The next focusIR Investor Webinar takes places on Weds 10th July at 6 PM with guest speakers from Pyx Resources (PYX), Helium one (HE1), Fulcrum Metals (FMET) and Metals One (MET1). Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSable Mining Africa Regulatory News (SBLM)

  • There is currently no data for SBLM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Resource Increase at Nimba Iron Ore Project

23 Apr 2014 07:00

RNS Number : 2705F
Sable Mining Africa Limited
23 April 2014
 



Sable Mining Africa Ltd / Index: AIM / Epic: SBLM / Sector: Natural Resources

23 April 2014

Sable Mining Africa Limited ('Sable Mining' or 'the Company')

JORC Code compliant Resource Increase at Nimba Iron Ore Project

 

Sable Mining Africa Limited, the AIM listed exploration company, is pleased to announce a further JORC Code compliant Resource update at the Nimba Iron Ore Project in south-east Guinea ('Nimba' or 'the Project') following expansion exploration drilling on a limited area of Plateau 3.

 

Overview

 

· Increase in total JORC Resource to 181.8 million tonnes ('Mt') at an in-situ grade of 58.8% iron ('Fe') estimated at a Fe cut-off of 40%

· 10% increase in Indicated Resource to 148.4Mt (from 134.4Mt)

· Updated Resource statement includes data from an additional 36 diamond drill holes

· Updated Resource further demonstrates the potential upside to the robust fundamentals demonstrated in the Preliminary Feasibility Study ('PFS')

o PFS was based on a maiden JORC Probable Reserve of 53.96Mt at a grade of 61.6% Fe (January 2014) which was derived from the August 2013 JORC Resource of 135.5Mt @ 59.4% Fe

· Metallurgical sampling on-going - shipment of the initial ~4,000kg of sample ore from Plateau 2 sent to Perth, Western Australia for sinter testing, decrepitation and drop testing

· Drill rig now repositioned on Plateau 3 for the purpose of generating additional material for metallurgical testwork and progressing the marketing study

· Reverse Circulation ('RC') infill drilling now completed on Plateaux 2 and 3 and samples being sent for testing

 

Sable Mining CEO Andrew Groves said, "This further Resource upgrade is another key objective secured in our development strategy for 2014. The Sable Mining team continue to drive progress at Nimba as we approach our ultimate goal of achieving commercial iron ore production at the end of 2015. In line with this, the additional components of our development continue to make headway; metallurgical testwork is underway to progress the marketing studies for our final product in addition to continuing encouraging discussions with the relevant authorities regarding our end-to-end logistics solution.

 

"I look forward to providing additional news on the deposit and infrastructure in due course as we look to unlock the significant value of Nimba for the benefit of all stakeholders. We continue to work closely with the governments of the Republic of Guinea and the Republic of Liberia and with their support, we remain focussed on opening up this region as a new development corridor between these two countries."

 

Table 1.1: Nimba Mineral resource statement for April 2014

Category

Fe Cut-off (%)

Tonnes* (Mt)

Bulk Density (t/m3)

Fe (%)

SiO2 (%)

Al2O3 (%)

P (%)

LOI (%)

Indicated

40

148.4

2.71

59.0

4.7

4.1

0.08

6.3

Inferred

40

33.4

2.67

57.7

5.3

5.0

0.08

6.6

Total

40

181.8

2.70

58.8

4.9

4.3

0.08

6.3

* The tonnage has been factored to account for cavities

Xstract Mining Consultants, an Australia-based consultancy group and wholly-owned subsidiary of engineering services company Calibre Group, which has significant expertise in iron ore, conducted the Updated Resource Estimate for Nimba.

 

The updated JORC code (2012) compliant resource estimate was conducted to incorporate an additional 36 diamond drillholes drilled at Plateau 3. The deposit consists of detrital iron mineralisation known as 'canga' that has been deposited in palaeochannels adjacent to the Mount Nimba mountain range.

 

Sable Mining has drilled 304 diamond drillholes in and around the current P2N, P2S, P2E, P3N and P3S areas. The majority of the drillholes are orientated vertically while the remaining 74 are inclined. The average depth drilled is 19.0 metres. The total length currently drilled in these areas is 5,772.8 metres. The drillholes are located along drill lines orientated north-easterly. The spacing of the drill lines and drillholes along the lines results in drilling grids of 400 metres by 400 metres, 200 metres by 200 metres and 100 metres by 100 metres.

 

Prior to November 2012, drillhole samples were prepared by ALS Bamako and analysed at ALS Ireland by XRF methods. After this date samples were prepared by ALS Bamako but analysed using XRF methods by Ultra Trace in Perth. The pre-November 2012 LOI results displayed a bias due to handling procedures at ALS Ireland and the pulps of these samples were re-assayed by Ultra Trace in Perth. The QAQC analyses show a marked improvement in accuracy and precision since the changeover.

 

The mineral resource estimate was completed in Datamine software using a three dimensional block model (parent block size of 100 metres by 100 metres by 6 metres in the X, Y and Z directions respectively). A full suite of Fe elements were estimated into the blocks using ordinary kriging from 1 metre composited drillhole samples. The estimation was restricted by project and domain code, while the search was restricted to the search ellipse and a maximum of five samples per drillhole. The search distance was based on the general semi-variogram range and the direction was dictated by the anisotropy evident in the semi-variogram fan. Statistical and spatial comparison of the block model grades to the drillhole samples shows strong similarities but a slight smoothing of the model has occurred due to drillhole spacing. The tonnage of each block has been adjusted by a factor that reflects the estimated proportion of cavities for each parent block, based on areas where such cavities have been recorded.

 

The Mineral Resource Statement has been compiled in the accordance with the guidelines defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). The JORC Table 1 is included at the end of this announcement.

 

The information in this announcement that relates to Mineral Exploration results and Mineral Resources, together with any related assessments and interpretations have been reviewed by a qualified geologist. Kevin Lowe, Principal Consultant Geologist at Xstract Mining Consultants Pty Ltd has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a qualified person as defined by the AIM Note for Mining and Oil & Gas Companies.

 

To view the appendix to this announcement, displaying the JORC 2012 Table 1, please click the following link:

 

http://www.rns-pdf.londonstockexchange.com/rns/2705F_-2014-4-22.pdf

 

 

** ENDS **

 

For further information please visit www.sablemining.com or contact:

Andrew Groves

Sable Mining Africa Ltd

Tel: 020 7408 9200

David Foreman

Cantor Fitzgerald Europe

Tel: 020 7894 7000

Stewart Dickson

Cantor Fitzgerald Europe

Tel: 020 7894 7000

Richard Greenfield

GMP Securities

Tel: 020 7647 2836

Andy Cuthill

Peat & Co.

Tel: 020 3540 1722

John Beaumont

Peat & Co.

Tel: 020 3540 1723

Susie Geliher

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Charlotte Heap

St Brides Media & Finance Ltd

Tel: 020 7236 1177

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEEFAEFLSELL
Date   Source Headline
23rd Apr 20147:00 amRNSResource Increase at Nimba Iron Ore Project
7th Apr 20147:00 amRNSNotice of AGM
3rd Mar 20147:00 amRNSPFS & Maiden JORC Reserve, Nimba Iron Ore Project
20th Jan 20147:00 amRNSBoard Changes
9th Jan 20147:00 amRNSHolding(s) in Company
23rd Dec 20137:00 amRNSInterim Results
13th Dec 20132:16 pmRNSBlock Listing Six Monthly Return
26th Nov 20137:00 amRNSInfrastructure MOU with Liberian Government
11th Nov 20137:00 amRNSJORC Resource Increase at Nimba Iron Ore Project
30th Oct 20137:00 amRNSOversubscribed Offering to Raise GBP17.1 million
29th Oct 20135:57 pmRNSOffering to Raise Approximately £15 million
14th Oct 20137:00 amRNSFurther High Grade DSO Results from Nimba Project
11th Oct 201310:00 amRNSUpdate on Export Decree for Nimba Iron Ore Project
7th Oct 20137:00 amRNSExport Decree Granted for Nimba Iron Ore Project
2nd Oct 20135:45 pmRNSHolding(s) in Company
30th Sep 20138:00 amRNSAnnual Report & Accounts
30th Sep 20137:00 amRNSMining Licence Granted at Nimba Iron Ore Project
24th Sep 20137:00 amRNSHigh Grade DSO Results from Expansion Drilling
18th Sep 20137:00 amRNSPositive Initial Results from Expansion Drilling
13th Sep 20137:00 amRNSResource at Nimba Iron Ore Project Increased
10th Sep 20137:00 amRNSFinal Results
30th Jul 20137:00 amRNSPositive Nimba Iron Ore Metallurgical Test Work
27th Jun 20134:35 pmRNSPrice Monitoring Extension
29th May 201312:00 pmRNSBlock Listing Six Monthly Return
16th May 20137:00 amRNSPositive Results from Kpo Iron Ore Project
13th May 20137:00 amRNSExpansion Drilling at Nimba Iron Ore Project
21st Mar 20133:00 pmRNSResult of AGM
21st Mar 20137:00 amRNSChange of Adviser
1st Mar 20134:20 pmRNSTotal Voting Rights
14th Feb 20137:00 amRNSNotice of AGM
5th Feb 20137:00 amRNSMaiden JORC Resource at Nimba Iron Ore Project
31st Jan 20137:00 amRNSTotal Voting Rights
9th Jan 20137:00 amRNSFurther high grade results at Nimba
21st Dec 20127:00 amRNSInterim Results
18th Dec 20127:00 amRNSAppointment of Joint Broker
13th Dec 20127:00 amRNSPositive Metallurgical Testwork from Nimba
29th Nov 20127:00 amRNSBlock Listing Six Monthly Return
27th Nov 20127:00 amRNSBoard Changes
5th Nov 20127:00 amRNSPositive Drill Results from Nimba Iron Ore Project
31st Oct 20127:00 amRNSTotal Voting Rights
24th Oct 20127:00 amRNSNimba Iron Ore Continues To Yield High Grades
28th Sep 20127:00 amRNSReport & Accounts
25th Sep 20127:00 amRNSHolding(s) in Company
7th Sep 201211:10 amRNSHolding(s) in Company
24th Aug 20127:00 amRNSFinal Results
1st Aug 20127:00 amRNSFurther Results Returned from Kpo Iron Ore Project
30th Jul 20127:00 amRNSPositive Assays from Nimba Iron Ore Project
24th Jul 201212:50 pmRNSHolding(s) in Company
20th Jul 20125:15 pmRNSHolding(s) in Company
11th Jul 20127:00 amRNSNimba Assay Results Confirm DSO Potential

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.