Andrada Mining acquisition elevates the miner to emerging mid-tier status. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksR.e.a.hldgs. Regulatory News (RE.)

Share Price Information for R.e.a.hldgs. (RE.)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 90.50
Bid: 90.00
Ask: 93.50
Change: -0.50 (-0.54%)
Spread: 3.50 (3.889%)
Open: 91.00
High: 91.00
Low: 90.50
Prev. Close: 92.25
RE. Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Interim Management Statement

1 May 2009 14:05

RNS Number : 6052R
R.E.A.Hldgs PLC
01 May 2009
 



Interim Management Statement

The crop of oil palm fresh fruit bunches ("FFB") harvested to end April 2009 amounted to 156,637 tonnes, against the budgeted crop of 158,429 tonnes and ahead of the crop for the corresponding period in 2008 of 150,719 tonnes.  The FFB crop for 2009 has been budgeted at 486,000 tonnes with a normal budgetary assumption of average rainfall (both as to quantum and distribution). This projected crop is a little below the level that would result if palms of an equivalent age achieved similar yields per hectare in 2009 to those of 2008. As the monthly phasing of crops varies from year to year, the directors attach no significance to the variation of 1,700 tonnes to date.

Rainfall to end April averaged 1,314 mm across the group's operations, compared with 1,088 mm during the same period in the previous yearand is wholly satisfactory for oil palm cultivation, particularly as the rainfall was well distributed. 

The crude palm oil ("CPO") extraction rate for the period was 23.2 per cent against a budget of 23.6 per cent. The rate for the corresponding period in 2008 was 23.09 per cent. Measures to improve harvesting standards are in the process of implementation and it is hoped that, going forward, these will contribute to an improvement in CPO extraction rates. Palm kernel extraction rates for the period were 4.8 per cent against a budget of 5.0 per cent and 4.3 per cent for the same period in 2008, continuing to reflect the improvements in nut cracking efficiency. 

 

After the lows seen in the price of CPO in the second half of 2008, the early months of 2009 have seen a recovery, with the CPO price, CIF Rotterdam, currently at $770 per tonne. The average price for the period 1 January to 30 April 2009 was $603. This compares with the average for 2008 of $939.

 

The group has recently completed the titling process in relation to a land allocation held by PT Putra Bongan Jaya ("PBJ"), an Indonesian subsidiary of the company acquired during 2008. This has resulted in full land title being granted to PBJ over 11,625 hectares. In light of the improving CPO price, the directors have recently taken the decision to resume extension planting and will initially concentrate development within part of such newly titled land areas.

Work continues in relation to the two small coal mining concessions, Liburdinding and Muser, in respect of which rights were acquired by the group during 2008 It is hoped that production from Liburdinding will start in the near future and that production from Muser will follow within a few months. Pending validation of theoretical plans by actual operating experience, the directors remain cautious as to the returns achievable from the group's new coal interests, particularly given that coal prices have fallen significantly over the past six months. Nevertheless, the group's internal projections continue to indicate that margins achievable even at current coal prices will justify the investment made which amounted at 31 December 2008 to $5.4 million.

At 31 December 2008, the group had outstanding borrowings in Indonesia totalling $12.9 million under a consortium loan facility, with additional undrawn facilities of $4 million. Drawings under the facility were repayable to the extent of $10.7 million in 2009 and the balance in 2010. Following recent agreement with the banks providing the facility, the terms of the facility have been reconstituted so as to provide the group with an $11.75 million term loan repayable over five years and a revolving working capital facility, renewable annually, of $4.75 million.

 

Apart from the reconstitution of bank borrowings in Indonesia, the group's borrowing and cash positions are substantially unchanged from what they were at 31 December 2008 as disclosed in the recently published 2008 annual report of the company.

For the moment, vegetable oil prices appear to have decoupled from the price of petroleum oil. The improving price trend is being driven by good demand for conventional uses of vegetable oil assisted by restocking in the major consuming countries which had reduced stocks in the immediate aftermath of the international financial crisis. Industry forecasters are predicting some slowdown in the rate of growth in CPO supply in 2009 in part reflecting increased replanting of older areas which are becoming uneconomic to harvest at current CPO prices and for which the Malaysian government is currently providing financial incentives. Although reports indicate that US soybean plantings for the current season will be at a higher level than for the 2008 season, the increase is projected to be slight. It is likely to be offset fully by the effects of drought on South American soybean crops which are expected to show a decline.

 

The supply demand balance going forward is moderately encouraging, particularly as slower growth in meat demand may adversely impact the economics of future soybean plantings given that revenues from soybean cultivation depend as much on sales of soya meal to the animal feed market as they do on sales of the oil component of the soybeans harvested. Within the CPO component of the vegetable oil complex, less readily available credit and reduced revenues are likely to lead to some slowdown in extension planting and, particularly as respects less efficient growers, reduction in fertiliser applications. This should result in some scaling back in the rate of future growth in CPO supply.

The new plantings that have been established in recent years mean that the group can anyway look forward to steadily increasing crops for several years to come. As inflationary pressures on costs subside, and, assuming that the recent firmer trend in CPO prices is maintained, margins may reasonably be expected to remain at satisfactory levels. The directors therefore retain their previously expressed confidence in the group's future. 

Enquiries:

R.E.A Holdings plc

Tel: 020 7436 7877

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
IMSSSDFDFSUSESI
Date   Source Headline
28th Sep 20169:55 amRNSHalf-year Report - Replacement
28th Sep 20167:00 amRNSHalf-year Report
25th Aug 20164:40 pmRNSSecond Price Monitoring Extn
25th Aug 20164:35 pmRNSPrice Monitoring Extension
16th Aug 20162:41 pmRNSFurther re third party investment
7th Jul 20162:45 pmEQSTransaction in REA sterling notes
6th Jun 20162:20 pmRNSResult of AGM
6th Jun 201610:22 amRNSAGM Statement
1st Jun 20161:45 pmRNSDirector/PDMR Shareholding
17th May 201611:41 amRNSStatement re investment in REA Kaltim, replacement
16th May 20167:00 amRNSStatement re third party investment in REA Kaltim
25th Apr 20167:00 amRNSAnnual Financial Report
16th Feb 20164:40 pmRNSSecond Price Monitoring Extn
16th Feb 20164:35 pmRNSPrice Monitoring Extension
26th Jan 201612:15 pmRNSDirector/PDMR Shareholding
25th Jan 20163:47 pmRNSDirector/PDMR Shareholding
22nd Dec 20158:15 amRNSFurther re issue of debt
18th Dec 201510:35 amRNSFurther re issue of debt
17th Dec 201512:05 pmRNSIssue of Debt
1st Dec 20154:40 pmRNSSecond Price Monitoring Extn
1st Dec 20154:35 pmRNSPrice Monitoring Extension
24th Nov 20154:40 pmRNSSecond Price Monitoring Extn
24th Nov 20154:35 pmRNSPrice Monitoring Extension
20th Oct 201512:46 pmRNSHolding(s) in Company
19th Oct 201510:48 amRNSDirector/PDMR Shareholding
15th Oct 20159:19 amRNSFurther re placing of ordinary shares
6th Oct 20154:30 pmRNSPlacing of ordinary shares
2nd Oct 20153:12 pmRNSPlacing of ordinary shares
10th Sep 20159:14 amRNSFurther re issue of sterling notes by REA Finance
4th Sep 201512:50 pmRNSFurther re issue of sterling notes by REA Finance
3rd Sep 20158:28 amRNSFurther re issue of sterling notes by REA Finance
2nd Sep 201512:59 pmRNSFurther re issue by REA Finance of sterling notes
27th Aug 20151:01 pmRNSResult of Meeting
26th Aug 20153:00 pmRNSFurther re issue by REA Finance of sterling notes
26th Aug 20152:22 pmRNSHalf Yearly Report - Replacement
26th Aug 20157:00 amRNSHalf Yearly Report
3rd Aug 20152:00 pmRNSIssue of 8.75% guaranteed sterling notes 2020
1st Jul 20159:18 amRNSPlacing of preference shares
25th Jun 201512:13 pmRNSplacing of preference shares
16th Jun 201510:53 amRNSNotification of change of directors' details
12th Jun 201511:24 amRNSAGM Statement - replacement
11th Jun 20152:03 pmRNSResult of EGM
11th Jun 20152:02 pmRNSResult of AGM
11th Jun 201510:15 amRNSAGM Statement
1st Jun 201510:51 amRNSDirector/PDMR Shareholding
29th May 20154:40 pmRNSSecond Price Monitoring Extn
29th May 20154:35 pmRNSPrice Monitoring Extension
7th May 20157:00 amRNSCirc re. long term incentive plan
24th Apr 201512:44 pmRNSFinal Results - Replacement
24th Apr 20157:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.