Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEmpyrean Regulatory News (EME)

Share Price Information for Empyrean (EME)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.29
Bid: 0.29
Ask: 0.32
Change: -0.0075 (-2.52%)
Spread: 0.03 (10.345%)
Open: 0.31
High: 0.31
Low: 0.28
Prev. Close: 0.2975
EME Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

18 Apr 2006 09:05

Empyrean Energy PLC18 April 2006 Empyrean Energy PLC ("Empyrean" or the "Company"; Ticker: (EME)) Drilling Update Eagle North-1 well in California, USA • Oil shows encountered over a horizontal measured interval of 98 feet whilst drilling the curved part of the well. • Casing of the curved part of the well now complete. • Preparing to drill final horizontal stage before setting production liner. AIM quoted Empyrean Energy PLC today announces the following update on the EagleNorth-1 well, California, USA: Victoria Petroleum NL as operator for the Eagle North-1 horizontal well advisesthat at 1800 hours Central Pacific Time 17 April 2006, the current operation atthe Eagle North-1 horizontal well was preparing to drill ahead after setting 41/2 inch casing at 4,281metres (14,045 feet) measured depth after havingencountered good oil shows from the interval 4,255 metres (13,960 feet )measured depth (4,152 metres TVD KB) to 4,285 metres (14,058 feet). The wellbore is currently at an angle of 87 degrees from the vertical. As per previous announcement, the forward plan is to drill a 3 3/4 inchhorizontal well bore for a distance of approximately 320 metres to within 30metres of the Mary Bellocchi-1 oil well. This horizontal stage will be drilledwith a normal pressured water based KCL-Clarizan mud minimising formationinvasion and maximising the evaluation potential of the oil bearing sand. Thiswill result in a planned measured depth of 4,600 metres (15,090 feet). This horizontal well bore will then be completed for production with a 2 7/8inch slotted production liner. Production testing will follow. A further update will be made as information becomes available. Executive Director - Tom Kelly commented "We are pleased with the recentprogress of completion operations and look forward to the next stage ofhorizontal drilling before setting production liner to test." The information contained in this announcement has been reviewed by theTechnical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who hasover 40 years experience as a petroleum geologist. For further information Laurence Read/ Angus Prentice Conduit PRTel: +44 (0) 207 429 6603 Mob: +44 (0) 7974 982 512 Toby HowellHB Corporate Tel: +44(0) 207 510 8600 Empyrean Energy plcTel : +44(0) 207 932 2442 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
14th Jan 20154:47 pmRNSForm 8.3 - Empyrean Energy PLC
14th Jan 20159:26 amRNSForm 8.5 (EPT/NON-RI)
13th Jan 20159:56 amRNSForm 8.5 (EPT/NON-RI)
12th Jan 20155:19 pmRNSForm 8.3 - Empyrean Energy PLC
12th Jan 20159:28 amRNSForm 8.5 (EPT/NON-RI)
9th Jan 20159:49 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20153:49 pmRNSForm 8.3 - Empyrean Energy PLC
8th Jan 20159:25 amRNSForm 8.5 (EPT/NON-RI)
8th Jan 20157:00 amRNSRepays USD 2m of Macquarie Facility
7th Jan 20159:13 amRNSForm 8.5 (EPT/NON-RI)
6th Jan 201510:10 amRNSForm 8.5 (EPT/NON-RI)
30th Dec 20147:40 amRNSInterim Results
23rd Dec 201412:33 pmRNSForm 8.3 - Empyrean Energy PLC
23rd Dec 201410:07 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 201411:25 amRNSForm 8.5 (EPT/NON-RI)
19th Dec 20147:00 amBUSForm 8.3 - Empyrean Energy plc
18th Dec 201410:32 amRNSForm 8.3 - Empyrean Energy PLC
17th Dec 201410:43 amRNSForm 8.5 (EPT/NON-RI)
15th Dec 201410:34 amRNSForm 8.5 (EPT/NON-RI)
12th Dec 20149:13 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 201410:00 amRNSForm 8.5 (EPT/NON-RI)
11th Dec 20148:30 amRNSQ3 2014 Production from Sugarloaf AMI, Texas
10th Dec 201411:29 amRNSForm 8.5 (EPT/NON-RI)
9th Dec 201410:42 amRNSForm 8.3 - Empyrean Energy PLC
5th Dec 201412:16 pmRNSForm 8.3 - Empyrean Energy PLC
4th Dec 20148:35 amRNSForm 8.5 (EPT/NON-RI)
3rd Dec 20141:24 pmRNSForm 8.3 - Empyrean Energy PLC
3rd Dec 201412:22 pmRNSForm 8.3 - Empyrean Energy PLC
1st Dec 20149:01 amRNSForm 8.5 (EPT/NON-RI)
28th Nov 201410:37 amRNSForm 8.5 (EPT/NON-RI)
25th Nov 20141:01 pmRNSForm 8.3 - Empyrean Energy PLC
24th Nov 201410:59 amBUSForm 8.3 - Empyrean Energy plc
21st Nov 201410:21 amRNSForm 8.5 (EPT/NON-RI)
20th Nov 20149:17 amRNSForm 8.5 (EPT/NON-RI)
19th Nov 20149:11 amRNSForm 8.5 (EPT/NON-RI)
19th Nov 20147:00 amRNSQ3 2014 Production and Operational Update
18th Nov 20149:23 amRNSForm 8.5 (EPT/NON-RI)
6th Nov 201412:56 pmRNSForm 8.3 - Empyrean Energy PLC
6th Nov 20149:28 amRNSForm 8.5 (EPT/NON-RI)
5th Nov 201410:04 amRNSForm 8.5 (EPT/NON-RI)
4th Nov 20149:48 amRNSForm 8.5 (EPT/NON-RI)
3rd Nov 20149:15 amRNSForm 8.5 (EPT/NON-RI)
29th Oct 20143:14 pmRNSForm 8.3 - Empyrean Energy PLC
29th Oct 20143:01 pmRNSForm 8.3 - Empyrean Energy PLC
29th Oct 20142:57 pmRNSForm 8.3 - Empyrean Energy PLC
29th Oct 201410:27 amRNSForm 8.5 (EPT/NON-RI)
28th Oct 201410:19 amRNSForm 8.5 (EPT/NON-RI)
27th Oct 201411:24 amRNSForm 8.3 - Empyrean Energy PLC
21st Oct 20141:45 pmRNSExercise of Options
20th Oct 20149:01 amRNSForm 8.5 (EPT/NON-RI)

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.