Tribe Technology set to deliver healthy pipeline of orders from Tier-One miners. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSTA.L Regulatory News (STA)

  • There is currently no data for STA

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Trinidad Operations Update

13 Jan 2016 07:00

RNS Number : 6645L
Range Resources Limited
12 January 2016
 



Range Resources Limited
(‘Range’ or ‘the Company’)
 
13 January 2016

 

 

Trinidad Operations Update

 

Range provides the following update with respect to its operations in Trinidad with the following highlights:

 

· Approvals for the implementation of the Beach Marcelle waterflood project have been received;

· 12 wells have been approved for conversion to water injectors on the Morne Diablo waterflood project. Initial water injection has commenced;

· Third development well of the 22 well programme has reached its total depth with a total of 130 ft. of net oil sand encountered and the well Is being tested; and

· In addition, a new upper zone on the existing QUN 47 well has been perforated, with the well flowing a stabilized rate of 50 bopd from this new zone.

 

Waterflood programme

 

Beach Marcelle

 

The Company is pleased to announce that it has received government and regulatory approvals for the implementation of the Beach Marcelle waterflood programme. Separate work programme stages will require additional approvals as the project progresses.

 

The Beach Marcelle waterflood is the largest scale waterflood project to be undertaken in recent times in Trinidad and is expected to be a major contributor to the Company's production growth. The majority of Range's 1P reserve base is found in the Beach Marcelle block (14.7 mmbbls of 1P reserves).

 

The Beach Marcelle waterflood has been split into a number of individual projects, based on the fault blocks within the field. Each project has been subjected to subsurface and simulation studies, and tested for economic viability at current oil prices.

Phase 1 projects comprise the South East, North East and part of the South West blocks. The South East block will be the first to be waterflooded. It is expected to produce up to 2,500 bopd and 5.5 mmbbls of oil in an 8-year period.

The Phase 2 project comprises part of the North West area, previously partially waterflooded by Texaco in the 1960s.

The Company is evaluating the possibility of using disposal water from Petrotrin and / or other operators in the Beach Marcelle area as its water source. This would be a more cost effective option than drilling new water source injector wells.

The Company is finalising its project timeline for the Beach Marcelle project, and will publish it to shareholders once completed.

Morne Diablo

 

As announced on 3 December 2015, the Company has also received all necessary government and regulatory approvals for the Morne Diablo waterflood expansion programme.

 

Initial water injection commenced in December 2015, with three wells being injected. Nine further wells have been approved for conversion to water injectors. The Company has conducted further screening of existing wells on the Morne Diablo field to be used as potential water source candidates, which will be finalised once a well integrity survey has been completed.

 

Initially the Company will be sourcing injection water from available wells on the Morne Diablo field. As the waterflood operations expand, the Company is discussing with Petrotrin a possible commercial arrangement for using available disposal water from their operations in the area, which could provide access of up to 3000 bwpd. This arrangement would also involve potential access to Petrotrin's pipeline, subject to approvals. If approvals are obtained, Range will need to install piping for connectivity to its Morne Diablo field.

 

The original oil-in-place is estimated by Range to be approximately 6.5 mmbbls, of which 1.35 mmbbls (21%) has been produced by primary depletion. Studies indicate that the waterflood expansion programme could produce another 1.15 mmbbls (18%) at Morne Diablo.

 

Drilling programme

 

Range is pleased to advise that the third development well of the 22 well programme, the GY 161 S well (renamed GY 680) at the Beach Marcelle field which was spudded on 27 November 2015, reached its revised total depth on 10 December 2015. During the drilling operations, the decision was made to drill the well to a revised total depth of 1,685 ft. (instead of 2,000 ft. as initially planned) as the targeted sands were encountered at a shallower depth of 1,450 ft.

 

The log evaluation has been completed, with a total of 130 ft. net oil sand having been encountered. The well has been perforated and is currently being tested.

 

Range also advises that the second development well of the 22 well programme, the 180SE well (renamed GY 679), which was drilled on the Beach Marcelle field in November, has been perforated. The Company is observing the performance of this well and will update shareholders as appropriate.

 

The Company is also pleased to advise that it has perforated a new upper zone on the existing QUN 47 well located in the Morne Diablo field. As a result, the well is flowing a stabilized rate of 50 bopd from this new zone.

In addition, as advised by Range Resources Drilling Services Limited ("RRDSL"), the status of the drilling rigs is as follows:

· Rig 2 - the rig is currently at the Beach Marcelle field, following perforation of the GY 680 well.

· Rig 8 - as previously announced, the Ministry of Energy and Energy Industries ("MEEI") requested RRDSL to provide additional data on the modifications to the mast, as part of the approval process, which was submitted by RRDSL in early November. Once all the required data is approved by MEEI, final regulatory inspections of the rig will take place.

· New rigs - the rigs are currently awaiting certification from the MEEI. Further updates will be provided once certification is in place.

Given the continuing low oil price environment, the Company is reviewing its work programme for 2016. The Company will update shareholders once the review has been completed.

 

Competent Person statement

 

In accordance with AIM Rules, Guidance for Mining and Oil & Gas Companies, the information contained in this announcement has been reviewed and approved by Dr Douglas Field. Dr Field is a petroleum and reservoir engineer who is a suitably qualified person with over 30 years' experience in assessing hydrocarbon reserves, and holds a PhD in Organic Chemistry. Dr Field is a member of the SPE (Society of Petroleum Engineers) and the PESGB (Petroleum Exploration Society of Great Britain). The reserves information in this announcement has been prepared in accordance with the guidelines of the Society of Petroleum Engineers (SPE).

 

Glossary

 

Original oil in place is that quantity of petroleum that is estimated to exist originally in naturally occurring accumulations. It includes that quantity of petroleum that is estimated, as contained in known accumulations prior to production plus those estimated quantities in accumulations yet to be discovered.

 

Proved Reserves are those quantities of petroleum, which by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable, from a given date forward, from known reservoirs and under defined economic conditions, operating methods, and government regulations. 1P refers to Proved Reserves.

 

Contact Details

 

 

Range Resources Limited

Evgenia Bezruchko (Group Corporate Development Manager)

e. admin@rangeresources.co.uk

t. +44 (0)20 7520 9486

Cantor Fitzgerald Europe (Nominated Advisor and Broker)

David Porter / Sarah Wharry (Corporate Finance)

Richard Redmayne (Corporate Broking)

t. +44 (0)20 7894 7000

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCKLLFFQFFZBBX
Date   Source Headline
26th Mar 20088:03 amPRNPuntland Update
25th Mar 20085:30 pmRNSDirector/PDMR Shareholding
25th Mar 20087:00 amPRNASX Trading Halt
17th Mar 20087:00 amPRNHalf-yearly Report
29th Feb 20086:13 amPRNHolding(s) in Company
28th Feb 20087:00 amPRNDrilling Program Update
15th Feb 20087:00 amPRNHolding(s) in Company
4th Feb 200812:36 pmRNSHolding(s) in Company
4th Feb 200812:34 pmRNSDirector/PDMR Shareholding
31st Jan 20088:15 amPRNQuarterly Report
31st Jan 20087:01 amRNSInterim Results
7th Jan 20087:00 amPRNChange in Significant Shareholding
28th Dec 20077:00 amPRNConversion of Partly Paid Shares
21st Dec 20077:00 amPRNIssue of Equity
19th Dec 20077:50 amPRNDirector Shareholding
18th Dec 20077:00 amPRNStatement re Share Price Movement
4th Dec 20078:53 amPRNUpdate on Non-Renounceable Options Issue
22nd Nov 20077:00 amPRNCompany Secretary Change
19th Nov 20077:30 amPRNIssue of Equity
9th Nov 20077:37 amPRNResults of AGM and Company Presentation
7th Nov 20077:02 amRNSLaunch of Stagecoach Shop.
5th Nov 20078:24 amPRNHolding(s) in Company
2nd Nov 20077:39 amPRNEntitlement Issue Prospectus
2nd Nov 20077:00 amPRNOperations Update
1st Nov 20079:18 amPRNQuarterly Results
30th Oct 20077:00 amPRNIssue of Equity
23rd Oct 20078:40 amPRNAdmission to AIM
22nd Oct 20073:24 pmRNSDirector/PDMR Shareholding
19th Sep 20077:01 amRNSAGM Statement
20th Aug 20071:34 pmRNSAIM Notice (Rule 26)
15th Aug 20077:00 amRNSFinal Results
23rd May 20075:02 pmRNSDirector/PDMR Shareholding
22nd Mar 20072:52 pmRNSHolding(s) in Company
14th Mar 200710:12 amRNSHolding(s) in Company
14th Feb 200711:01 amRNSDirector/PDMR Shareholding
31st Jan 20077:01 amRNSInterim Results
15th Dec 20064:19 pmRNSTotal Voting Rights
4th Oct 20065:23 pmRNSShare Options to Directors
24th Aug 20067:00 amRNSChange of Adviser
17th Aug 20067:15 amRNSPreliminary Results
1st Feb 20067:30 amRNSInterim Results
23rd Nov 20054:28 pmRNSHolding(s) in Company
16th Aug 20055:51 pmRNSFinal Results
16th Aug 20054:03 pmRNSFinal Results
5th May 20053:48 pmRNSTrading Statement
28th Jan 20053:45 pmRNSAdditional Listing
27th Jan 200512:24 pmRNSInterim Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.