Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSable Mining Africa Regulatory News (SBLM)

  • There is currently no data for SBLM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drill Results from the Nimba Iron Ore Project

30 May 2012 07:00

RNS Number : 3475E
Sable Mining Africa Limited
30 May 2012
 



Sable Mining Africa Ltd / Index: AIM / Epic: SBLM / Sector: Natural Resources

30 May 2012

Sable Mining Africa Limited ('Sable Mining' or 'the Company')

Further Drill Results from the Nimba Iron Ore Project

 

Sable Mining Africa Limited, the AIM listed resource company, is pleased to announce further wide haematite bearing intersections of up to 29.7 metres from the Company's reconnaissance drilling campaign at the 123.5 sq km Nimba Iron Ore Project in south-east Guinea ('Nimba'). These additional results from surface, in tandem with the first set of results announced on 8 May 2012, reporting intervals of up to 31.7 metres, underpin Nimba's iron ore potential.

 

The reconnaissance drilling campaign commenced in April 2012 and 16 holes have been completed to date. Two rigs are now employed on the site, both operating on the second of the three plateaux west of the village of Borata. This plateau covers 11.8 sq km of the total plateaux area of 35 sq km at the base of Mount Nimba. All ten holes completed have shown Canga-type material with zones of cemented conglomerate, gravels and clay-rich gravels all containing haematite. Five holes have shown intersections of greater than 16.50 metres, with the tenth hole achieving an intersection of 29.70 metres and the seventh 21.30 metres of haematite conglomerate before intersecting underlying granites. 

 

A summary of intersections for each completed hole is given in the following table:

 

Hole ID

Intersection from (m)

Intersection to (m)

Interval (m)

Description

32

0.00

18.80

18.80

Canga/Hematite

22

0.00

7.77

7.77

Canga/Hematite

23

0.00

18.50

18.50

Canga/Hematite

13

0.00

9.30

9.30

Canga/Hematite

41

0.00

10.05 

10.05

Canga/Hematite

42

0.00

8.90

8.90

Canga/Hematite

30

0.00

21.30

21.30

Canga/Hematite

59

0.00

4.65

4.65

Canga/Hematite

60

0.00

6.55

6.55

Canga/Hematite

29

0.00

29.70

29.70

Canga/Hematite

 

Core from the 12 holes that have been drilled has been sent to Stewart Group in Dublin for analysis. The Company expects to receive results from this analysis by the end of June 2012.

 

Access to the third plateau to the south-west of the second plateau is well advanced and reconnaissance drilling will commence shortly. Plateau three covers an area of 12.5 sq km and dozed access routes have confirmed the presence of extensive areas of haematite on surface and on the plateau flanks.

 

Sable Mining CEO Andrew Groves said, "The continued presence of wide Canga-type intersections reinforces our confidence in the large scale iron ore resource potential of Nimba. We are expecting further grab sample results, the first batch having already demonstrated high grades of up to 68% iron, and we are looking forward to confirming the direct shipping ore potential of this project."

 

Additional Information:

 

The reconnaissance drilling campaign is aimed at confirming large volumes of Canga-type iron ore following the previously reported grab sampling which confirmed the presence of high grade material of up to 68% iron. The drilling is in line with the Company's strategy to rapidly prove up a JORC compliant resource at Nimba, where surface sampling and geology has demonstrated potential for a multi-hundred million tonne resource with direct shipping ore potential.

 

** ENDS **

 

For further information please visit www.sablemining.com or contact:

Andrew Groves

Sable Mining Africa Ltd

Tel: 020 7408 9200

Jonathan Wright

Seymour Pierce Ltd

Tel: 020 7107 8000

David Foreman

Seymour Pierce Ltd

Tel: 020 7107 8000

Richard Greenfield

GMP Securities

Tel: 020 7647 2836

Susie Geliher

St Brides Media & Finance Ltd

Tel: 020 7236 1177

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCZKLFLLEFZBBV
Date   Source Headline
23rd Apr 20147:00 amRNSResource Increase at Nimba Iron Ore Project
7th Apr 20147:00 amRNSNotice of AGM
3rd Mar 20147:00 amRNSPFS & Maiden JORC Reserve, Nimba Iron Ore Project
20th Jan 20147:00 amRNSBoard Changes
9th Jan 20147:00 amRNSHolding(s) in Company
23rd Dec 20137:00 amRNSInterim Results
13th Dec 20132:16 pmRNSBlock Listing Six Monthly Return
26th Nov 20137:00 amRNSInfrastructure MOU with Liberian Government
11th Nov 20137:00 amRNSJORC Resource Increase at Nimba Iron Ore Project
30th Oct 20137:00 amRNSOversubscribed Offering to Raise GBP17.1 million
29th Oct 20135:57 pmRNSOffering to Raise Approximately £15 million
14th Oct 20137:00 amRNSFurther High Grade DSO Results from Nimba Project
11th Oct 201310:00 amRNSUpdate on Export Decree for Nimba Iron Ore Project
7th Oct 20137:00 amRNSExport Decree Granted for Nimba Iron Ore Project
2nd Oct 20135:45 pmRNSHolding(s) in Company
30th Sep 20138:00 amRNSAnnual Report & Accounts
30th Sep 20137:00 amRNSMining Licence Granted at Nimba Iron Ore Project
24th Sep 20137:00 amRNSHigh Grade DSO Results from Expansion Drilling
18th Sep 20137:00 amRNSPositive Initial Results from Expansion Drilling
13th Sep 20137:00 amRNSResource at Nimba Iron Ore Project Increased
10th Sep 20137:00 amRNSFinal Results
30th Jul 20137:00 amRNSPositive Nimba Iron Ore Metallurgical Test Work
27th Jun 20134:35 pmRNSPrice Monitoring Extension
29th May 201312:00 pmRNSBlock Listing Six Monthly Return
16th May 20137:00 amRNSPositive Results from Kpo Iron Ore Project
13th May 20137:00 amRNSExpansion Drilling at Nimba Iron Ore Project
21st Mar 20133:00 pmRNSResult of AGM
21st Mar 20137:00 amRNSChange of Adviser
1st Mar 20134:20 pmRNSTotal Voting Rights
14th Feb 20137:00 amRNSNotice of AGM
5th Feb 20137:00 amRNSMaiden JORC Resource at Nimba Iron Ore Project
31st Jan 20137:00 amRNSTotal Voting Rights
9th Jan 20137:00 amRNSFurther high grade results at Nimba
21st Dec 20127:00 amRNSInterim Results
18th Dec 20127:00 amRNSAppointment of Joint Broker
13th Dec 20127:00 amRNSPositive Metallurgical Testwork from Nimba
29th Nov 20127:00 amRNSBlock Listing Six Monthly Return
27th Nov 20127:00 amRNSBoard Changes
5th Nov 20127:00 amRNSPositive Drill Results from Nimba Iron Ore Project
31st Oct 20127:00 amRNSTotal Voting Rights
24th Oct 20127:00 amRNSNimba Iron Ore Continues To Yield High Grades
28th Sep 20127:00 amRNSReport & Accounts
25th Sep 20127:00 amRNSHolding(s) in Company
7th Sep 201211:10 amRNSHolding(s) in Company
24th Aug 20127:00 amRNSFinal Results
1st Aug 20127:00 amRNSFurther Results Returned from Kpo Iron Ore Project
30th Jul 20127:00 amRNSPositive Assays from Nimba Iron Ore Project
24th Jul 201212:50 pmRNSHolding(s) in Company
20th Jul 20125:15 pmRNSHolding(s) in Company
11th Jul 20127:00 amRNSNimba Assay Results Confirm DSO Potential

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.