Andrada Mining acquisition elevates the miner to emerging mid-tier status. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.045
Bid: 0.04
Ask: 0.05
Change: 0.00 (0.00%)
Spread: 0.01 (25.00%)
Open: 0.045
High: 0.045
Low: 0.045
Prev. Close: 0.045
RRR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Migori Update

15 Mar 2010 07:00

RNS Number : 5351I
Red Rock Resources plc
15 March 2010
 



RED ROCK RESOURCES PLC

 

Migori: Exploration Update and Sample Results

 

Dated: 15 March 2010

 

Red Rock Resources plc ('Red Rock' or the 'Company') the mining exploration and mineral investment company with interests in steel feed, uranium, and gold, announces exploration progress at its Migori gold project in Kenya.

 

A percussion drilling programme was carried out in late 2009 in order to test the remnant mineralisation of the Macalder tailings. Thirty-two holes (totalling 358m) were drilled on a 25x25 metre grid in December 2009, followed by approximately 100m of infill drilling (six holes) in January 2010. Samples from these holes were dried out at the base camp (in preparation for the laboratory test work) and logged in order to determine the spatial distribution of the calcine and sulphide zones. At the end of February 2010, the samples were transported to the laboratory in Mwanza and are currently being prepped for ICP analysis and gold and base metal assaying. Some samples will be subsequently sent to Perth for metallurgical analysis and leach tests.

 

In late 2009 and early 2010, 507m of reverse circulation ('RC') drilling was completed on the Migori licences. The eleven holes were drilled over the period December 2009-January 2010 at four main targets across both licence areas, SPL122 and SPL202. In the western licence (SPL122) four holes were drilled at the Macalder gossan and two at Gori Maria; and in the eastern licence (SPL202), four holes were drilled at Carlos Far West (Mwiro) and one at Nyabisawa. Since the drilling, the samples have been logged at the Mikei base camp and are being prepared for transportation to the laboratory in Mwanza, Tanzania. The samples will then be assayed for gold and base metals.

 

Migori Project - Simplified geology map:

http://www.rns-pdf.londonstockexchange.com/rns/5351I_1-2010-3-12.pdf

 

In the eastern licence, the Nyabisawa locality hosts intensely sheared banded iron formations ('BIFs') whilst at Mwiro the target rock type consists of graphitic schists. The main finding during the logging exercise was the presence of hydrothermal material in the vicinity of the sulphidic BIF unit intersected in the hole at Nyabisawa.

 

Regional prospecting has been simultaneously underway, focusing on other BIF related targets at Karutiange, Francis 2 and North of Lake Bush (all in the eastern licence). A more rigorous and systematic RC (and eventually diamond) drilling programme is anticipated in the near future in order to fully test these (and other similar) targets. Also evaluated and readied for drilling were the Nyatworo vein body and the Nyarongi prospects (both in the western licence).

 

During the December 2009-January 2010 exploration phase, the last five cores (MD32-MD36), from the diamond drilling campaign by Kansai in 2007, were logged and sampled. Samples were sent for analysis in Mwanza in mid-January 2010 and the results received in mid-February. The following table shows a summary of the results from all eleven drill holes that were drilled in 2007.

 

 

 

 

 

 

Location

Hole ID

Mineralisation Depth

Thickness and Average Grade

Range

Gori Maria

MD26

54-62m

8m@0.91g/t Au

0.02-4.00g/t

MD27

97-118m 138-151m

21m@0.86g/t Au 13m@1.69g/t Au

0.04-4.15g/t 0.02-5.10g/t

MD28

80-82m 85-87m 95-118m

2m@1.11g/t Au 2m@2.42g/t Au 23m@0.79g/t Au

0.92-1.26g/t 1.28-3.60g/t 0.03-2.50g/t

Macalder Gossan

MD29

46-55m 81-88m

9m@1.13g/t Au 7m@1.00g/t Au

0.00-3.50g/t 0.01-3.80g/t

MD30

66-67m 66-70m 72-76m

1m@39.33g/t Au 4m@6.38g/t Au 4m@1.08g/t Au

35.25-42.00g/t 0.01-42.00g/t 0.14-3.25g/t

MD31

Short hole (drill hit stope) - few samples - no significant intersections

MD32

107-111m 121-125m

4m@1.06g/t Au 4m@1.03g/t Au

0.22-3.45g/t 0.15-1.67g/t

Nyanza

MD33

26-31m

5m@0.98g/t Au

0.02-4.15g/t

MD34

28-29m 60-62m 79-83m

1m@1.05g/t Au 2m@0.85g/t Au 4m@0.86g/t Au

0.97-1.12g/t 0.18-1.57g/t

MD35

95-101m

6m@0.92g/t Au

0.07-3.23g/t

MD36

24-27m 72-73m

3m@0.85g/t Au 1m@1.09g/t Au

0.37-1.56g/t 1.08-1.10g/t

 

These results were found by first taking the weighted average of the Au grades at each metre (i.e. the mean value of the Au assay result and the results from repeat tests), then finding the average grade over the entire thickness of the mineralised intersection. Maximum and minimum grades in the 'Range' column are actual, measured values. The cut-off grade is 0.25g/t, however lower values were incorporated into the averages where mineralised intersections were disseminated and intersected by minor intervals of lower grade mineralisation (i.e. anomalous, low values). Reported averages over mineralised intersections contain an Au grade greater than, or equal to, 0.85g/t (except in the case of MD28 95-118m where the column of mineralisation is so long).

 

These holes were drilled as part of a broader infill diamond drilling programme which began in 2004, with the aim of augmenting the historic resource estimates at the four main mineralised targets: Gori Maria, KKM, MK and Nyanza. Following initial exploration at the four targets in 2004, results from drilling were used to formulate a NI43-101 compliant indicated resource estimate, reported in a 2006 technical review. Diamond drilling continued in 2006 and 2007 however, due to civil commotion following the election, Kansai were unable to complete testing of the 2007 drill core and so this was deemed a priority when exploration re-commenced in 2009.

 

With all sample results from previous exploration now available, the data is being processed and will be reviewed and analysed by an independent resource analyst. The data will be combined with those from the current exploration programme with the intention of generating an up-to-date NI43-101 compliant revision of the resource estimate.

 

The end of February 2010 saw the commencement of a trenching programme at the Mirema prospect. This was designed to locate the source of the gold in the rich artisanal deposits downstream. The programme is currently ongoing and so far two channels have been completed, both cutting substantial quartz bodies. The trenching is continuing along the trend of the quartz in order to delineate its full extent. Following this phase of trenching, another one will commence at Makuru hill (a large BIF exposure in the western licence).

 

The technical information in this announcement has been prepared by Kamini Manick, MSc and approved for release by Helen Salmon, BSc, FGS, who is a qualified person as defined in the Note for Mining and Oil & Gas Companies, June 2009, of the London Stock Exchange.

 

The Company also announces that Blomfield Corporate Finance Limited, the Company's Nominated Adviser has changed its name to Religare Capital Markets (UK) Limited - trading as Religare Capital Markets.

 

For further information contact:

 

Red Rock Resources plc

 

Andrew Bell, Chairman

0207 402 4580/07766 474849

John Watkins

07768 512404

 

 

Nominated Adviser

 

Religare Capital Markets

 

Peter Trevelyan-Clark/Ben Jeynes

020 7444 0800

 

 

Broker

 

Simple Investments Ltd

 

Nick Emerson, Renato Rufus

01483 413500

 

 

Public Relations

 

Lothbury Financial Limited

 

Ron Marshman

020 7011 9411

 

 

Updates on the Company's activities are regularly posted on its website www.rrrplc.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUUANRROAOAAR
Date   Source Headline
19th Jun 202312:30 pmRNSHolding(s) in Company
16th Jun 20234:00 pmRNSHolding(s) in Company
16th Jun 20232:57 pmRNSGrant of First Cote D'Ivoire Licence
15th Jun 202312:00 pmRNSLithium Update
2nd Jun 20233:27 pmRNSHolding(s) in Company
2nd Jun 20232:48 pmRNSNotice of General Meeting
30th May 20236:17 pmRNSIssue of Equity and Total Voting Rights
30th May 20235:17 pmRNSIssue of Equity and Total Voting Rights
24th May 202312:09 pmRNSIssue of Equity and Total Voting Rights
23rd May 20234:40 pmRNSHolding(s) in Company
16th May 20235:03 pmRNSHolding(s) in Company
12th May 20234:31 pmRNSHolding(s) in Company
12th May 20237:00 amRNSIssue of Equity, PDMR/Director Holdings, TVR
11th May 20237:00 amRNSIssue of Equity and Total Voting Rights
5th May 20233:45 pmRNSVictoria Goldfields - Berringa Drilling Results
4th May 20232:40 pmRNSIssue of Shares and Total Voting Rights
14th Apr 20237:00 amRNSIssue of Equity
4th Apr 20237:00 amRNSPlacing and TVR
3rd Apr 20237:00 amRNSHalf-year Report
31st Mar 20234:27 pmRNSTotal Voting Rights
28th Mar 20237:00 amRNSEIA submitted for Zimbabwe lithium mining project
15th Mar 20232:36 pmRNSIssue of Equity
15th Mar 202312:15 pmRNSVictoria Goldfields, Australia - drilling update
8th Mar 20237:00 amRNSAsset Review and Current Developments
24th Feb 202310:05 amRNSIssue of Equity
16th Feb 202310:00 amRNSVictoria Goldfields - Beringa Update
10th Feb 20235:26 pmRNSResult of AGM
6th Feb 202311:00 amRNSPrice Monitoring Extension
11th Jan 20234:50 pmRNSNotice of AGM
9th Jan 202311:00 amRNSVictoria Goldfields Australia - Update
6th Jan 20237:00 amRNSBurkino Faso Exploration Update - Bilbale Project
29th Dec 202212:14 pmRNSFinal Results
19th Dec 202212:39 pmRNSDevelopment of Lithium Assets
16th Dec 202211:05 amRNSSecond Price Monitoring Extn
16th Dec 202211:00 amRNSPrice Monitoring Extension
15th Dec 20227:00 amRNSFund Raising
13th Dec 20227:00 amRNSDrilling begins at Historic Berringa Gold Mine
8th Dec 20222:16 pmRNSResult of Meeting
23rd Nov 20222:50 pmRNSNotice of GM
22nd Sep 20222:30 pmRNSAcquisition of Berringa Gold Mine Complete
21st Sep 20226:21 pmRNSPlacing, Appointment of Joint Broker and TVR
5th Sep 20227:00 amRNSUpdate on drilling at Bilbale
19th Aug 202210:41 amRNSSecond Tranche of CLNs and Warrants
15th Aug 20224:12 pmRNSResult of Meeting
10th Aug 202211:10 amRNSDirector/PDMR Shareholding
8th Aug 202210:17 amRNSDirector/PDMR Shareholding
5th Aug 20227:00 amRNSAsset Review and Current Developments
1st Aug 20222:00 pmRNSAssessment of Ajax Mine Potential
28th Jul 20227:00 amRNSNotice of GM
25th Jul 20227:00 amRNSIssue of convertible notes and warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.