Tribe Technology set to deliver healthy pipeline of orders from Tier-One miners. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPetrel Resources Regulatory News (PET)

Share Price Information for Petrel Resources (PET)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.10
Bid: 1.00
Ask: 1.20
Change: 0.025 (2.33%)
Spread: 0.20 (20.00%)
Open: 1.075
High: 1.10
Low: 1.075
Prev. Close: 1.075
PET Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Preliminary Results

17 Jun 2009 07:00

RNS Number : 0075U
Petrel Resources PLC
17 June 2009
 

17th June 2009

Petrel Resources PLC

Statement Accompanying the Preliminary Results

 for the Year Ended December 31 2008

Petrel has been active in Iraq for ten years. During that time, there have been a number of economic and political upheavals in the country, the area and in the wider world, but the events of the past eighteen months challenge even hardened optimists. Not only has Petrel faced ongoing civil strife in Iraq, continued legal uncertainty in the country, world markets where investors totally deserted small capital stocks, but we have not been paid for the work done on our large Subba and Luhais contract.

Since signing the US$197 million contract in 2005 and receiving US$20 million advance into a JV account from the Iraqi authorities, Petrel has completed approximately 50% of the project work. The work has been approved by the authorities. We have billed US$54 million against the project Letter of Credit, but the funds have not been disbursed. Protracted discussions have been ongoing for sixteen months. Agreements have been reached, the latest in March 2009, where payments are promised but to no avail.  With extreme reluctance, we put the Subba and Luhais project on care and maintenance in October 2008, and temporarily disbanded a world class technical team.

What is frustrating is that solutions have been negotiated and agreed by both sides but not implemented. Petrel has proposed to the authorities that we are happy not to take payment in cash. Instead, we could take over operatorship of the field, complete the development ourselves, and take payment in the form of oil. This proposal is well received in certain circles, but the lack of a Hydrocarbon Law makes it difficult to implement.

It is difficult to convey to shareholders to understand the current position in Iraq. The turmoil and chaos of the past six years has impacted on almost all administrative structures. The civil service, oil ministry and banking system have all seen significant changes in personnel. Political changes have further impacted on staff and policy.  The Iraqi environment of 2008 / 2009 differs starkly from that of 2004 / 2005, when we tendered for, and won, the contract.

Our strategy has been to complete the development of Subba and Luhais as a first step to building an Iraqi oil company. We continue to explore every avenue to reach a settlement, but Petrel, and our contractors must either be paid or the contract must be changed, so that Petrel can take oil as payment. The agreements of September 2008 and March 2009 were comprehensive, covering payment, revisions to work programmes and rapid remobilisation. We are working assiduously to have the agreement implemented.

The impasse on Subba and Luhais is affecting our other operations in Iraq. In the past year, we have completed our work on the Merjan field, confirmed an agreement on Dhufriya, and maintained our interest in Block 6 in the Western Desert. The Merjan study was joint ventured with Itochu of Japan, one of the largest Asian conglomerates. All existing data was reviewed and analysed, and development proposals prepared. We have indicated to the authorities that we would develop Merjan. We completed documentation on Dhufriya during 2008.  We have received all available seismic and geological information. It is with our team in Amman. Progress is on hold pending a solution to the payment problem.

We have been in the Western Desert of Iraq since 2000, when we were invited to study Block 6, a 10,000 square kilometre block, which had little prior exploration. We spent two years analysing all available data and conducting work on adjacent blocks, particularly in Jordan We reached agreement on terms in 2002, but the final documents were not signed. The Ministry of Oil is aware of our status in relation to Block 6. We are hopeful that we will be awarded title when the Hydrocarbon Law is passed. We have an agreed work programme, which involves seismic and wells. We have a seismic team ready to move on short notice, but prior to commencing work, we would need title and confidence that agreements will be honoured.

Apart from Iraq, we are active in Jordan on the East Safawi block. Intensive work done by Petrel in recent years has identified drillable targets. This is a "frontier" area in terms of oil discoveries, so we prefer to joint venture the risk. Extensive discussions with a multinational came to nothing, while negotiations are ongoing with experienced Middle East corporates.

Finance

The US$20 million received by the joint venture from the Iraqi authorities on the commencement of the Subba and Luhais contract funded operations for some time, but as outlined above, completing almost 50% of a US$197 million contract is costly. All of the sums due are covered by the Project Letter of Credit. The net amount immediately due to Petrel is US$8 million. We have stopped work and cut expenditure.  

In March of this year, a long standing institutional shareholder offered funding. Two other investors agreed to participate in the placing and US$3 million was raised at a price close to that prevailing in the market.

This money will keep Petrel going for the next eighteen months.

Future

We want to stay in Iraq. We want to be part of the oil industry development. We want to do this as a principal, not a contractor.

The opportunity in Iraqi oil has not changed. Oil costs US$2 a barrel to produce. There are over 70 known fields waiting to be developed. It makes absolutely no sense that oil production in Iraq is falling to less than 2.4 million barrels a day when it can rise to 10 million barrels a day. Iraq badly needs the revenue and the world needs the oil.

It is the potential which keeps Petrel in Iraq. The political, legal administrative and banking uncertainty will, and must, clarify. We believe that we can work through the labyrinth of Baghdad, get paid, and deliver a 200,000 barrel a day oil field to the people of Iraq.

John Teeling

Chairman

17th June 2009

Enquiries:

 
 
Petrel Resources plc
 
David Horgan, Managing Director
+ 353 (0)87 292 3500
John Teeling, Chairman
+ 353 (0)1 833 2833
 
 
Astaire Securities plc
 
Andrew Raca
+44 (0) 20 7448 4400
Jerry keen
 
Toby Gibbs
 
 
 
College Hill
 
Paddy Blewer
+44 (0)20 7457 2020
Nick Elwes
 

www.petrelresources.com

CONSOLIDATED INCOME STATEMENT

FOR THE YEAR ENDED 31 DECEMBER 2008

2008

2007

REVENUE

8,233,050

28,950,934

Cost of sales

(8,233,050)

(28,950,934)

GROSS PROFIT

-

-

Administrative expenses

(853,968)

(584,437)

OPERATING LOSS

(853,968)

(584,437)

Investment revenue

92,331

65,502

LOSS BEFORE TAXATION

(761,637)

(518,935)

Income tax expense

-

-

LOSS FOR THE YEAR: all attributable to equity holders of the parent 

(761,637)

(518,935)

Loss per share - basic and diluted

(1.05c)

(0.75c)

  CONSOLIDATED BALANCE SHEET AS AT 31 DECEMBER 2008

2008

2007

ASSETS:

NON-CURRENT ASSETS

Intangible assets

4,781,953

4,189,643

CURRENT ASSETS

Construction contracts

5,315,599

9,558,084

Trade and other receivables

38,703,604

29,334,443

Cash and cash equivalents

559,599

6,710,767

44,578,802

45,603,294

TOTAL ASSETS

49,360,755

49,792,937

CURRENT LIABILITIES

Trade and other payables

(37,318,226)

(36,850,125)

NET CURRENT ASSETS

7,260,576

8,753,169

TOTAL ASSETS LESS CURRENT LIABILITIES

12,042,529

12,942,812

EQUITY:

Called-up share capital

902,873

902,873

Capital conversion reserve fund

7,694

7,694

Share premium

15,693,098

15,693,098

Share based payment reserve

205,971

205,971

Translation reserve

(138,646)

-

Retained earnings - (deficit)

(4,628,461)

(3,866,824)

TOTAL EQUITY

12,042,529

12,942,812

  STATEMENT OF CHANGES IN EQUITY 

FOR THE YEAR ENDED 31 DECEMBER 2008

Group and Company

Share

Capital

Based

Retained

Share

Share

Conversion

Payment

Translation

Earning/

Capital

Premium

Reserve fund

Reserve

Reserve

(Deficit)

Total

At 1 January 2007

843,351

9,840,861

7,694

-

-

(3,347,889)

7,344,017

Share based payment

-

-

-

205,971

-

-

205,971

Shares issued 

59,522

6,040,704

-

-

-

-

6,100,226

Share issue expenses

-

(188,467)

-

-

-

-

(188,467)

Loss for the year

-

-

-

-

-

(518,935)

(518,935)

At 31 December 2007

902,873

15,693,098

7,694

205,971

-

(3,866,824)

12,942,812

Loss for the year

-

-

-

-

(138,646)

(761,637)

(900,283)

At 31 December 2008

902,873

15,693,098

7,694

205,971

(138,646)

(4,628,461)

12,042,529

Share premium reserve

The share premium reserve comprises of the excess of monies received in respect of share capital over the nominal value of shares issued.

Capital conversion reserve fund

The ordinary shares of the Company were renominalised from €0.0126774 each to €0.0125 each in 2001 and the amount by which the issued share capital of the Company was reduced was transferred to the capital conversion reserve fund.

Share based payment reserve

The share based payment reserve represents of share based payments granted which are not yet exercised and issued as shares.

Translation reserve

The translation reserve comprises accumulated translation adjustments in the current year and prior year.

Retained earnings (deficit)

Retained earnings (deficit) comprise accumulated profit and loss in the current year and prior year.

  CONSOLIDATED CASH FLOW STATEMENT 

FOR THE YEAR ENDED 31 DECEMBER 2008

2008

2007

CASH FLOW FROM OPERATING ACTIVITIES

Loss for the year

(761,637)

(518,935)

Investment revenue recognised in loss 

(92,331)

(65,502)

Exchange movements

273,150

-

OPERATING CASHFLOW BEFORE MOVEMENTS IN WORKING CAPITAL

(580,818)

(584,437)

Movements in working capital:

Decrease in construction contracts

4,242,485

838,057

(Decrease) / increase in trade and other payables

(4,058,191)

3,859,194

Increase in trade and other receivables

(9,369,161)

(29,290,548)

CASH USED IN OPERATIONS

(9,765,685)

(25,177,734)

Investment revenue

92,331

65,502

NET CASH USED IN OPERATING ACTIVITIES

(9,673,354)

(25,112,232)

INVESTING ACTIVITIES

Payments for intangible fixed assets

(730,956)

(515,708)

NET CASH USED IN INVESTING ACTIVITIES

(730,956)

(515,708)

FINANCING ACTIVITIES

Proceeds from issues of equity shares

-

5,984,780

Share issue costs

-

(130,743)

NET CASH GENERATED BY FINANCING ACTIVITIES

-

5,854,037

NET DECREASE IN CASH

(10,404,310)

(19,773,903)

Cash and cash equivalents at beginning of financial year

(10,323,028)

9,450,875

Effect of exchange rate changes on cash held in foreign currencies

(273,150)

-

Cash and cash equivalents at end of financial year

(21,000,488)

(10,323,028)

  Notes:

1.  Accounting Policies

There were no changes in accounting policies from those set out in the Group's Annual Report for the financial year ended 31 December 2007. The financial statements have been prepared in accordance with International Financial Reporting Standards (IFRS) and IFRSs as adopted by the European Union.

2.  Earnings per Share

2008

2007

Loss per share - Basic and Diluted

(1.05c)

(0.75c)

Basic loss per share

The earnings and weighted average number of ordinary shares used in the calculation of basic loss

per share are as follows:

2008

2007

Loss for the year attributable to equity holders of the parent

(761,637)

(518,935)

2008

2007

Number

Number

Weighted average number of ordinary shares for the purpose of basic earnings per share

72,229,796

69,024,259

Basic and diluted loss per share are the same as the effect of the outstanding share options is anti-

dilutive and is therefore excluded. 

  

3.  Intangible Assets - Group

2008

2007

Exploration and evaluation assets:

Cost:

Opening balance

4,189,643

3,410,242

Additions

730,956

779,401

Exchange translation adjustment

(138,646)

-

Closing balance

4,781,953

4,189,643

Carrying value:

Opening balance

4,189,643

3,410,242

Closing balance

4,781,953

4,189,643

Exploration and evaluation assets at 31 December 2008 represents exploration and related expenditure

in respect of projects in Iraq and Jordan

No amortisation is charged prior to the commencement of production. When production commences

within an area of interest previously capitalised in respect of exploration, evaluation and development,

these costs are amortised over the commercial reserves of the mining property on a unit of production

basis.

The group's activities are subject to a number of significant potential risks including:

Funding risks - include the ongoing funding of the Subba & Luhais development services contract and raising of capital to fund further exploration;

Recoverability of receivables - Trade receivables relating to amounts billed in respect of the Subba & Luhais development services contract are past due at the reporting date for which the group has not made any impairment provisions as the amounts are still considered recoverable;

Going concern;

Valuation of work in progress.

Price fluctuations;

Foreign exchange risks;

Uncertainties over development and operational costs;

Political and legal risks, including arrangements for licenses, profit sharing and taxation;

Foreign investment risks including increases in taxes, royalties and renegotiation of contracts;

Liquidity risks;

The realisation of these intangible assets is dependent on the successful development of economic

reserves, including the ability to raise finance to develop the projects. Should this prove unsuccessful

the value included in the balance sheet would be written off.

The directors are aware that by its nature there is an inherent uncertainty in such expenditure as to the

value of the asset. In addition, the current economic and political situation in Iraq is uncertain. Having

reviewed the exploration and evaluation expenditure at 31 December 2008, the directors are satisfied

that the value of the intangible asset is not impaired.

4 Construction Contracts

2008

2007

Work in progress:

Opening balance

9,558,084

10,396,141

Expenditure incurred in period

3,990,565

28,112,877

Work completed

(8,233,050)

(28,950,934)

5,315,599

9,558,084

The above relates to expenditure incurred and not billed in respect of the Subba and Luhais

  development services contract.

The Subba and Luhais development services contract represents a contract with the Iraqi Ministry of

Oil to assist design, supply materials and services for the development of this soil field. The total

amount of this contract is US$197 million.

The contract sets out details of when invoices should be raised and on that basis, in the opinion of the

directors the carrying value is recoverable under the terms of the contract. 

5 Trade and Other Receivables

2008

2007

Current assets:

Trade receivables

38,606,675

28,950,934

VAT refund due

27,628

26,221

Other receivables

69,301

357,288

38,703,604

29,334,443

Trade receivables relates to amounts billed in respect of the Subba and Luhais development services contract during 2008. As disclosed in Note 4, there is an amount of €5,315,599 (2007: €9,558,084) included as work in progress on this contract. The project is financed by a letter of credit, of which the amount outstanding at year end is €21,560,087 (2007: €17,033,795) to the Trade Bank of Iraq, together with a 10% payment on account of €13,932,451 (2007: €13,279,860)

In the opinion of the directors the amount above is considered to be fully recoverable. 

As further outlined in Note 3 the value of the assets due from group undertakings is dependent on the successful development of economic mineral reserves.

Included in the Group trade receivable balance are debtors with a carrying amount of €36,252,298 (2007: €23,258,278) which are past due at the reporting date for which the Group has not made any impairment provisions as there has not been a significant change in credit quality and the amounts are still considered recoverable. The average age of these receivables is 415 days (2007: 151).

Ageing of past due but not impaired.

2008

2007

90 - 120 days

4,761,128

4,923,967

>120 days

31,491,170

18,604,311

Total

36,252,298

23,528,278

In determining the recoverability of a trade receivable, the Group considers any change in the credit quality of the trade receivable from the date the credit was initially granted up to the reporting date.

Following negotiations, in March 2009, the Company received and has accepted a formal Ministry proposal on the Subba & Luhais EPC Contract payments schedule and a basis for proceeding with the work program with an extended schedule for completion. This includes payment of due sums already cleared to be paid to Petrel and suppliers. Accordingly, in the opinion of the directors the trade receivable of €38,606,675 is considered to be fully recoverable and is not impaired.

6 Cash and Cash Equivalents

2008

2007

Cash and cash equivalents

559,599

6,710,767

Bank overdraft

(21,560,087)

(17,033,795)

(21,000,488)

(10,323,028

7 General Information

The financial information set out above does not constitute the Company's financial statements for the year ended 31 December 2008. The financial information for 2007 is derived from the financial statements for 2007 which have been delivered to the Companies Registration Office. The auditors have reported on 2007 statements; their report was unqualified with an emphasis of matter in respect of considering the adequacy of the disclosures made in the financial statements concerning the valuation of intangible assets, construction contracts, trade receivables and amounts due by group undertakings. The financial statements for 2008 will be delivered to the Companies Registration Office following the Company's Annual General Meeting. 

A copy of the Company's Annual Report and Accounts for 2008 will be mailed to all shareholders shortly and will also be available for collection from the Company's registered office, 162 Clontarf RoadDublin 3, Ireland. The Annual Report may also be viewed at Petrel Resources PLC's website at www.petrelresourcesplc.com.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FR EAKKKFLENEFE
Date   Source Headline
24th Jun 202410:45 amRNSPosting of Annual Report and Notice of AGM
20th Jun 20247:00 amRNSPreliminary Results for the Year Ended 31 Dec 2023
5th Jan 202410:24 amRNSExercise of Warrants
3rd Jan 202410:37 amRNSExercise of Warrants
21st Dec 20233:18 pmRNSExercise of Warrants
18th Oct 20239:55 amRNSHolding(s) in Company
18th Oct 20239:54 amRNSHolding(s) in Company
28th Sep 20237:00 amRNSAppointment of Nominated and Financial Adviser
18th Sep 20237:00 amRNSUnaudited Interim Statement
27th Jul 20231:14 pmRNSResult of Annual General Meeting
20th Jun 20237:00 amRNSResults for the Year Ended 31st December 2022
29th Nov 202212:43 pmRNSHolding(s) in Company
18th Nov 20226:22 pmRNSHolding(s) in Company
4th Nov 202210:54 amRNSHolding(s) in Company
1st Nov 202212:13 pmRNSHolding(s) in Company
24th Oct 20227:00 amRNSPlacing to Raise £250,000
27th Sep 20227:00 amRNSInterim Statement
5th Aug 20221:00 pmRNSResult of Annual General Meeting
28th Jun 20227:00 amRNSAudited Results for the Year Ended 31st Dec 2021
5th May 20222:06 pmRNSSecond Price Monitoring Extn
5th May 20222:01 pmRNSPrice Monitoring Extension
5th May 202211:05 amRNSSecond Price Monitoring Extn
5th May 202211:00 amRNSPrice Monitoring Extension
14th Apr 202211:05 amRNSSecond Price Monitoring Extn
14th Apr 202211:00 amRNSPrice Monitoring Extension
14th Apr 20227:00 amRNSLifting of Court Injunction
22nd Sep 20217:00 amRNSInterim Statement
27th Jul 202111:39 amRNSResults of Annual General Meeting
4th Jun 20217:00 amRNSPreliminary Results for Year Ended 31st Dec 2020
12th Mar 20212:46 pmRNSUpdate on migration of uncertificated shares
23rd Feb 202111:21 amRNSResult of Extraordinary General Meeting
25th Jan 20217:00 amRNSNotice of Extraordinary General Meeting
21st Sep 20207:00 amRNSInterim Statement
18th Aug 20204:41 pmRNSSecond Price Monitoring Extn
18th Aug 20204:36 pmRNSPrice Monitoring Extension
24th Jul 202011:44 amRNSResults of Annual General Meeting
15th Jun 20207:00 amRNSPreliminary Results for the Year Ended 31/12/19
26th May 20207:00 amRNSPlacing to Raise £250,000 & Update on Operations
18th May 20207:00 amRNSUpdate on agreement with the Tamraz Group
3rd Apr 20207:00 amRNSUpdate on agreement with the Tamraz Group
10th Feb 20201:47 pmRNSUpdate
27th Jan 20204:41 pmRNSSecond Price Monitoring Extn
27th Jan 20204:36 pmRNSPrice Monitoring Extension
27th Jan 20202:05 pmRNSSecond Price Monitoring Extn
27th Jan 20202:00 pmRNSPrice Monitoring Extension
24th Jan 20204:47 pmRNSEnforcement of Share Lock-In
22nd Jan 20204:45 pmRNSNotification of Transactions
17th Jan 20205:08 pmRNSInterim update on enforcement of Share Lock-In
17th Jan 20204:41 pmRNSSecond Price Monitoring Extn
17th Jan 20204:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.