Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSable Mining Africa Regulatory News (SBLM)

  • There is currently no data for SBLM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further high grade results at Nimba

9 Jan 2013 07:00

RNS Number : 1220V
Sable Mining Africa Limited
09 January 2013
 



Sable Mining Africa Ltd / Index: AIM / Epic: SBLM / Sector: Natural Resources

9 January 2013

Sable Mining Africa Limited ('Sable Mining' or 'the Company')

Further High Grade Drill Results from the Nimba Iron Ore Project

 

Sable Mining Africa Limited, the AIM listed exploration company, is pleased to announce further positive high grade assay results from the Company's on-going exploration programme at the 123.5 sq km Nimba Iron Ore Project in south-east Guinea ('Nimba Project').

 

Overview

·; High grade assay results continue to underpin Nimba Project as one of West Africa's premier iron ore projects

·; Direct Shipping Ore ('DSO') potential of Nimba Project further reinforced

·; Results from an additional 15 diamond drill holes completed on the main canga channel and inter-channel area on Plateau 2

·; Highest grade intercept from surface on main canga of 17m @ 64.17% iron ('Fe')

·; Additional high grade intercepts include:

o 37.45m @ 64.10% Fe

o 8.10m @ 62.37% Fe

·; Initial Decrepitation Index ("DI") tests indicate very low decrepitation - therefore suitable for metallurgical processes

·; Recent metallurgical test results at Nimba Project indicate that simple crush and screen processing should produce high-grade, high-specification low-deleterious premium quality DSO product

·; Drilling on-going and remains focussed on targeting additional haematite bearing intersections of canga material

·; Current exploration target of up to 200Mt of canga material and on track to delineate a maiden JORC resource in Q1 2013

 

Sable Mining CEO Andrew Groves said, "Nimba continues to deliver results which underpin its potential to be one of the premier undeveloped DSO assets globally. These latest results of our 145 hole drilling campaign to date, continue to highlight the excellent grade continuity, good thickness from surface and low DI which confirms the ore is suitable for metallurgical processes. Indeed, the recent metallurgical tests results showed a grade of 65.8% Fe and a fines product of 63.8% Fe grade, confirming that the ore quality appears better than the Majors producing in Western Australia. We remain determined to accelerate our exploration work in order to define what we believe will be a significant maiden JORC resource in Q1 2013."

 

Plateau 2 Drilling Results:

 

The 35 sq km Plateau 2 remains the primary area of focus for the publication of a maiden JORC resource.

 

Of the 15 results returned for Plateau 2, 10 (P2.12-047 to 053, 057, 058 and 060) were from holes drilled into the main channel fill area. These holes returned a weighted average grade of 62.15% Fe over an average drilled width of 20.04m. Once again contaminants were low, averaging 2.93% SiO2, 2.96%Al2O3 and 0.08%P for the combined results.

 

Table 1: Assay Results for Plateau 2 Main Canga Channel Area, Nimba Licence (Analysis by Ultratrace Laboratories, Australia for diamond drill hole composites)

 

Borehole
From
To
Thickness (m)
%Fe
%SiO2
%Al2O3
%P
P2.12-047
0.00
19.80
19.80
62.35
1.83
3.10
0.07
P2.12-048
0.00
27.80
27.80
60.43
3.72
3.96
0.10
P2.12-049
0.00
19.50
19.50
58.74
4.71
4.74
0.07
P2.12-050
0.00
37.45
37.45
64.10
2.07
1.63
0.09
P2.12-051
0.00
30.30
30.30
61.94
4.30
2.42
0.07
P2.12-052
0.00
5.70
5.70
59.34
3.09
5.41
0.07
P2.12-053
0.00
16.33
16.33
62.11
2.44
3.17
0.07
P2.12-057
0.00
8.10
8.10
62.37
1.86
3.65
0.07
P2.12-058
0.00
18.40
18.40
63.43
2.77
2.20
0.06
P2.12-060
0.00
17.00
17.00
64.17
1.48
2.49
0.06
AVERAGE
 
 
20.04
62.15
2.93
2.96
0.08
 

 

The drilling campaign has continued to test the plateau areas between the primary channel canga targets for additional beneficiable material. The results for the five additional holes (P2.12-046, 054 to 056 and 059) designed to test the inter channel areas are summarised below (thicknesses quoted are drilled widths). The five drill holes returned a weighted average grade of 41.89% Fe over an average drilled width of 6.46m. Contaminants returned averaged 12.14% SiO2, 16.35%Al2O3 and 0.08%P for the combined results.

 

Table 2: Assay Results for Plateau 2 Inter-Channel Area, Nimba Licence (Analysis by Ultratrace Laboratories, Australia for diamond drill hole composites)

 

Borehole
From
To
Thickness (m)
%Fe
%SiO2
%Al2O3
%P
P2.12-046
0.00
8.28
8.28
43.39
13.40
14.28
0.05
P2.12-054
0.00
5.43
5.43
36.96
13.49
20.22
0.13
P2.12-055
0.00
5.50
5.50
37.02
12.66
20.77
0.11
P2.12-056
0.00
6.20
6.20
44.83
12.06
13.08
0.08
P2.12-059
0.00
6.90
6.90
45.19
9.23
15.12
0.06
AVERAGE
 
 
6.46
41.89
12.14
16.35
0.08
 

Initial DI tests have been completed on four composite samples. These composites were separated into two high grade composites and two medium grade composites representing the consolidated/hard and unconsolidated/soft zones. The average DI6.3 was less than 10 for all four samples tested. Additional sample material is being sourced to confirm these results which indicate that the lump ore from the consolidated zone has very low decrepitation.

 

Based on the JSM DI standard (DI5.0) the lump for the consolidated zone has a far lower decrepitation than both BHPB's MAC and Newman HG lump products.#

 

#BHP Billiton product specification (March 2012), www.bhpbillition.com

The information in this announcement that relates to Mineral Exploration results and Mineral Resources, together with any related assessments and interpretations have been reviewed by Mark Biddulph, a qualified geologist. Mark Biddulph has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a qualified person as defined by the AIM Note for Mining and Oil & Gas Companies.

** ENDS **

 

For further information please visit www.sablemining.com or contact:

Andrew Groves

Sable Mining Africa Ltd

Tel: 020 7408 9200

Jonathan Wright

Seymour Pierce Ltd

Tel: 020 7107 8000

David Foreman

Seymour Pierce Ltd

Tel: 020 7107 8000

Richard Greenfield

GMP Securities

Tel: 020 7647 2836

Susie Geliher

St Brides Media & Finance Ltd

Tel: 020 7236 1177

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBKLBBXFFFBBF
Date   Source Headline
10th Jul 20129:45 amRNSHolding(s) in Company
29th Jun 201210:10 amRNSHolding(s) in Company
28th Jun 20124:05 pmRNSDelta Mining Consolidated Corporate Update
13th Jun 20127:00 amRNSUpdate on Exploration Activities
11th Jun 20127:00 amRNSPositive Results From KPO Iron Ore Project
6th Jun 20127:00 amRNSPreliminary Assay Results Nimba Project
31st May 20123:40 pmRNSTotal Voting Rights and Share Capital
30th May 201211:30 amRNSHolding(s) in Company
30th May 20127:00 amRNSDrill Results from the Nimba Iron Ore Project
24th May 20127:00 amRNSBlock Admission
21st May 201212:10 pmRNSHolding(s) in Company
26th Apr 201210:15 amRNSHolding(s) in Company
26th Apr 201210:00 amRNSResult of AGM
23rd Apr 20124:30 pmRNSHolding(s) in Company
12th Apr 20127:00 amRNSAppointment of Non-Executive Director
5th Apr 20124:39 pmRNSHolding(s) in Company
28th Mar 20127:00 amRNSUpdate on DMC
26th Mar 20127:00 amRNSPositive Update on Iron Ore Deposits, Guinea
19th Mar 20127:00 amRNSNotice of AGM
1st Mar 20122:30 pmRNSHolding(s) in Company
21st Feb 20127:00 amRNSHolding(s) in Company
16th Feb 201210:30 amRNSHolding(s) in Company
9th Feb 20127:00 amRNSHolding(s) in Company
2nd Feb 20127:00 amRNSExpansion of Iron Ore Portfolio
21st Dec 20113:45 pmRNSInterim Results
28th Nov 20117:00 amRNSKakoulima Project Update
15th Nov 201110:00 amRNSHolding(s) in Company
5th Oct 20117:15 amRNSAppointment of Executive Director
5th Oct 20117:00 amRNSCoal Update
3rd Oct 20117:00 amRNSMajor Iron Ore Targets Defined in Liberia
22nd Sep 201111:45 amRNSDirector Dealings
2nd Sep 20111:40 pmRNSHolding(s) in Company
30th Aug 20113:05 pmRNSPosting of Annual Report & Accounts
22nd Aug 20118:35 amRNSDirector Dealings
25th Jul 20117:00 amRNSFinal Results
21st Jun 20119:45 amRNSChange of Registered Office
14th Jun 20117:00 amRNSAcquires interest in Mount Kakoulima Permit
6th Jun 20117:00 amRNSAcquires Interest in Lubimbi Coal Project
2nd Jun 20119:57 amRNSHolding(s) in Company
31st May 20117:00 amRNSAppointment of Joint Broker
12th May 20117:00 amRNSHolding(s) in Company
11th May 20117:00 amRNSBFS on Rietkuil Coal Project
4th May 20117:00 amRNSSpringbok Flats Coal Project Update
18th Apr 20114:20 pmRNSHolding(s) in Company
15th Apr 20112:50 pmRNSHolding(s) in Company
14th Apr 20116:17 pmRNSUpdate regarding Bagla Hills Iron Ore Project
6th Apr 20117:00 amRNS786 Mt Coal Seam Tonnage Modelled at Lubu Project
5th Apr 20117:00 amRNSAcquires Bagla Hills Iron Ore Project
29th Mar 20113:40 pmRNSHolding(s) in Company
28th Mar 20117:00 amRNSPositive Results from Lubu Coal Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.