Trading Update

20 Jul 2009 07:00

RNS Number : 9131V
Peter Hambro Mining PLC
20 July 2009
 



20 July 2009

Trading Update

Peter Hambro Mining Plc ("PHM" or the "Group") issues this trading statement as an update and in advance of its interim results for the six months to 30 June 2009 which are expected to be issued on 27 August 2009.

Highlights

Production Update:

Total first half attributable gold production¹ of c.222,600oz, up 54on the same period last year. Historically, production during the first half of the year is lower than the second half due to more significant contribution from alluvial and heap-leach operations in the second half. Production in H2 2009 will be additionally boosted by the commissioning of the second processing line at Pioneer; 

Pioneer deposit's first half gold production of 118,100oz² (compared with 38,800oz² in H1 2008) reinforces the Group's confidence in delivering its full year production target of approximately 500,000oz;

Pioneer deposit's expansion works remain on track with the second mill expected to ramp up to full capacity in September 2009;

Pokrovskiy deposit's first half gold production was 91,700oz² (compared with 92,100oz in H1 2008), in line with the Group's forecasts;

PHM's joint ventures and alluvial operations contributed a further c.12,800oz (compared with c.13,700oz in H1 2008) to total production for the first half;

The Group sold 210,000oz of gold in H1 2009 (versus 118,800oz in H1 2008). Joint ventures do not form part of the Group's gold revenues and are therefore excluded from the gold revenue numbers.

Gold Price and Costs

Unit costs at the Pokrovskiy and Pioneer deposits for the first half of the year were in line with the Group's internal forecasts for the first six months of the year;

Average realised gold sales price of US$917/oz, up c.2% on the same period last year;

Exploration and Development

Malomir project on track for commissioning in the second half of 2010;

Kuranakh's Olekma iron ore processing plant on track for commissioning at the end of 2009;

Group exploration activities have produced promising results in the first half which are expected to be published in detail with the Group's interim results on the 27 August 2009.

¹Total attributable gold production, as stated throughout this document, is comprised of 100% of production from the Group's subsidiaries and the relevant share of production from joint ventures. The Company's direct and indirect interest in Pokrovskiy Rudnik (and any interest held by Pokrovskiy Rudnik) is 98.61%.

²In H1 2009, some of the gold from Pioneer deposit was processed through Pokrovskiy mill. Pioneer gold processed through Pokrovskiy mill is included in the Pioneer deposit figures. Figures for H1 2008 are restated accordingly. 

Commenting on the announcement, Peter Hambro, Executive Chairman, said:

"The increase in gold production during the first half of 54% compared to the same period a year ago is in itself very pleasing and gives us considerable confidence about our production growth plans at Pioneer and Malomir.

"We have remained resolute in our efforts to manage costs and guard our position as a low cost producer and I am pleased to report a solid performance in this respect. In our iron ore business, the Olekma processing plant is on track for commissioning at the end of 2009 and we are pleased to see some signs of recovery in the iron ore market." 

Table 1: Total Attributable Gold Production

Summary Production 

6 months to 30 June

2009

2008

Var. %

Mine

'000oz

'000oz

Pokrovskiy deposit³

91,700

92,100

(0.4%)

Pioneer deposit³

118,100

38,800

204.4%

JV and Alluvials

12,800

13,700

(6.6%)

Total

222,600

144,600

53.9%

³In H1 2009, some of the gold from Pioneer deposit was processed through Pokrovskiy mill. Pioneer gold processed through Pokrovskiy mill is included in the Pioneer deposit figures. Figures for H1 2008 are restated accordingly. 

Pokrovskiy deposit

All of the Pokrovskiy deposit's operations performed in line with expectations in the first half, yielding 91,700oz of gold (excluding Pioneer ore processed via the Pokrovskiy mill). This figure is in line with the corresponding period in 2008 and the Company's plan. In the first half of 2009, part of the mining fleet from the Pokrovskiy mine was relocated to Pioneer to meet increasing volumes there. 

Recovery rates at the RIP plant in the first half were slightly lower due to the significant proportion of primary material in the blend for the mill. Some of the decrease in ore (-24% versus H1 2008) stacked at heap leach pads was due to unfavourable weather conditions in May and June.

Table 2: Pokrovskiy Mining and Processing Operations

Pokrovskiy Mining Operations

6 months to 30 June

Units

2009

2008

Var. %

Mining

Total Material Moved

`000 m³

2, 641

2,899

(8.9%)

Ore mined 

t `000

972

1,059

(8.2%)

Average grade

g/t

2.8

3.2

(12.5%)

Gold content

oz `000

87.5

107.5

(18.6%)

Pokrovskiy Processing Operations

6 months to 30 June

Units

2009

2008

Var.%

Resin in Pulp Plant

Ore from pit

t `000

572

632

(9.5%)

Average grade

g/t

3.9

4.3

(9.3%)

Ore from stockpile

t `000

263

125

110.4%

Average grade

g/t

3.9

3.6

8.3%

Pioneer Ore 

t `000

35

81

(56.8%)

Grade

g/t

10.0

15.8

(36.7%)

Total milled

t `000

870

837

3.9%

Average grade

g/t

4.2

5.3

(20.8%)

Gold content

oz `000

116.2

142.4

(18.4%)

Recovery rate

%

83.9%

86.7%

(3.2%)

Gold recovered

oz `000

97.5

123.5

(21.1%)

Heap Leach

Ore stacked

t `000

311

410

(24.1%)

Average grade

g/t

0.8

0.8

-

Gold content

oz `000

8

11

(27.3%)

Recovery rate

%

44.0%

39.0%

12.8%

Gold recovered

oz `000

3.6

4.3

(16.3%)

Total

Gold recovered

oz `000

101.1

127.8

(20.9%)

including

Pokrovskiy

oz `000

91.7

92.1

(0.4%)

Pioneer

oz `000

9.4

35.7

(73.7%)

Pioneer deposit

During the first half, mining volumes were increased almost threefold compared with the same period in 2008 in order to provide uninterrupted feed for the current increased capacity rate of the Pioneer mill and to prepare for the mill's further expansion in the second half of 2009. Consequently, the mining fleet was also expanded with additional excavators, bulldozers and 90 tonne pit trucks.

The new plant performed consistently and in line with its internal design parameters.

The Andreevskaya deposit continued to produce high grade material throughout the first half of the year and thus the decision was taken to process all ore through the sorption plant without using the heap-leach operations in order to optimise gold recoveries.

Table 3: Pioneer Mining and Processing Operations

Pioneer Mining Operations 6 months to 30 June

Units

 2009   2008  Var. %

Total Material Moved

`000 m3

3,503

1,258

178.5%

Ore Mined

`000 t

399

174

129.3%

Grade

g/t

10.1

9.5

6.3%

Gold

`000 oz

129.0

52.8

144.3%

Pioneer Processing Operations4

6 months to 30 June

Units

2009

2008

Var.%

Ore from pit

t`000

60

-

-

Average grade

g/t

3.7

-

-

Ore from stockpile

`000

261

88

196.6%

Average grade

g/t

13.1

2.5

424.0%

Total milled

`000

321

88

264.8%

Average grade

g/t

11.3

2.5

352.0%

Gold content

oz `000

116.6

7.1

1,542.3%

Recovery rate

%

93.2%

43.7%

113.3%

Gold recovered

oz `000

108.7

3.1

3,406.5%

4Does not include material processed by the Pokrovskiy mill

Pioneer development 

During the first half, the second mill and associated equipment were installed and testing of mills and pumps has commenced.

Construction of all facilities required by the increased capacity of the mine (accommodation, canteen, office buildings and workshops) has also been completed.

Alluvial Production 

The Group`s alluvial mining operations, OAO ZDP Koboldo, ZAO Amur Dore and OOO Elga, produced c.5,400 oz of gold in the first half of the year, which was c.13% increase on the same period in 2008. Extensive exploration was carried out at seven new sites with potential to add to current gold reserves.

Joint Ventures 

Omchak Joint Venture

Omchak produced c.14,000oz of gold in the first half of 2008, in line with expectations. PHM`s attributable share of production was c.7,000oz . 

Omchak also carried out exploration at three projects in the Chita Region in accordance with approved plans and licence conditions. 

 

Amur Region Joint Ventures

In the first half of 2009, OOO Odolgo JV (formerly the Rudnoye JV) produced c.900oz with PHM having a 50% share.

Project update

Malomir

The rapid development of the Malomir project continued in the first half of 2009. The project's powerlines and all main internal roads were completed with construction of other support facilities also progressing according to plan. The sites for the plant and tailings dam havbeen prepared and construction of the main plant area has started

A new mining fleet has been delivered and in August 2009, advanced stripping will commence at the Quarzitovoye deposit. Further deliveries are due by October and with contracts already signedit is expected that all remaining equipment will be delivered to the site between November 2009 and March 2010.

Kuranakh

Construction has continued at the Olekma process plant site. The concrete foundation plinths are complete and the majority of the larger equipment has been installed including the ball mills, thickeners and driers. All of the remaining equipment necessary for completion of the plant has been delivered to the site and the heating plant, currently under construction, will be operational by winter. The plant is on schedule for commissioning in the second half.

Conference Call 

There will be a conference call today to discuss the announcement at 14:00 (London time). 

Details to access the conference call are as follows: 

The Dial-in number in the UK will be: 0800 953 0937

The Dial-in number is Russia will be: 8108 002 097 2044 

Elsewhere, the Dial-in number will be: +44 (0)1452 569 103 

The Conference ID in all cases will be20217449

Enquiries:

Peter Hambro Mining Plc

Alya Samokhvalova - Group Head of External Communications

Charles Gordon - Investor Relations Officer

Rachel Tuft - Investor Relations Officer

+44 (0) 20 7201 8900

Merlin

David Simonson 

Tom Randell 

+44 (0) 20 7653 6620

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
TSTSFIFWWSUSEDW
Date   Source Headline
18th Jul 20224:38 pmRNSAppointment of Administrators
14th Jul 20222:53 pmRNSUpdate on Application to Appoint Administrators
12th Jul 20227:42 amRNSNotice of Application for an Administration Order
12th Jul 20227:30 amRNSSuspension - Petropavlovsk Plc
11th Jul 202210:11 amRNSUpdate on Convertible Bonds
4th Jul 202210:49 amRNSHolding(s) in Company
1st Jul 20224:09 pmRNSResignation of Auditor
27th Jun 20224:30 pmRNSMoscow Exchange Listing Level Re-classification
7th Jun 202212:34 pmRNSChange of Accounting Reference Date & Corp. Update
23rd May 20224:40 pmRNSSecond Price Monitoring Extn
23rd May 20224:35 pmRNSPrice Monitoring Extension
20th May 20224:41 pmRNSSecond Price Monitoring Extn
20th May 20224:36 pmRNSPrice Monitoring Extension
18th May 20224:41 pmRNSSecond Price Monitoring Extn
18th May 20224:36 pmRNSPrice Monitoring Extension
17th May 20224:40 pmRNSSecond Price Monitoring Extn
17th May 20224:35 pmRNSPrice Monitoring Extension
16th May 202211:47 amRNSUpdate on Gazprombank Debt
13th May 20224:40 pmRNSSecond Price Monitoring Extn
13th May 20224:35 pmRNSPrice Monitoring Extension
12th May 20228:45 amRNSUpdate on Debt and Gold Sales
29th Apr 202211:08 amRNSUpdate on Guaranteed Notes and Convertible Bonds
27th Apr 20224:41 pmRNSSecond Price Monitoring Extn
27th Apr 20224:36 pmRNSPrice Monitoring Extension
25th Apr 20224:35 pmRNSPrice Monitoring Extension
22nd Apr 20224:40 pmRNSSecond Price Monitoring Extn
22nd Apr 20224:35 pmRNSPrice Monitoring Extension
22nd Apr 20227:00 amRNSQ1 2022 Production and Sales Report
20th Apr 20224:41 pmRNSSecond Price Monitoring Extn
20th Apr 20224:35 pmRNSPrice Monitoring Extension
20th Apr 20227:00 amRNSUpdate Regarding Gazprombank
19th Apr 20224:41 pmRNSSecond Price Monitoring Extn
19th Apr 20224:36 pmRNSPrice Monitoring Extension
14th Apr 20224:41 pmRNSSecond Price Monitoring Extn
14th Apr 20224:35 pmRNSPrice Monitoring Extension
14th Apr 20227:00 amRNSUpdate Regarding Gazprombank and Corporate Options
12th Apr 20224:40 pmRNSSecond Price Monitoring Extn
12th Apr 20224:35 pmRNSPrice Monitoring Extension
11th Apr 20227:00 amRNSBoard Update
8th Apr 20224:41 pmRNSSecond Price Monitoring Extn
8th Apr 20224:36 pmRNSPrice Monitoring Extension
7th Apr 202212:44 pmRNSHolding(s) in Company
6th Apr 202210:47 amRNSHolding(s) in Company Replacement
5th Apr 20226:20 pmRNSHolding(s) in Company
4th Apr 20224:40 pmRNSSecond Price Monitoring Extn
4th Apr 20224:36 pmRNSPrice Monitoring Extension
4th Apr 20223:52 pmRNSBoard Update
1st Apr 20227:00 amRNSNotice of Change to Director Details
30th Mar 20224:40 pmRNSSecond Price Monitoring Extn
30th Mar 20224:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.