Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSable Mining Africa Regulatory News (SBLM)

  • There is currently no data for SBLM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Major Iron Ore Targets Defined in Liberia

3 Oct 2011 07:00

RNS Number : 3601P
Sable Mining Africa Limited
03 October 2011
 



Sable Mining Africa Ltd/ Index: AIM / Epic: SBLM / Sector: Natural Resources

3 October 2011

Sable Mining Africa Limited ('Sable Mining' or 'the Company')

Major Iron Ore Targets Defined at Timbo, Bopolu and Kpo in Liberia

 

Sable Mining Africa Limited, the AIM listed resource company, is pleased to announce the identification of multiple iron ore targets on the Company's Timbo, Bopolu and Kpo iron ore projects following completion of a 13,260 line km high resolution airborne geophysical survey. The Company's Liberian iron ore assets are located in the highly prospective West African Shield in Liberia, where a number of world class iron ore projects are currently being developed. 

 

Highlights:

 

§ 12 highly prospective targets with major magnetic signatures identified across three licences totalling 1,189.13km2 in Liberia

o Timbo - Two iron ore exploration targets with combined strike length of 22km

o Bopolu - Four iron ore exploration targets with combined 17km strike length

o Kpo - Six iron ore exploration targets with 57km combined strike length

§ 13,260 line km high resolution airborne geophysical survey (aeromagnetics and radiometrics) completed

§ Geophysical signatures identified, reflecting presence of major magnetic anomalies across surveyed areas which mirror historically itabirite iron formations

§ 34 hole, 12,000m Phase 1 drilling programme to commence in November

§ 25 of the holes totalling 8,000m are planned at Timbo North where 11km strike coincides with a prominent ridge

 

Sable Mining CEO Andrew Groves said, "Taken together, the anomalies identified across the licences by this latest geophysical survey point to a significant iron ore asset lying within easy reach of existing infrastructure. The sub-region of Liberia, Sierra Leone, Guinea and the Ivory Coast hosts several multi-billion tonne iron ore assets that are currently under exploration and development. Upon the completion of our exploration campaign, we are confident that our licences will add to the list of world class assets in the region. With this in mind we look forward to commencing Phase 1 of our drilling programme in November as we continue to advance our Liberian assets through the development cycle." 

 

Sable Mining has received the interpretation of the data collected during the recently completed 13,260 line km airborne aeromagnetic and radiometric surveys covering the Company's Timbo, Bopolu and Kpo iron ore projects in Liberia. 12 exploration targets have been identified as a result of the survey, across all three of the Company's licences.

 

Timbo Iron Ore Project, Central Liberia:

 

4,980 line km were flown across the Timbo iron ore project, located on the 349.13km2 licence area, resulting in two iron ore exploration targets being identified with a combined strike length of 22km. The Timbo North target area lies within the Kaba mountain range, situated within Archaean aged iron-bearing greenstone belts intercalated with deformed, metamorphosed granitoid-gneiss basement rocks. Mapping undertaken to date indicates that the Timbo North ridge comprises an approximately 11km long, discontinuous iron rich (Itabirite / Banded Iron Formation ('BIF')) ridge. Importantly the targets are located within 50km of existing rail link and 90km from the port of Buchanan. Initial ground mapping across Timbo North has also been completed during which 68 grab samples were collected. The assay results are awaited.

 

Bopolu Iron Ore Project, Northern Liberia:

 

At the 308km2 Bopolu licence, 5,000 line km were flown resulting in the identification of four iron ore exploration targets with a combined strike length of 17km. The Bopolu iron ore target areas are situated at the southern end of the Kpo mountain range within Archaean aged, iron-bearing greenstone belts intercalated with deformed, metamorphosed, granitoid-gneiss basement rocks. The target areas are associated with a historically mapped itabirite iron formation. These targets also benefit from proximal infrastructure including the Bong railway which is located 60km away.

 

Kpo Iron Ore Project, Northern Liberia:

 

3,280 line km flown over the Kpo iron ore prospects located on the 532km2 licence, resulted in six iron ore exploration targets being identified with a combined strike length of 57km. The target areas delineated by the high resolution airborne geophysical survey are associated with historically mapped bearing itabirite iron formation within the Kpo mountain range and are within 60km of the existing Bong railway.

 

Exploration Programme:

 

The next stage of the exploration programme consists of a 12,000m, 34 hole, Phase 1 drilling programme scheduled to commence in November 2011. 25 of the holes totalling 8,000m are planned at Timbo North where the 11km long priority geophysical signature coincides with a prominent ridge. Phase 1 has been designed to test the highest priority magnetic signatures, to refine the geological model, and to progress the project towards a potential maiden iron ore resource estimate in 2012.

 

The remaining nine holes (4,000m) are planned on Bopolu and Kpo (2,000m on each licence) to investigate the potential of the southern most portion of the respective target areas.

 

 

SRK has been retained by the Company to review the upcoming exploration programme to ensure its compliance with international reporting standards.

 

Infrastructure

 

Despite heavy rains, the road construction that commenced in late June 2011 to access the Timbo North project area has been completed. Work on the access to Timbo South is ongoing. Construction of the exploration camp is currently underway with completion expected in November 2011. To date, 120km of the road that will enable access into the Bopolu-Kpo target areas, has been rehabilitated. 

 

** ENDS **

 

For further information on the Company, visit: www.sablemining.com or contact:

 

Andrew Groves

Sable Mining Africa Ltd

Tel: 020 7408 9200

Jonathan Wright

Seymour Pierce Ltd

Tel: 020 7107 8000

David Foreman

Seymour Pierce Ltd

Tel: 020 7107 8000

Nick Stone

Matrix Corporate Capital

Tel: 020 3206 7000

Richard Greenfield

GMP Securities Europe LLP

Tel: 020 7647 2836

Hugo de Salis

St Brides Media & Finance Ltd

Tel: 020 7236 1177

Susie Geliher

St Brides Media & Finance Ltd

Tel: 020 7236 1177

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCURVVRAKAKOAR
Date   Source Headline
10th Jul 20129:45 amRNSHolding(s) in Company
29th Jun 201210:10 amRNSHolding(s) in Company
28th Jun 20124:05 pmRNSDelta Mining Consolidated Corporate Update
13th Jun 20127:00 amRNSUpdate on Exploration Activities
11th Jun 20127:00 amRNSPositive Results From KPO Iron Ore Project
6th Jun 20127:00 amRNSPreliminary Assay Results Nimba Project
31st May 20123:40 pmRNSTotal Voting Rights and Share Capital
30th May 201211:30 amRNSHolding(s) in Company
30th May 20127:00 amRNSDrill Results from the Nimba Iron Ore Project
24th May 20127:00 amRNSBlock Admission
21st May 201212:10 pmRNSHolding(s) in Company
26th Apr 201210:15 amRNSHolding(s) in Company
26th Apr 201210:00 amRNSResult of AGM
23rd Apr 20124:30 pmRNSHolding(s) in Company
12th Apr 20127:00 amRNSAppointment of Non-Executive Director
5th Apr 20124:39 pmRNSHolding(s) in Company
28th Mar 20127:00 amRNSUpdate on DMC
26th Mar 20127:00 amRNSPositive Update on Iron Ore Deposits, Guinea
19th Mar 20127:00 amRNSNotice of AGM
1st Mar 20122:30 pmRNSHolding(s) in Company
21st Feb 20127:00 amRNSHolding(s) in Company
16th Feb 201210:30 amRNSHolding(s) in Company
9th Feb 20127:00 amRNSHolding(s) in Company
2nd Feb 20127:00 amRNSExpansion of Iron Ore Portfolio
21st Dec 20113:45 pmRNSInterim Results
28th Nov 20117:00 amRNSKakoulima Project Update
15th Nov 201110:00 amRNSHolding(s) in Company
5th Oct 20117:15 amRNSAppointment of Executive Director
5th Oct 20117:00 amRNSCoal Update
3rd Oct 20117:00 amRNSMajor Iron Ore Targets Defined in Liberia
22nd Sep 201111:45 amRNSDirector Dealings
2nd Sep 20111:40 pmRNSHolding(s) in Company
30th Aug 20113:05 pmRNSPosting of Annual Report & Accounts
22nd Aug 20118:35 amRNSDirector Dealings
25th Jul 20117:00 amRNSFinal Results
21st Jun 20119:45 amRNSChange of Registered Office
14th Jun 20117:00 amRNSAcquires interest in Mount Kakoulima Permit
6th Jun 20117:00 amRNSAcquires Interest in Lubimbi Coal Project
2nd Jun 20119:57 amRNSHolding(s) in Company
31st May 20117:00 amRNSAppointment of Joint Broker
12th May 20117:00 amRNSHolding(s) in Company
11th May 20117:00 amRNSBFS on Rietkuil Coal Project
4th May 20117:00 amRNSSpringbok Flats Coal Project Update
18th Apr 20114:20 pmRNSHolding(s) in Company
15th Apr 20112:50 pmRNSHolding(s) in Company
14th Apr 20116:17 pmRNSUpdate regarding Bagla Hills Iron Ore Project
6th Apr 20117:00 amRNS786 Mt Coal Seam Tonnage Modelled at Lubu Project
5th Apr 20117:00 amRNSAcquires Bagla Hills Iron Ore Project
29th Mar 20113:40 pmRNSHolding(s) in Company
28th Mar 20117:00 amRNSPositive Results from Lubu Coal Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.