Cambay Workover Update

8 Dec 2015 07:00

RNS Number : 2844I
Oilex Ltd
08 December 2015
 



ASX Announcement

 

8 December 2015

 

ASX: OEX

AIM: OEX

 

Cambay Workover Update

 

l Cambay-77H gas is being sold at a peak rate exceeding 110 boepd, via Cambay-73 facilities

l Cambay-19z oil production ~12 bopd plus associated gas

l Cambay-20 Hydraulic Lift Pump (HLP) installed

Oilex Ltd is pleased to provide the following workover update:

Production from the Cambay Field is now ~75 boepd and may increase in line with demand from the local low pressure gas market now that Cambay-77H is online.

Cambay-77H

The Cambay-77H workover is complete and, based upon cumulative production since restarting the well, is now averaging ~51boepd via the flowline connection to Cambay-73 facilities. The well is producing through a 1/64 inch choke and the tubing head pressure is ~2,600 psig and steady. Production from Cambay-77H is meeting the demand from the local low pressure gas market, including a peak demand rate of ~0.500MMscfd for ~1 hour period that occurs twice daily. At peak demand, gas is being sold from Cambay-77H at greater than 110boepd using the average condensate to gas ratio (CGR) of ~55bbls/MMscf since restarting the well.

The well performance is being closely monitored subsequent to recommencing production and a fuller understanding of its deliverability potential will be gained from ongoing production. Although demand for local gas fluctuates according to peak demand times as noted above, it is anticipated that overall gas demand from the local low pressure gas market may gradually increase now that Cambay-77H is online. An increase in the market overall will be dependent on successful marketing efforts in India. This marketing is underway.

As anticipated, the newly installed production tubing has improved the flow performance of the well compared to flowback and testing operations during 2014. The workover rig installed the production tubing without having to kill the well, this is believed to be the first time this activity has been successfully accomplished in a horizontal multi-stage frac'd well in India.

Cambay-19z

Cambay-19z is now producing oil at ~12 bopd plus associated gas from the Eocene (EP IV) formation, and is within expectations. The associated gas is used at site to power the pump. The operation to reposition the downhole pump has been successful. The well has also been fitted with a chemical injection system to improve flow performance. Cambay-19z is located approximately 1.4 km to the west of Cambay-77H.

Cambay-20

Installation of the HLP unit and downhole pump is complete and pumping out of the brine has commenced. Gas has been detected at surface in a similar manner to Cambay-19z. Cambay-20 has previously been an intermittent oil and gas producer without using a downhole pump. It is located approximately 200 metres from Cambay-77H and associated gas not used to power the pump is transmitted to the Cambay-73 gas treatment facilities.

   

Other potential workover candidates

The future possible workover list has ~ 6 new candidates for consideration. As previously announced, subject to ongoing discussions with our Joint Venture Partner regarding cashcall payments, a decision will be made in relation to further workovers after the Cambay-60 workover is complete.

 

Managing Director of Oilex, Ron Miller, said;

"The Cambay workover campaign continues to deliver positive results with oil production from Cambay-19z meeting expectations and the deliverability of Cambay-77H gas production enhanced with successful installation of the production tubing. Overall, in relation to the Cambay Field, Oilex is now focussing on its objective of achieving a production rate target of ~150 boepd."

 

For and on behalf of Oilex Ltd

Ron Miller

Managing Director

 

For further information, please contact:

 

Investor Enquiries

Oilex Ltd

Ron Miller

Managing Director

Email: oilex@oilex.com.au

Tel: +61 8 9485 3200

Australia

Nominated Adviser

Strand Hanson Limited

Nominated Adviser

Rory Murphy/Ritchie Balmer

Email: oilex@strandhanson.co.uk

Tel: +44 20 7409 3494

UK

 

Media Enquires

Vigo Communications

Public Relations UK

Patrick d'Ancona/Chris McMahon

Email: patrick.dancona@vigocomms.com

chris.mcmahon@vigocomms.com

Tel: +44 20 7016 9570

UK

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUWUARVUAURRA
Date   Source Headline
27th Jul 202210:54 amRNSCambay C-77H Re-frac Operations Update No5
26th Jul 20227:54 amRNSChange of Company Name
25th Jul 20227:44 amRNSCambay C-77H Re-frac Operations Update No4
25th Jul 20227:40 amRNSJune 2022 Quarterly Report
25th Jul 20227:30 amRNSSuspension - Oilex Ltd
25th Jul 20227:21 amRNSSuspension of trading on AIM
22nd Jul 20229:21 amRNSPlacement - Issue of Securities and TVR
21st Jul 20227:00 amRNSCambay C-77H Re-frac Operations Update No3
19th Jul 20227:55 amRNSChange of Company Name & AIM Suspension
18th Jul 20229:34 amRNSCambay C-77H Re-frac Operations Update No2
13th Jul 202211:18 amRNSResults of General Meeting
30th Jun 20221:57 pmRNSDirector Dealing
23rd Jun 20227:00 amRNSCambay C-77H Re-frac Operations Update
13th Jun 20227:00 amRNSName Change, Director Option Award, Notice of GM
9th Jun 202212:25 pmRNSHolding(s) in Company
8th Jun 20227:00 amRNSHolding(s) in Company
6th Jun 20227:00 amRNSCambay Production and Operations Update
1st Jun 20229:00 amRNSHolding(s) in Company
1st Jun 20227:00 amRNSPlacement - Issue of Securities
27th May 20227:00 amRNSCambay Reserves Re-classification
17th May 20227:00 amRNSChange of Company Secretary
4th May 20227:00 amRNSCambay Production Update and Fund Raise
28th Apr 20227:00 amRNSMarch Quarterly Report 2022
14th Apr 20222:06 pmRNSSecond Price Monitoring Extn
14th Apr 20222:00 pmRNSPrice Monitoring Extension
14th Apr 20227:00 amRNSCambay India Re-frac Update & Revised Gas Contract
8th Apr 20229:38 amRNSCambay India Production and C-77H Re-frac Update
7th Apr 20224:41 pmRNSSecond Price Monitoring Extn
7th Apr 20224:35 pmRNSPrice Monitoring Extension
4th Apr 202211:16 amRNSCambay India Production Further Update
4th Apr 20227:00 amRNSCambay India Production Update
25th Mar 202210:16 amRNSChange in Substantial Holding
22nd Mar 20227:00 amRNSIssue of Securities and Cleansing Notice
16th Mar 20227:00 amRNSCambay India Update
11th Mar 202211:00 amRNSHalf Year Report 2021
28th Feb 20227:00 amRNSMedway Hub CCS Project
18th Feb 20227:00 amRNSResults of General Meeting
15th Feb 20224:41 pmRNSSecond Price Monitoring Extn
15th Feb 20224:36 pmRNSPrice Monitoring Extension
15th Feb 20222:01 pmRNSPrice Monitoring Extension
11th Feb 20224:42 pmRNSSecond Price Monitoring Extn
11th Feb 20224:36 pmRNSPrice Monitoring Extension
10th Feb 202211:06 amRNSSecond Price Monitoring Extn
10th Feb 202211:01 amRNSPrice Monitoring Extension
7th Feb 20224:19 pmRNSGrant of Environmental Clearance for Cambay Field
7th Feb 20227:00 amRNSCambay PSC Participating Interest Assignment
4th Feb 20224:41 pmRNSSecond Price Monitoring Extn
4th Feb 20224:37 pmRNSPrice Monitoring Extension
4th Feb 20222:06 pmRNSSecond Price Monitoring Extn
4th Feb 20222:01 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.