Andrada Mining acquisition elevates the miner to emerging mid-tier status. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECR Minerals Regulatory News (ECR)

Share Price Information for ECR Minerals (ECR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.245
Bid: 0.24
Ask: 0.25
Change: -0.01 (-3.92%)
Spread: 0.01 (4.167%)
Open: 0.255
High: 0.255
Low: 0.235
Prev. Close: 0.255
ECR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Report

16 May 2006 07:00

Mercator Gold PLC16 May 2006 MERCATOR GOLD PLC ("Mercator Gold" or the "Company") Interim Report on Drilling at Bluebird and Confirmation of Drilling Results at Paddy's Flat • Promising initial results from the Bluebird programme are now available and include 8 m @ 11.1 g/t Au, 4 m @ 10.1 g/t Au, 17 m @ 3.1 g/t Au, and 10 m @ 3.0 g/t Au • Confirmation of the previously announced drilling results at Prohibition Zone, Paddy's Flat, including intersects 7m @ 6.5g/t, 69m @ 3.6g/t, 46m @ 1.9g/t and 28m @ 6.9 g/t all in hole 06PRRD001 representing a modest increase of the previously reported grade. Bluebird The resource at Bluebird is currently defined as 5,280,000 tonnes @ 1.9 g/t Aufor 326,000 ounces. The bulk of these ounces are contained within five highgrade domains, 1,698,000 tonnes @ 4.5 g/t Au for 244,000 ounces, surrounded by alower grade alteration halo. Additional structures being targeted include Edin Hope (to the south west ofBluebird), Polar Star (to the south east of Bluebird) and Bluebird North. Mercator Gold plc is pleased to announce that RC and diamond drilling has beenunderway since 23 February with the aim of increasing the Bluebird resource andthat the programme is on target to achieve its objective. First drillingreturns at Bluebird include the following highlights: • 1 m @ 15.7 g/t Au, 8 m @ 11.1 g/t Au, 5 m @ 1.6 g/t Au, 2 m @ 3.9 g/t Au, 4 m @ 2 g/t Au, 3 m @ 4.3 g/t Au, 4 m @ 10.1 g/t Au, 17 m @ 3.1 g/t Au, and 3 m @ 6.90 g/t Au on the Bluebird lodes. • 10 m @ 3 g/t Au from the only Bluebird North drill hole result, received thus far. • 0.6 m @ 21 g/t Au, and 4m @ 2 g/t Au on the Polar Star zone. • 7 m @ 1.6 g/t Au, 2 m @ 2.4 g/t Au, and 7 m @ 1.1 g/t Au on the Edin Hope zone. Of particular significance was the 8 m @ 11.1 g/t Au intersection. This holewas targeting mineralisation immediately north of the Bluebird pit, in the gapbetween the Bluebird and Bluebird North pit, and supports the extension of thehigh grade Bluebird domain north of the currently defined resource. Only one result has been received from the Bluebird North resource drilling,with RC drilling results still outstanding, and diamond drilling still inprogress. The Bluebird lodes have generally been the highest grade structures, withinclose proximity (1.5 kilometres) of the treatment plant. To take advantage ofthis strategic location, future mining is expected to be centred on the Bluebirddeposit. Sterilisation drilling over the mill, and office area, returned no significantresult, and indicate that mill, and powerhouse refurbishment can be carried out,as planned. A more detailed table of drilling results for Bluebird is available on theCompany's website. Paddy's Flat Prohibition Zone As announced on 20 April 2006, hole 06PRRD001 is collared in the haul road, 70metres below surface. The revised results show a modest increase in gradereflecting the use of the more reliable fire assay technique. In addition, theseresults are complete, whilst the earlier results had a small number ofun-reported intervals. In hole 06PRRD001 geologically defined intersects occur as listed below: From -> to metres Description Grade * thickness g.m/ Vertical Depth metres t 27 to 33 7m @ 6.54g/t 45.8 93 93 to 94 1m @ 2.1g/t 2.1 143 171 to 240 (1) 69m @ 3.58g/t 247.0 232 252 to 254 2m @ 2.41g/t 4.8 271 266 to 312 (2) 46m @ 1.96g/t 90.2 299 317 to 321 (3) 4m @ 4.25g/t 17.0 323 323 to 324 1m @ 1.16g/t 1.2 327 402 to 430 (4) 28m @ 6.96g/t 195.0 401 464 to 465 1m @ 1.07g/t 1.1 439 Notes on table The drill assay table in this press release is based on geological intervalsthat are illustrated in a diagram which will be available on the Company'swebsite. The "from -> to" value is the distance down the hole. Thevertical depth is the distance from surface at which the intersect is firstrecognised (note that the hole was drilled within the pit). The assay method forall samples is Genalysis 50g fire assay (FA50/AAS). Note (1) the interval 69m @3.58g/t includes 21m of internal dilution at an average grade of 0.54 g/t, (2)the interval 46m @ 1.96g/t includes 18m of internal dilution at an average gradeof 0.55 g/t, (3) the interval 4m @ 4.25g/t includes a high grade zone of 2m @7.48 g/t from 319m, and (4) the interval 28m @ 6.96g/t includes a high gradezone of 13m @ 10.26 g/t from 403m. Hole 06PRRD001 was drilled parallel to the host rock type but across at ahigh-angle to fault structures. The results confirm the Company's analysis basedon SpaDiS(TM) technology, that mineralisation shows significant down dipcontinuity, dipping east towards the Vivian Consols resource. This geologicalinterpretation contrasts with previous modeling of the Prohibition resource (2.3Mt @ 3.6 g/t for 270,000 ounces) that assumed narrow (mostly less than 10m wide)west dipping fault zones. The results presented here raise the possibility ofconsiderably more mineralisation available for potential mining withoutsignificant drops in grade. The Vivian Consols resource (0.9 Mt @ 7.4 g/t for230,000 ounces) is about 300m to the east with components dipping west towardsProhibition. The Company is in the final stages of designing a drill programmedue to commence in month's time. This programme of about 10,000m of RC and5,000m of diamond core drilling targets the expansion of the existingProhibition resource and will test the relationship of the Prohibition andVivian Consols mineralisation with a view to future mining economies.Specifically the drilling will: • test the along strike reproducibility of the above Prohibition result; • determine the width of the host ferruginous chert and mineralisation at depth; • provide detailed data on fault and host rock geology to enable the develop a three-dimensional model of mineralisation; • provide data for revised evaluations on the resources at Prohibition and Vivian Consols, and assess the depths to which these deposits may be mined in an enlarged open cut operation. The Managing Director, Mr Patrick Harford, said: "The Company is very pleasedwith the results received to date. The Bluebird drilling is on target toconfirm and upgrade the resource there, whilst the Prohibition Zone at Paddy'sFlat promises to be a much bigger mineralised system than previously thought.Significant drilling programmes at Surprise, Meekatharra North and Paddy's Flatare due to commence soon and work continues on target definition at a number ofother prospects." Consent for release Julian Vearncombe BSc (Hons), PhD, FGS, RPGeo, FAIG is a director of the Companyand consents to the inclusion of the information in the form and context inwhich it appears here. Julian Vearncombe is a Competent Person for the reportingof these results as defined by the JORC Code 2004 Edition. For further information please contact: Mercator Gold plcPatrick Harford Managing Director Tel: +44 (0) 20 7929 1010 Email: info@mercatorgold.comLink to website: www.mercatorgold.com Parkgreen CommunicationsJustine Howarth / Ana Ribeiro Tel: +44 (0) 20 7493 3713 Note to editors SpaDiS(TM) is a software programme developed by Vearncombe & Associates Pty Ltdthat uses fractal technologies, including autocorrelation, to generatehigh-grade targets from historic exploration data. Mercator Gold has acontractual arrangement for the on-going use of SpaDiS(TM). This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
1st May 20158:00 amBUSUPDATE ON EXPLORATION
28th Apr 20157:00 amBUSPARTIAL CONVERSION OF LOAN
17th Apr 201510:37 amBUSUPDATE ON EXPLORATION
7th Apr 20157:00 amBUSECR at UK Investor Show 2015 and Master Investor 2015
31st Mar 201511:35 amBUSResult of AGM
25th Mar 20158:33 amBUSPartial Conversion of Loan
12th Mar 20157:00 amBUSUpdate on Exploration at Itogon Gold Project
5th Mar 201512:20 pmBUSAnnual Financial Report
5th Mar 20157:29 amBUSUpdate on Due Diligence
27th Feb 20157:00 amBUSUpdate on Activities
20th Feb 20157:00 amBUSUpdate on Due Diligence
9th Feb 20157:26 amBUSUS$750,000 Convertible Loan
22nd Jan 20158:24 amBUSDrilling Commences at Itogon Gold Project, Philippines
15th Jan 20157:00 amBUSHolding(s) in Company
31st Dec 201412:14 pmBUSGrant of Options
23rd Dec 20148:28 amBUSUpdate on Q4 2014 Exploration at Itogon Gold Project
22nd Dec 201410:39 amBUSDrilling to Commence at Itogon Gold Project in January 2015
19th Dec 201412:22 pmBUSHolding(s) in Company
18th Dec 201412:45 pmBUSECR Secures Conditional Right to Acquire Option over Phang Nga Lithium-Tantalum-Tin Project in Thailand
16th Dec 20143:33 pmBUSPartial Conversion of Loan
12th Dec 20141:07 pmBUSHolding(s) in Company
11th Dec 20147:00 amBUSChange of Adviser
5th Dec 20142:14 pmBUSHolding(s) in Company
5th Dec 20141:44 pmBUSPartial Conversion of Loan
4th Dec 201410:41 amBUSRELEASE OF MERCATOR GOLD AUSTRALIA FROM ADMINISTRATION
24th Nov 201412:36 pmBUSACQUISITION OF TIGER SHARES INCREASES ECR’s EXPOSURE TO ITOGON GOLD PROJECT, PHILIPPINES
13th Nov 201411:26 amBUSUPDATE ON SLM GOLD PROJECT, ARGENTINA
10th Nov 20143:00 pmBUSECR AT MININGMAVEN INVESTOR EVENING
10th Nov 20147:00 amBUSUpdate on Mercator Gold Australia
14th Oct 20147:00 amBUSUPDATE ON MERCATOR GOLD AUSTRALIA
13th Oct 20144:30 pmBUSPRESENTATION TO PHILIPPINE MINING LUNCHEON
30th Sep 20144:20 pmBUSTotal Voting Rights
26th Sep 201411:07 amBUSPositive Results from Phase 4 Channel Sampling at Itogon Gold Project, Philippines
15th Sep 20145:01 pmBUSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
15th Sep 20141:50 pmBUSPartial Conversion of Loan
15th Sep 201411:55 amBUSUpdate on Mercator Gold Australia
8th Sep 20142:16 pmBUSDirector/PDMR Shareholding
8th Sep 201411:04 amBUSDirector/PDMR Shareholding
5th Sep 20143:25 pmBUSDirector/PDMR Shareholding
3rd Sep 20149:20 amBUSConvertible Loan Facility
2nd Sep 20143:11 pmBUSUPDATE ON SLM GOLD PROJECT, ARGENTINA
1st Sep 20147:00 amBUSFurther Positive Results from Channel Sampling at Itogon Gold Project, Philippines
27th Aug 20147:00 amBUSUpdate on Mercator Gold Australia
21st Jul 201411:03 amBUSUpdate on SLM Gold Project, Argentina
17th Jul 20142:50 pmBUSECR Minerals Plc: Further Positive Results from Channel Sampling at Itogon Gold Project, Philippines
15th Jul 20147:20 amBUSUpdate on Mercator Gold Australia
4th Jul 201412:18 pmBUSUPDATE ON MERCATOR GOLD AUSTRALIA
27th Jun 20143:16 pmBUSHalf-yearly Report
26th Jun 20143:08 pmBUSUPDATE ON ITOGON GOLD PROJECT
24th Jun 20141:15 pmBUSUpdate on SLM Gold Project, Argentina

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.