Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksOEX.L Regulatory News (OEX)

  • There is currently no data for OEX

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

OPERATIONS REPORT - INDIA AND OMAN

29 Apr 2008 07:00

29 April 2008

SUBJECT: OPERATIONS REPORT - INDIA AND OMAN

INDIA

Oilex advises that the Cambay-23Z well has been completed as a potential gasproduction well. The drilling rig was released on 26 April and commenced themove to the next location, Cambay-19Z. Testing operations on Cambay-23Z will beconducted by a specialist wireline and testing unit as soon as the drilling rigis off the location.During the past week, the rig completed the wireline logging program andvelocity survey and 7" liner was run and cemented from a depth of 2,080 metres.Production tubing was run and a 12 metre interval, part of the possiblegas-bearing zone of interest in the upper and middle part of the EP IV, wasperforated. No flow has yet been established from the EP IV and once initialtesting has been concluded, a fracture stimulation is planned with theobjective to increase the gas flow potential and well productivity.For each of the 6 wells in the Cambay program, the general plan is todemobilise the rig from each location as soon as drilling and loggingoperations are completed. Further tests on each well will be conducted with awireline unit that has the capability to undertake the full range of activitiesthat may be required to test the wells conclusively at a much lesser day rate.The other advantage in mobilising the rig to the next location in the sequenceat the earliest time is to minimise the risk of the rig and equipment beingstranded by adverse effects of the pending monsoon.

Participants in the Cambay Production Sharing Contract are:

Joint Venture Party Participating Interest Oilex Ltd (Operator) 30%

Oilex NL Holdings (India) Limited (100% owned by Oilex 15%

Ltd)

Gujarat State Petroleum Corporation 55%

OMAN

Alyanbou-1, the third and final well of the first phase 3 well explorationprogram in Block 56, Oman, spudded on 27 April and is expected to reach totaldepth of about 1,630 m in late May. In contrast to the Sarha and Ghadaq oildiscoveries which were drilled on structures similar to those of the main SouthOman Salt Basin, Alyanbou-1 is a wildcat exploration well testing a simplestructural play with an estimated unrisked resource potential of 10-375mmstboip (135 mmstboip mean) in the northeastern part of the block.Within Block 56 no wells have been drilled this far east of the main salt basinor in the Tertiary Basin. Alyanbou-1 is located to test a large inversionfeature located on the western margin of the large Tertiary basin which isseparated from the older Paleozoic basin to the west by the interpreted saltwall lineament.

Figure 1. Well locations on top Natih Fm depth map. (see report posted on Oilex website)

Participants in the Block 56 Exploration & Production Sharing Agreement are:Joint Venture Party Participating Interest Oilex Oman Limited (Operator) 25% Videocon Industries Limited 25% GAIL (India) Limited 25%

Hindustan Petroleum Corporation Limited 12.5% Bharat Petroleum Corporation Limited 12.5%

Yours sincerely,B. H. McCarthyManaging Director

For further information, please contact:

Ray Barnes Technical Director, Oilex Ltd Tel. +61 8 9226 5577 (Western Australia)

Archie Berens Director, Pelham Public Relations Tel. +44 20 7743 6679 (United Kingdom)

RFC Corporate Finance Ltd acts as Oilex's Nominated Adviser - contact Stuart Laing +618 9480 2506.

The information in this report has been compiled by the Managing Director ofOilex Ltd, Bruce McCarthy B.Sc. Hons PhD (Geology) who has over 29 yearsexperience in petroleum geology and Ray Barnes, B.Sc. Hons the TechnicalDirector of Oilex Ltd who has over 35 years experience in petroleum geology andis a member of the AAPG and EAEG. Estimates of oil-in-place are reported inaccordance with the standard definitions set out by the Society of PetroleumEngineers, further information on which is available at www.spe.org.

vendor
Date   Source Headline
27th Jul 202210:54 amRNSCambay C-77H Re-frac Operations Update No5
26th Jul 20227:54 amRNSChange of Company Name
25th Jul 20227:44 amRNSCambay C-77H Re-frac Operations Update No4
25th Jul 20227:40 amRNSJune 2022 Quarterly Report
25th Jul 20227:30 amRNSSuspension - Oilex Ltd
25th Jul 20227:21 amRNSSuspension of trading on AIM
22nd Jul 20229:21 amRNSPlacement - Issue of Securities and TVR
21st Jul 20227:00 amRNSCambay C-77H Re-frac Operations Update No3
19th Jul 20227:55 amRNSChange of Company Name & AIM Suspension
18th Jul 20229:34 amRNSCambay C-77H Re-frac Operations Update No2
13th Jul 202211:18 amRNSResults of General Meeting
30th Jun 20221:57 pmRNSDirector Dealing
23rd Jun 20227:00 amRNSCambay C-77H Re-frac Operations Update
13th Jun 20227:00 amRNSName Change, Director Option Award, Notice of GM
9th Jun 202212:25 pmRNSHolding(s) in Company
8th Jun 20227:00 amRNSHolding(s) in Company
6th Jun 20227:00 amRNSCambay Production and Operations Update
1st Jun 20229:00 amRNSHolding(s) in Company
1st Jun 20227:00 amRNSPlacement - Issue of Securities
27th May 20227:00 amRNSCambay Reserves Re-classification
17th May 20227:00 amRNSChange of Company Secretary
4th May 20227:00 amRNSCambay Production Update and Fund Raise
28th Apr 20227:00 amRNSMarch Quarterly Report 2022
14th Apr 20222:06 pmRNSSecond Price Monitoring Extn
14th Apr 20222:00 pmRNSPrice Monitoring Extension
14th Apr 20227:00 amRNSCambay India Re-frac Update & Revised Gas Contract
8th Apr 20229:38 amRNSCambay India Production and C-77H Re-frac Update
7th Apr 20224:41 pmRNSSecond Price Monitoring Extn
7th Apr 20224:35 pmRNSPrice Monitoring Extension
4th Apr 202211:16 amRNSCambay India Production Further Update
4th Apr 20227:00 amRNSCambay India Production Update
25th Mar 202210:16 amRNSChange in Substantial Holding
22nd Mar 20227:00 amRNSIssue of Securities and Cleansing Notice
16th Mar 20227:00 amRNSCambay India Update
11th Mar 202211:00 amRNSHalf Year Report 2021
28th Feb 20227:00 amRNSMedway Hub CCS Project
18th Feb 20227:00 amRNSResults of General Meeting
15th Feb 20224:41 pmRNSSecond Price Monitoring Extn
15th Feb 20224:36 pmRNSPrice Monitoring Extension
15th Feb 20222:01 pmRNSPrice Monitoring Extension
11th Feb 20224:42 pmRNSSecond Price Monitoring Extn
11th Feb 20224:36 pmRNSPrice Monitoring Extension
10th Feb 202211:06 amRNSSecond Price Monitoring Extn
10th Feb 202211:01 amRNSPrice Monitoring Extension
7th Feb 20224:19 pmRNSGrant of Environmental Clearance for Cambay Field
7th Feb 20227:00 amRNSCambay PSC Participating Interest Assignment
4th Feb 20224:41 pmRNSSecond Price Monitoring Extn
4th Feb 20224:37 pmRNSPrice Monitoring Extension
4th Feb 20222:06 pmRNSSecond Price Monitoring Extn
4th Feb 20222:01 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.