB"), New South Wales, Australia.

 

Highlights

 

· Hole BRDD-21-002, the second hole of the planned drilling programme, was stopped at 899.4m depth as copper mineralisation diminished towards the bottom of the hole.

· Visible copper mineralisation extended over a considerably greater width than originally anticipated, resulting in the hole running about 150m beyond its planned depth.

· Drill core will now be logged in detail and copper grades will initially be assessed using a hand-held XRF spectrometer prior to sampling for full laboratory analysis for copper, gold and other accompanying elements.

· The rig will now be set up to drill the third hole of the programme across the mineralised porphyry system to define the width and grade of the zone higher in the system.

 

Colin Bird, Executive Chairman said: "We are encouraged by the results of the first two holes which have exceeded our expectations with regard to the extent of the mineralised envelope at the Racecourse deposit. The next hole in the programme will be drilled higher in the system to assist in defining the third dimension to the deposit which will help us to design and target future drilling."

 

 

Drilling Summary

Hole BRDD-21-002, the second hole of the Phase One Drilling Programme at the Racecourse Mineral Resource on the Bushranger Project, was drilled with the aim of crossing through the down-plunge extension of the deposit at depth. Mineralisation in the hole occurred over a considerably greater width than anticipated in the form of disseminated and fracture-fill chalcopyrite, accompanied by pyrrhotite and pyrite, within a variably altered porphyry copper-gold system. 

 

The drill core will next be logged in detail and copper grades will be initially assessed using a hand-held XRF spectrometer prior to cutting of the core in preparation for definitive laboratory sample analysis for copper, gold and other accompanying elements.

As the first two completed holes by the Company at Bushranger were particularly critical in defining the overall down-plunge and width dimensions of the Racecourse deposit beyond the limits of previous drilling, the Company has issued daily updates on drilling progress over the last few weeks. The positive outcome of the first two holes has warranted the drilling of several follow-up holes, and ongoing drilling will aim to further extend the boundaries of the deposit and to define the internal continuity of the mineralisation, as well as testing for possible additional branches of the porphyry system. The Company will revert to reporting on the drilling on these follow-up holes on a more periodic basis as significant developments arise.

 

The drill rig will now be re-oriented and the third hole of the programme will aim to test the width and grade of the mineralisation higher in the deposit to assist in defining the 3-dimensional shape and orientation of the porphyry system.

 

Further information is available from the Company's website which details the Company's project portfolio as well as a copy of this announcement: www.xtractresources.com

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation No. 596/2014 on market abuse. The person who arranged for the release of this announcement on behalf of the Company was Colin Bird, Director.

 

Enquiries:

 

Xtract Resources Plc

Colin Bird,

Executive Chairman

 

+44 (0)20 3416 6471

www.xtractresources.com

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

Michael Cornish

Felicity Geidt

+44 (0)207628 3369

www.beaumontcornish.co.uk

 

Novum Securities Limited

Joint Broker

 

Jon Belliss

Colin Rowbury

 

+44 (0)207 399 9427

www.novumsecurities.com  

 

 

Qualified Person:

Information in this announcement relating to the exploration works has been reviewed by Edward (Ed) Slowey, BSc, PGeo, a consultant to Xtract. Mr Slowey is a graduate geologist with more than 40 years' relevant experience in mineral exploration and mining, a founder member of the Institute of Geologists of Ireland and is a Qualified Person under the AIM rules. Mr Slowey has reviewed and approved the geological content of this announcement.

 

Qualified Person:

In accordance with AIM Note for Mining and Oil & Gas Companies, June 2009 ("Guidance Note"), Colin Bird, CC.ENG, FIMMM, South African and UK Certified Mine Manager and Director of Xtract Resources plc, with more than 40 years' experience mainly in hard rock mining, is the qualified person as defined in the Guidance Note of the London Stock Exchange, who has reviewed the technical information contained in this press release.

 

TECHNICAL GLOSSARY

The following is a summary of technical terms:

 

"alteration zone"

 

A zone exhibiting change in mineralogical composition of a rock commonly brought about by reactions with hydrothermal solutions

"Au"

Gold

 

"chalcopyrite"

A copper-iron sulphide mineral, CuFeS2, often found in copper ores

 

 

"Cu"

Copper

 

"disseminated"

Mineralization distributed throughout a rock

 

 

"exploration"

Method by which ore deposits are evaluated

 

 

"mineralisation"

Process of formation and concentration of elements and their chemical compounds within a mass or body of rock

 

 

 

 

"porphyry"

A deposit of disseminated copper minerals in or around a large body of intrusive rock

 

"XRF Spectrometer"

Instrument to determine the chemistry of a sample by measuring the fluorescent (or secondary) X-ray emitted from a sample when it is excited by a primary X-ray source

 

 

 

 

ENDS

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLXELFBFLLEBBV
Date   Source Headline
7th Jul 202212:18 pmRNSBushranger assay results and drilling update
1st Jul 202211:06 amRNSSecond Price Monitoring Extn
1st Jul 202211:00 amRNSPrice Monitoring Extension
30th Jun 20224:33 pmRNSFinal Results
22nd Jun 20229:06 amRNSProduction Update
31st May 202211:14 amRNSAscot Prospect Drill Results Summary
27th May 20223:03 pmRNSBushranger Project Assay Results
17th May 20229:14 amRNSBushranger Project Assay Results
10th May 20227:00 amRNSBushranger Project Assay Results
9th May 20225:27 pmRNSTotal Voting Rights
22nd Apr 20227:00 amRNSExercise of warrants
6th Apr 20227:00 amRNSBushranger Project Drilling Update
31st Mar 202212:19 pmRNSBushranger Project Assay Results
21st Mar 20226:12 pmRNSChange of auditor
21st Mar 20227:00 amRNSBushranger Project Assay Results
7th Mar 20227:00 amRNSBushranger Project Assay Results
2nd Mar 20227:00 amRNSBushranger Project drilling update
28th Feb 20224:40 pmRNSSecond Price Monitoring Extn
28th Feb 20224:36 pmRNSPrice Monitoring Extension
28th Feb 202212:56 pmRNSBushranger Project MIMDAS geophysical survey
10th Feb 20221:30 pmRNSBushranger Project Assay Results
3rd Feb 20222:30 pmRNSBushranger Project Assay Results
28th Jan 202212:04 pmRNSHolding(s) in Company
26th Jan 20227:00 amRNSMetallurgical test work planned at Bushranger
19th Jan 20223:45 pmRNSBushranger Project Assay Results
18th Jan 20227:00 amRNSManica Gold Update
6th Jan 202211:39 amRNSDirectorate Change
4th Jan 20224:41 pmRNSSecond Price Monitoring Extn
4th Jan 20224:36 pmRNSPrice Monitoring Extension
4th Jan 20222:06 pmRNSSecond Price Monitoring Extn
4th Jan 20222:00 pmRNSPrice Monitoring Extension
4th Jan 202211:05 amRNSSecond Price Monitoring Extn
4th Jan 202211:00 amRNSPrice Monitoring Extension
21st Dec 20217:00 amRNSBushranger Project Assay Results
17th Dec 20211:41 pmRNSBushranger Project Phase 2 Drilling Update
9th Dec 20212:53 pmRNSNew Porphyry Copper System at Bushranger Project
2nd Dec 20217:00 amRNSBushranger Project Drilling Update
24th Nov 20217:00 amRNSBushranger Project Assay Results
19th Nov 202111:42 amRNSBushranger assay results and drilling update
12th Nov 202110:25 amRNSBushranger Project Assay Results
9th Nov 202112:30 pmRNSBushranger Project Phase 2 Drilling Update
2nd Nov 20219:07 amRNSBushranger Project Phase 2 Drilling Update
29th Oct 20217:00 amRNSBushranger Project Further Assay Results
25th Oct 20215:29 pmRNSResult of AGM
21st Oct 20212:42 pmRNSBushranger Project Assay Results
20th Oct 20212:10 pmRNSBushranger Phase 2 Drilling Programme Update
14th Oct 20217:00 amRNSManica Gold Update
13th Oct 20217:00 amRNSBushranger drilling and licence update
7th Oct 20216:06 pmRNSBushranger Project Assay Results
7th Oct 202110:01 amRNSBushranger Phase 2 Drilling Programme Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.