Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSable Mining Africa Regulatory News (SBLM)

  • There is currently no data for SBLM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Positive Results from First Phase Drilling at Lubu

7 Feb 2011 07:00

RNS Number : 7498A
Sable Mining Africa Limited
07 February 2011
 



Sable Mining Africa Ltd/ Index: AIM / Epic: SBLM / Sector: Natural Resources

7 February 2011

Sable Mining Africa Limited ('Sable Mining' or 'the Company')

Positive Results from First Phase Drilling at Lubu Coal Field in Zimbabwe

 

Sable Mining Africa Ltd, the AIM listed resource company, is pleased to announce a positive update on the Lubu Coal Concession ('Lubu'), which covers 19,236 hectares of the highly prospective Karro Mid-Zambezi coal basin in the established Hwange (Wankie) mining district in north-western Zimbabwe. The results confirm the potential of Lubu and importantly demonstrate the presence of a coking coal fraction in the Main Seam as well as in three other seams. 

 

A 30 borehole first phase drilling programme commenced on 4 October 2010 with three drill rigs and was completed on 15 December 2010. A total of 3,838m has been drilled in this phase and 197 samples have been submitted to the ALS Laboratory Group in Witbank, South Africa, for testing.

 

Modelling of the Main Seam has confirmed an upward revision of the inferred resource. In the 1980s, Messina Transvaal Development Services Ltd modelled an inferred resource of 360 million tonnes and that has now been increased to an initial figure of approximately 360 million tonnes of Main Seam coal only. The average thickness of this seam in these samples is 15.71m. No JORC or SAMREC compliant resource estimates currently exist for Lubu.

 

The initial 91 analytical sample results from the first five boreholes have been received back from the laboratory. These results have been encouraging as they confirm that coking coal is present, not only in the Main Seam, but also in the overlying 1A, 1B and 1C seams. Swelling Indices of up to 8 have been reported in these samples. Using a lower swelling index cut-off of 3 to define coking coal, 83% of the samples taken contain a coking coal fraction. The percentage yield for this coking fraction averages 21% in these samples.

 

Set out below is a summary of the sample results for the coking coal components intersected in the first five boreholes.

 

Coking Coal Sample Fractions:

 

B/H No.

1C Thick

1B Thick

1A Thick

MainThick

 

Min/Max Swells

Min/Max CV's

Min/Max ASH

Min/Max VOLS's

Average YIELDS

LCF006

62m coal zone

3.5/7.5

24.96/31.62

4.1/23.9

32.8/37.0

15%

LCF007

6.36m

4.60m

6.14m

11.60m

3.0/6.5

24.95/31.53

4.4/26.2

30.2/36.0

23%

LCF010

3.85m

7.20m

6.78m

14.96m

3.5/7.7

24.85/32.70

3.1/25.4

28.3/32.2

11%

LCF017

6.44m

4.80m

5.08m

18.00m

3.5/6.5

24.85/31.55

7.8/24.6

30.1/34.0

18%

LCF019

4.00m

7.00m

6.70m

18.26m

3.2/6.2

24.99/30.63

8.3/19.5

30.4/33.8

35%

BatchAve

5.16m

5.90m

6.18m

15.71m

3.0/7.7

24.85/32.70

3.1/26.2

28.3/37.0

21%

 

The 1A/B/C seams are being interpreted for consistency across the project area. 

 

Phase 2 of the drilling programme will begin shortly. This will both in-fill the Phase 1 drill holes, in order to publish a JORC compliant resource on Lubu, and start the drilling of Area 2, which is south of the current drill location.

 

The Company's on-site exploration team, led by Johan Erasmus (a competent person in terms of the SAMREC reporting code), has also identified two new areas within the Special Grant that present a good opportunity for additional shallow coal and thus an increase in the Company's resource tonnes.

 

Sable Mining CEO Andrew Groves said, "These are encouraging results and underpin the prospectivity of Lubu. The raised inferred resource of 360 million tonnes is based only on the Main Seam, so we expect a substantial upgrade of this figure when we receive the complete analysis from the drill holes. The coking coal fraction across multiple seams is significant and adds further value to the project. We now look forward to Phase 2 of the drilling programme, the results of which are intended to lead to the publication of a JORC resource and further value accredited to Lubu."

 

The information in this announcement that relates to Mineral Exploration results and Mineral Resources, together with any related assessments and interpretations, have been reviewed by Johan Erasmus, a qualified geologist and consultant to the Company. Johan Erasmus has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a qualified person as defined by the AIM Note for Mining and Oil & Gas Companies.

 

** ENDS **

 

For further information please visit www.sablemining.com or contact:

Andrew Groves

Sable Mining Africa Ltd

Tel: 020 7408 9200

Jonathan Wright

Seymour Pierce Ltd

Tel: 020 7107 8000

David Foreman

Seymour Pierce Ltd

Tel: 020 7107 8000

Robin Henshall

Matrix Corporate Capital

Tel: 020 3206 7000

Nick Stone

Matrix Corporate Capital

Tel: 020 3206 7000

Hugo de Salis

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Susie Geliher

St Brides Media & Finance Ltd

Tel: 020 7236 1177

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLTIMRTMBTMBFB
Date   Source Headline
23rd Apr 20147:00 amRNSResource Increase at Nimba Iron Ore Project
7th Apr 20147:00 amRNSNotice of AGM
3rd Mar 20147:00 amRNSPFS & Maiden JORC Reserve, Nimba Iron Ore Project
20th Jan 20147:00 amRNSBoard Changes
9th Jan 20147:00 amRNSHolding(s) in Company
23rd Dec 20137:00 amRNSInterim Results
13th Dec 20132:16 pmRNSBlock Listing Six Monthly Return
26th Nov 20137:00 amRNSInfrastructure MOU with Liberian Government
11th Nov 20137:00 amRNSJORC Resource Increase at Nimba Iron Ore Project
30th Oct 20137:00 amRNSOversubscribed Offering to Raise GBP17.1 million
29th Oct 20135:57 pmRNSOffering to Raise Approximately £15 million
14th Oct 20137:00 amRNSFurther High Grade DSO Results from Nimba Project
11th Oct 201310:00 amRNSUpdate on Export Decree for Nimba Iron Ore Project
7th Oct 20137:00 amRNSExport Decree Granted for Nimba Iron Ore Project
2nd Oct 20135:45 pmRNSHolding(s) in Company
30th Sep 20138:00 amRNSAnnual Report & Accounts
30th Sep 20137:00 amRNSMining Licence Granted at Nimba Iron Ore Project
24th Sep 20137:00 amRNSHigh Grade DSO Results from Expansion Drilling
18th Sep 20137:00 amRNSPositive Initial Results from Expansion Drilling
13th Sep 20137:00 amRNSResource at Nimba Iron Ore Project Increased
10th Sep 20137:00 amRNSFinal Results
30th Jul 20137:00 amRNSPositive Nimba Iron Ore Metallurgical Test Work
27th Jun 20134:35 pmRNSPrice Monitoring Extension
29th May 201312:00 pmRNSBlock Listing Six Monthly Return
16th May 20137:00 amRNSPositive Results from Kpo Iron Ore Project
13th May 20137:00 amRNSExpansion Drilling at Nimba Iron Ore Project
21st Mar 20133:00 pmRNSResult of AGM
21st Mar 20137:00 amRNSChange of Adviser
1st Mar 20134:20 pmRNSTotal Voting Rights
14th Feb 20137:00 amRNSNotice of AGM
5th Feb 20137:00 amRNSMaiden JORC Resource at Nimba Iron Ore Project
31st Jan 20137:00 amRNSTotal Voting Rights
9th Jan 20137:00 amRNSFurther high grade results at Nimba
21st Dec 20127:00 amRNSInterim Results
18th Dec 20127:00 amRNSAppointment of Joint Broker
13th Dec 20127:00 amRNSPositive Metallurgical Testwork from Nimba
29th Nov 20127:00 amRNSBlock Listing Six Monthly Return
27th Nov 20127:00 amRNSBoard Changes
5th Nov 20127:00 amRNSPositive Drill Results from Nimba Iron Ore Project
31st Oct 20127:00 amRNSTotal Voting Rights
24th Oct 20127:00 amRNSNimba Iron Ore Continues To Yield High Grades
28th Sep 20127:00 amRNSReport & Accounts
25th Sep 20127:00 amRNSHolding(s) in Company
7th Sep 201211:10 amRNSHolding(s) in Company
24th Aug 20127:00 amRNSFinal Results
1st Aug 20127:00 amRNSFurther Results Returned from Kpo Iron Ore Project
30th Jul 20127:00 amRNSPositive Assays from Nimba Iron Ore Project
24th Jul 201212:50 pmRNSHolding(s) in Company
20th Jul 20125:15 pmRNSHolding(s) in Company
11th Jul 20127:00 amRNSNimba Assay Results Confirm DSO Potential

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.