Andrada Mining acquisition elevates the miner to emerging mid-tier status. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksORM.L Regulatory News (ORM)

  • There is currently no data for ORM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further Encouraging Progress in Gold Joint Venture

18 Jun 2012 07:00

RNS Number : 5199F
Ormonde Mining PLC
18 June 2012
 

18 June 2012

 

Ormonde Mining plc

("Ormonde" or "the Company")

 

Further Encouraging Progress in Gold Joint Venture

 

The Board of Ormonde is pleased to report further drilling results on the "El Facho" gold structure at the Zamora Gold Project, which is in joint venture with Aurum Mining PLC ("Aurum"), with assays received from a further five holes (ORMP 16-20) from the current nine-hole programme.

 

Drilling to date has now established and defined a gold mineralised zone over a strike length of some 600 metres with the mineralisation remaining open both at depth and along strike.

 

 

Highlights

·; Drill hole ORMP-19 has returned a significant interval of 22 metres grading 1.09 grams per tonne ("g/t") gold (from 79m depth) and drill hole ORMP-20 has returned 9 metres grading 1.24g/t gold (from 56m depth).

·; Hole ORM-19 is located some 100 metres along strike (to the northeast) from previously reported hole ORMP-15, which returned an interval of 22 metres grading 1.94 grams per tonne ("g/t") gold (from 99m depth), within an overall interval of 49 metres grading 1.16g/t gold (from 96m depth).

·; Sixteen of the seventeen holes drilled at El Facho by Ormonde and/or the Joint Venture for which assay results are available have encountered gold mineralisation in excess of 1 g/t across multiple intersections.

·; Based upon these drilling results, modelling of the mineralisation has been carried out and this indicates the presence and continuity of a gold-bearing structure over a strike length of some 600 metres.

·; To assist in the design and planning of further drilling at El Facho, a preliminary resource estimation, carried out on the modelled mineralisation by external consultants to the Joint Venture partners, Aurum Exploration Services (the Irish-based mineral exploration consultant), suggests that the mineralised zone contains between 3.8 million tonnes and 4.8 million tonnes of mineralised material, with average grades from 0.9-1.0g/t gold using a 0.3g/t gold cut-off (total of 122,000-145,000 ounces). It is important to note that this resource has not been estimated in compliance with any internationally recognised standard and has been undertaken solely to guide further drilling programmes carried out to ascertain the full resource potential in the project area.

·; A three-hole drilling programme has also been completed on the Peralonso Permit; results will be reported upon receipt of assays for all three holes.

·; Aurum has now advanced funds of €500,000 required for expenditure on exploration activities to earn its majority interest in the permits which are the subject of the Joint Venture Agreement.

 

 

Kerr Anderson, Ormonde's Managing Director, said:

 

"At the outset of our current drilling programme last November, we were seeking to confirm the presence of an extended gold mineralisation zone. We are pleased that today's results from El Facho continue to confirm the gold-bearing structure, with drilling having now extended the mineralised zone to a length of at least 600 metres. The level of progress achieved to date has enabled us to model the main mineralised zone for the first time and will help guide future drilling on the project with the objective of expanding the gold-bearing zones further."

 

Detail

 

In March 2011, Ormonde entered into a joint venture with Aurum whereby Aurum can earn a 60% interest in two permits in the Zamora Province and a 54% interest in a further two permits in the Salamanca Province (with the total permit area being 106 square kilometres) by spending €500,000 on exploration activities over an 18 month period.

 

Drilling to date has been focused on the "El Facho" gold structure in Zamora, where the Joint Venture has drilled eleven holes (ORMP-10, 11 and 13-21) for a total of 2,697 metres of drilling, bringing total drilling at El Facho to eighteen holes drilled by Ormonde / or the Joint Venture (Click here to view plan view of drill holes) for a total of 3,658 metres. Gold mineralisation is hosted in steeply-dipping structures characterised by quartz veining, silicification and alteration in granites. The Joint Venture drilling was designed to test for extensions to the known gold intersections and in particular to ascertain whether broader mineralised intervals can be delineated.

 

Significant results from ORMP-16 to 20 are reported below:

 

Hole

Length (m)

Dip/Azimuth

From (m)

Thickness (m)

Estimated True Thickness (m)

Gold (g/t)

ORMP-16

180.0

-50o/333o

144

10

7

0.5

and

226

7

5

0.9

ORMP-17

211.5

-50o/324o

148

12

9

0.7

ORMP-18

201.0

-50o/318o

21

14

10

0.4

ORMP-19

223.0

-50o/327o

79

22

16

1.1

ORMP-20

201.1

-60o/331o

55

15

11

0.8

incl

56

9

6

1.2

 

Previous drilling by Ormonde and/or the joint venture on the Facho structure includes:

 

Hole

From (m)

Thickness (m)

Gold (g/t)

ORMP 1

51

23

1.1

ORMP 3

131

3

3.6

ORMP 4

40

6

3.7

ORMP 5

56

9

1.5

ORMP 6

104

7

1.1

ORMP 7

38

7

1.2

ORMP-10

89

12

3.4

within

75

30

1.6

within

25

80

0.8

ORMP-11

102

10

2.2

and

275

5

1.9

ORMP-13

154

10

0.6

and

172

3

1.4

ORMP-14

143

1

11.4

ORMP-15

109

11

3.6

within

99

25

1.8

within

96

49

1.2

 

 

Based upon all drilling results on the El Facho structure to-date, wireframes have been constructed around the main mineralised zones reflecting gold content and alteration, and these wireframes show continuity of the main gold-bearing structure over a strike length of some 600 metres (Click here to view wireframe gold structure).  Preliminary resource modelling has been carried out within these wireframes by external consultants to the Joint Venture partners, Aurum Exploration Services (the Irish-based mineral exploration consultant). This has been done to assist in the design and planning of further drilling to ascertain the resource potential in the project area. This modelling indicates that the mineralised zone comprises some 3.8-4.8 million tonnes with overall grades from 0.9-1.0g/t gold using a 0.3g/t gold cut-off (total of 122,000-145,000 ounces). It is important to note that this resource has not been estimated in compliance with any internationally recognised standard and has been undertaken to guide further drilling programmes. The range in estimates is due to the use of differing modelling assumptions in the estimation process.

 

In addition to the drilling at El Facho, three holes (for a total of 277.1m) have now been completed on the Peralonso Permit in the Salamanca Province to test the shallow depth extent of gold mineralisation located in previous trenching. Gold mineralisation at surface at Peralonso is hosted within Fe-oxide-bearing breccias within altered granites, with previous trenching of an extensive soil geochemical anomaly (400 x 400m) returning a best interval of 5 metres grading 5.4g/t gold. Results will be reported upon receipt of assays for all three holes.

 

Notes:

 

Sampling, Assaying and Quality Control Measures

 

All drill core has been routinely logged by an experienced geologist. Relevant core intervals were split in half by diamond saw, with half being sent for assay and the other half being retained in the core boxes for reference. Sampling is mainly carried out over one metre intervals.

 

Sample preparation and analyses were performed at ALS Chemex (Spain). Assays are reported using the fire assay (FA) method with an atomic absorption (AA) finish.  Reference samples (blanks, duplicates and certified standards) are routinely included in each sample batch as quality control measures. .

 

 

Kerr Anderson PhD EurGeolPGeo, Managing Director of Ormonde Mining plc, and a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies, June 2009, of the London Stock Exchange, has reviewed and approved the technical information contained in this announcement.

 

As noted above, resource information contained in this announcement relating to the El Facho structure has not been estimated in compliance with any internationally recognised standard and has been undertaken solely to guide further drilling programmes in order to ascertain the full resource potential in the project area. Accordingly this announcement does not constitute a resource update within the meaning of the AIM Guidance Note for Mining, Oil and Gas Companies.

 

A glossary explaining technical terms contained in this announcement can be found at www.ormondemining.com/en/investors/technical_glossary.

 

For more information please visit www.ormondemining.com or follow Ormonde on Twitter https://twitter.com/ormondemining or Linkedin http://www.linkedin.com/company/ormonde-mining-plc

 

 

Enquiries to:

 

Ormonde Mining plc

Kerr Anderson, Managing Director Tel: +353 (0)1 8253570

 

Bankside Consultants

Simon Rothschild Tel: +44 (0)20 7367 8888 Mob: +44 (0)7703 167065

 

 

Murray Consultants

Ed Micheau Tel: +353 (0)1 4980300 Mob: +353 (0)86 803 7155

 

Davy (Nomad / ESM Adviser)

Eugenée Mulhern / Roland French Tel: +353 (0)1 6796363

 

Fairfax I.S. PLC (Joint Broker)

Ewan Leggat / Katy Birkin Tel: +44 (0)207 598 5368

 

 

ENDS

 

 

About Ormonde

Ormonde Mining Plc is admitted to trading on the AIM market in London & the ESM market in Dublin. Ormonde is a mineral development and exploration company focused on Spain (Ticker: ORM).

 

Ormonde's key activities include:

 

The Barruecopardo Tungsten Project - Ormonde is developing a low cost mining operation at Barruecopardo to become a major, secure European supply of tungsten.

 

The La Zarza Copper Project- a large "massive sulphide" deposit; exploration for an enlargement to the current copper resources is being funded through a joint venture Antofagasta Minerals.

 

Gold Explorationin several highly prospective areas of western Spain.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGUBCQUPPGAA
Date   Source Headline
4th Jun 20202:50 pmRNSHolding(s) in Company
15th May 20207:00 amRNSBusiness Update, Salary Reductions, Options Grant
8th Apr 20207:00 amRNSFinal Results
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:37 pmRNSPrice Monitoring Extension
30th Mar 202011:00 amRNSPrice Monitoring Extension
13th Mar 202011:15 amRNSHolding(s) in Company
9th Mar 20207:55 amRNSDirector/PDMR Shareholding
17th Feb 20207:00 amRNSCompletion of Disposal
13th Feb 20201:53 pmRNSEGM Results
10th Feb 20207:00 amRNSDirectorate Change
27th Jan 20204:39 pmRNSPublishing of Circular and Proposed Board Changes
10th Jan 20203:58 pmRNSHolding(s) in Company
8th Jan 20204:41 pmRNSSecond Price Monitoring Extn
8th Jan 20204:36 pmRNSPrice Monitoring Extension
8th Jan 20202:05 pmRNSSecond Price Monitoring Extn
8th Jan 20202:00 pmRNSPrice Monitoring Extension
8th Jan 202012:58 pmRNSProposed Disposal
27th Dec 201911:05 amRNSSecond Price Monitoring Extn
27th Dec 201911:00 amRNSPrice Monitoring Extension
25th Nov 20197:00 amRNSOperational Update
24th Oct 20193:15 pmRNSHolding(s) in Company
24th Oct 20193:14 pmRNSHolding(s) in Company
17th Oct 20197:00 amRNSSaloro Financing Update
30th Sep 20197:00 amRNSInterim Results
23rd Sep 20193:31 pmRNSResult of AGM
20th Sep 20197:00 amRNSBarruecopardo Tungsten Mine Update
27th Jun 20192:49 pmRNSAnnual Financial Report
19th Jun 20197:00 amRNSFinal Results
23rd May 20197:00 amRNSBarruecopardo Update
26th Feb 20197:00 amRNSBarruecopardo Project Update
14th Dec 20187:00 amRNSBarruecopardo Tungsten Project Update
11th Oct 20183:14 pmRNSChange of Registered Office
27th Sep 20183:53 pmRNSResult of AGM
27th Sep 20187:00 amRNSInterim Results for six months ended 30 June 2018
12th Sep 20187:00 amRNSBarruecopardo Tungsten Project Update
27th Jun 201812:19 pmRNSAnnual Financial Report
19th Jun 20187:00 amRNSFinal Results
17th Jan 201811:58 amRNSGranting of Options
28th Nov 20177:00 amRNSBarruecopardo Tungsten Mine Construction Update
6th Oct 20174:07 pmRNSHolding(s) in Company
28th Sep 20177:00 amRNSInterim Results 2017
18th Sep 20172:09 pmRNSResult of AGM
5th Sep 20177:00 amRNSBarruecopardo Tungsten Project
28th Jun 20177:00 amRNSPublication of Annual Report
20th Jun 20177:00 amRNSFinal Results for the year ended 31 December 2016
2nd Jun 20177:00 amRNSBarruecopardo Project Update
22nd Dec 201612:36 pmRNSBarruecopardo Tungsten Project
6th Oct 20166:04 pmRNSGranting of Options
30th Sep 20167:00 amRNSInterim Results 2016

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.