Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksDatang Intl H Regulatory News (DAT)

Share Price Information for Datang Intl H (DAT)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 16.19956
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 16.19956
DAT Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Connected Transaction

14 Sep 2015 15:30

DATANG INTERNATIONAL POWER GENERATION COMPANY LD - Connected Transaction

DATANG INTERNATIONAL POWER GENERATION COMPANY LD - Connected Transaction

PR Newswire

London, September 14

Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.

DATANG INTERNATIONAL POWER GENERATION CO., LTD.(a sino-foreign joint stock limited company incorporated in the People's Republic of China)(Stock Code: 00991)

ANNOUNCEMENT

CONNECTED TRANSACTION

TECHNOLOGICAL TRANSFORMATION PROJECTS CONTRACT

On 14 September 2015, Zhang Jia Kou Power Plant, as owned by the Company, entered into the Technological Transformation Projects Contract with Datang Environment Company -- Datang Engineering Company consortium, and the contract amount was RMB411.66 million.

LISTING RULES IMPLICATIONS

As at the date of this announcement, CDC is the controlling Shareholder of the Company, which together with its subsidiaries hold 34.77% of the issued share capital of the Company. Pursuant to Chapter 14A of the Listing Rules, since Datang Environment Company -- Datang Engineering Company consortium is a connected person of the Company, the transaction under the Technological Transformation Projects Contract constitutes a connected transaction of the Company.

Since one or more of the applicable percentage ratios (as defined in Rule 14.07 of the Listing Rules) in respect of the transaction amount under the Technological Transformation Projects Contract, when aggregated with the Previous Transactions, is above 0.1% but less than 5%, the Technological Transformation Projects Contract and the transaction thereunder is subject to the reporting and announcement requirements under Chapter 14A of the Listing Rules but does not require the approval by the independent Shareholders of the Company.

TECHNOLOGICAL TRANSFORMATION PROJECTS CONTRACT

Date of the Contract:

14 September 2015

Parties of the Contract:

(1) Owner: Zhang Jia Kou Power Plant

(2) Contractor: Datang Environment Company -- Datang Engineering Company consortium

Major Terms of the Contract:

(1) Subject matter: Zhang Jia Kou Power Plant agreed to appoint Datang Environment Company – Datang Engineering Company consortium to undertake the modification project for the ultra-low emission for environmental facilities units No.1-8 of Zhang Jia Kou Power Plant.

(2) Aggregate contract price and breakdown:

Aggregate total contract price(RMB'000)Breakdown of the contract price
Totalfacilities procurement fees(RMB'000)Construction fees(RMB'000)Installation fees(RMB'000)Design and debugging fees(RMB'000)Other aggregate costs(RMB'000)
411,660296,93233,290.93551,421.06524,2165,800

(3) Settlement and payment:

Prepayment for the contract:Within one month from the effective date of the contract, the contractor shall provide an irrevocable performance bond guarantee in an amount equivalent to 10% of the total contract price and a financial receipt equivalent to 30% of the total contract price, and the owner shall pay 30% of the total contract price to the contractor as prepayment within one month upon verification.
Payment of facilities procurement fees:i) After the contractor has submitted documents including the checklist of relevant major facilities and materials, the owner shall pay 30% of the facilities procurement fees to the contractor within one month upon verification;ii) After the contractor has delivered the last batch of facilities and materials, the owner shall pay 30% of the facilities procurement fees to the contractor within one month upon verification;iii) The remaining 10% of the facilities procurement fees shall be reserved as the quality assurance fees for the facilities. Upon the provision of the final acceptance certificate by the contractor, the owner shall pay 10% of the facilities procurement fees to the contractor within one month upon verification;
Payment of construction and installation fees:i) Upon completion of 50% of the project, the owner shall pay 30% of the construction and installation fees;ii) Upon completion of 100% of the project, the owner shall pay 30% of the construction and installation fees;iii) The remaining 10% of construction and installation fees shall be reserved as the quality assurance fees. Upon the provision of the final acceptance certificate by the contractor, the owner shall pay 10% of the construction and installation fees within one year upon verification;
Payment of consideration for technical services and other fees:Within one year upon completion, acceptance and commissioning of the project, the owner shall pay the balance of the fees apart from the reserved 10% quality assurance fee.

(4) Effective date of contract: Effective when duly signed by the legal representative or the proxy (with written authorisation by the legal representative) of the parties with their respective company seals affixed thereto.

REASONS FOR AND BENEFITS OF ENTERING INTO THE TECHNOLOGICAL TRANSFORMATION PROJECTS CONTRACT

According to the annual technological transformation plan of the Company, the Company invited public tender for the Technological Transformation Projects for the power generating units of its power plants and subsidiaries. After carrying out relevant evaluation procedures and considering various factors, including the technical experiences, professional qualification, business reputation, project management skills, consideration amount and other relevant factors of all the tenderers, Datang Environment Company -- Datang Engineering Company consortium was selected as the tender winner for the Technological Transformation Projects for the power generating units of Zhang Jia Kou Power Plant.

Datang Environment Company -- Datang Engineering Company consortium possesses sufficient qualification with rich expertise in carrying out the Technological Transformation Projects. The Company considers that such companies will be capable to ensure the Technological Transformation Projects to be carried out smoothly.

The Company and Zhang Jia Kou Power Plant agreed to appoint Datang Environment Company -- Datang Engineering Company consortium to carry out the Technological Transformation Projects, mainly for the purposes of ensuring the on-schedule completion of Technical Transformation Projects of Zhang Jia Kou Power Plant, to fully ride on its professional advantage, as well as to control cost to a certain extent through large scale purchasing of facilities.

The Directors (including independent non-executive Directors) are of the view that the transaction under the Technological Transformation Projects Contract was duly completed by way of public tender; the relevant terms are fair and reasonable and conducted on normal commercial terms and are in the interests of the Company and its shareholders as a whole.

BOARD'S APPROVAL

Pursuant to the resolution of the sixteenth meeting of the eighth session of the Board in respect of the consideration and approval of the "Resolution on the Tendering for the Technological Transformation Projects of Datang International and its Subsidiaries" (details of which were set out in the overseas regulatory announcement of the Company dated 19 December 2014), the Company and its subsidiaries have invited public tender for their Technological Transformation Projects in 2015.

None of the Directors has material interest in the transaction under the Technological Transformation Projects Contract. Connected Directors, including Chen Jinhang, Hu Shengmu and Liang Yongpan, have abstained from voting for this resolution at the relevant Board meeting pursuant to the Listing Rules of the Shanghai Stock Exchange.

INFORMATION OF THE PARTIES

1. The Company is principally engaged in the construction and operation of power plants, the sale of electricity and thermal power, the repair and maintenance of power equipment and power related technical services, with its main service areas being in the PRC.

2. CDC was established on 9 March 2003 with registered capital of RMB18,009 million and is principally engaged in the development, investment, construction, operation and management of power energy, organisation of power (thermal) production and sales; manufacturing, repair and maintenance of power equipment; power technology development and consultation; power engineering, contracting and consultation of environmental power engineering; development of new energy as well as development and production of power related coal resources.

3. Datang Environment Company is a subsidiary of CDC. With registered capital of RMB2,400 million, the company principally engaged in environmental project development and environmental facilities investment, operation and management etc.

4. Datang Engineering Company, a subsidiary of Datang Environment Company, was established on 10 May 2004 with a registered capital of RMB180 million. Its scope of business mainly includes: general contracting for design and construction of thermal power and wind power generation system; general contracting for design and construction of environmental projects such as flue gas desulfurisation and denitration in various areas, including energy, metallurgy and chemistry; franchise of environmental desulfurisation facilities; general contracting for design and construction of material conveying projects, such as coal conveying, ash conveying and bulk cargo terminals; general contracting for design and construction of projects such as dry slag removing system and anti-corrosion of chimneys; manufacture of heavy machinery and dry slag removing equipment.

5. Zhang Jia Kou Power Plant is a power plant owned by the Company and has an installed capacity of 2,400MW.

LISTING RULES IMPLICATIONS

As at the date of this announcement, CDC is the controlling Shareholder of the Company, which together with its subsidiaries hold 34.77% of the issued share capital of the Company. Pursuant to Chapter 14A of the Listing Rules, since Datang Environment Company–Datang Engineering Company consortium is a connected person of the Company, the transaction under the Technological Transformation Projects Contract constitutes a connected transaction of the Company.

Since one or more of the applicable percentage ratios (as defined in Rule 14.07 of the Listing Rules) in respect of the transaction amount under the Technological Transformation Projects Contract, when aggregated with the Previous Transactions, is above 0.1% but less than 5%, the Technological Transformation Projects Contract and the transaction thereunder is subject to the reporting and announcement requirements under Chapter 14A of the Listing Rules but do not require the approval by the independent Shareholders of the Company.

DEFINITIONS

In this announcement, unless the context otherwise requires, the following expressions have the following meanings:

"Board"the board of directors
"CDC"China Datang Corporation, a State-owned enterprise established under the laws of the PRC and is a controlling shareholder of the Company. CDC and its subsidiaries own approximately 34.77% of the issued share capital of the Company as at the date of this announcement
"Company"Datang International Power Generation Co., Ltd., a sino-foreign joint stock limited company incorporated in the PRC on 13 December 1994, whose H Shares are listed on the Stock Exchange and the London Stock Exchange and whose A Shares are listed on the Shanghai Stock Exchange
"connected person"has the meaning ascribed to it under the Listing Rules
"connected transaction"has the meaning ascribed to it under the Listing Rules
"Datang Engineering Company"China Datang Technologies and Engineering Co., Ltd., a subsidiary of Datang Environment Industry Group Co., Ltd., a wholly-owned subsidiary of CDC, details of which are set out in the section headed "Information of the Parties"
"Datang Environment Company"Datang Environment Industry Group Co., Ltd., a subsidiary of CDC, details of which are set out in the section headed "Information of the Parties"
"Datang Environment Company -- Datang Engineering Company consortium"a consortium formed by Datang Environment Company and Datang Engineering Company
"Director(s)"the director(s) of the Company
"Zhang Jia Kou Power Plant"Zhang Jia Kou Power Plant of Datang International Power Generation Co., Ltd., a power plant owned by the Company, details of which are set out in the section headed "Information of the Parties"
"Listing Rules"the Rules Governing the Listing of Securities on the Stock Exchange
"PRC"the People's Republic of China
"Previous Transactions"technological transformation projects contracts entered into between certain power plants or subsidiaries of the Company and Datang Environment Company/Datang Technology Industry Company and their subsidiaries, details of which are set out in the definition of "Previous Transactions" in the "Connected Transactions" announcement of the Company dated 25 August 2015
"RMB"Renminbi, the lawful currency of the PRC
"Stock Exchange"The Stock Exchange of Hong Kong Limited
"Technological Transformation Projects Contract ""Contract on Modification Project for Ultra-low Emission for Environmental Facilities Units No.1-8 of Zhang Jia Kou Power Plant" entered into between Zhang Jia Kou Power Plant and Datang Environment Company – Datang Engineering Company consortium on 14 September 2015 with a contract amount of RMB411.66 million
"Technological Transformation Projects"refer to the technological transformation projects that transform obsolete technologies into advanced technologies and replace outdated technology and equipment with advanced ones by upholding the principle of technological advancement, thereby achieving the goal to expand production capacities through organic growth, diversify product portfolio and enhance product quality, at the same time saving energy, reducing raw materials consumption, enhancing labour productivity and increasing economic benefits
"%"percentage

By Order of the BoardZhou Gang Secretary to the Board

Beijing, the PRC, 14 September 2015

As at the date of this announcement, the Directors of the Company are:Chen Jinhang, Hu Shengmu, Wu Jing, Liang Yongpan, Zhou Gang,Cao Xin, Cai Shuwen, Liu Haixia, Guan Tiangang, Yang Wenchun,Jiang Guohua*, Feng Genfu*, Luo Zhongwei*, Liu Huangsong*, Jiang Fuxiu*

* Independent non-executive Directors

Date   Source Headline
5th Feb 20183:33 pmPRNAppointment of IFA
5th Feb 20183:32 pmPRNFurther Delay in Despatch of Circular
5th Feb 20189:46 amPRNMonthly Return
30th Jan 20184:23 pmPRNNotice of Attendance for the 2018 First EGM
30th Jan 20184:22 pmPRNProxy Form for use at the 2018 First EGM
30th Jan 20184:21 pmPRNNotice of 2018 First EGM
30th Jan 20184:20 pmPRNInside Information
30th Jan 20184:19 pmPRNContinuing Connected Transactions
30th Jan 20184:18 pmPRNORA - Power Generation for the Year of 2017
18th Jan 201811:43 amPRNContinuing Connected Transactions: Franchising Contracts
18th Jan 201811:41 amPRNConnected Transaction -- EPC Project Contracts
2nd Jan 201810:38 amPRNMonthly Return
29th Dec 201710:24 amPRNDelay in Despatch of Circular
22nd Dec 201712:58 pmPRNEPC Project Contracts
22nd Dec 201712:55 pmPRNTechnological Transformation Projects Contracts
22nd Dec 201712:54 pmPRNConnected Transaction - Capital Increase Agreement
21st Dec 20171:16 pmPRNChange in Accounting Estimates
21st Dec 20171:14 pmPRNORA - Resolutions of Board of Directors
19th Dec 20171:18 pmPRNConnected Transactions
14th Dec 20174:16 pmPRNReply to Enquiry Letter and Clarification
8th Dec 20173:44 pmPRNReceipt of Enquiry Letter from Shanghai Stock Exchange
8th Dec 20173:30 pmPRNResolution Passed at the 2017 Third EGM
7th Dec 201711:02 amPRNORA - Resolutions of the Board of Directors
7th Dec 201711:01 amPRNMajor and Connected Transaction
1st Dec 20179:25 amPRNMonthly Return
3rd Nov 20171:31 pmPRNMonthly Returns
2nd Nov 20172:24 pmPRNAnnouncement - DT - Establishment of Joint Venture
31st Oct 201712:01 pmPRNThe Progress of the A-Share Issuance
30th Oct 20173:03 pmPRNConnected Transactions
30th Oct 20173:02 pmPRNReply to Questions in Notification Letter
30th Oct 20173:00 pmPRNContinuing Connected Transactions
30th Oct 20172:56 pmPRNResolutions of the Board of Directors
30th Oct 20172:39 pmPRNThird Quarterly Report of 2017
24th Oct 20171:58 pmPRNNotice of Attendance for the 2017 Third EGM
24th Oct 20171:54 pmPRNProxy Form for Use at the 2017 Third EGM
24th Oct 20171:51 pmPRNNotice of 2017 Third EGM
18th Oct 201711:28 amPRNPower Generation for the First Three Quarters of 2017
18th Oct 201711:24 amPRNNotice of Board of Directors Meeting
3rd Oct 201711:41 amPRNMonthly Return
26th Sep 20171:20 pmPRNContinuing Connected Transactions
20th Sep 20173:38 pmPRNThe Reply Made of CSRC's Feedback on A-Share Issuance
20th Sep 20173:28 pmPRNAdjustments to the A-Share Issuance
20th Sep 20173:14 pmPRNORA on Resolutions of the Board of Directors
11th Sep 201711:43 amPRNConnected Transaction - Capital Contribution Agreement
1st Sep 201712:30 pmPRNMonthly Return
31st Aug 20172:41 pmPRN2017 Interim Report
30th Aug 20179:52 amPRNArticles of Association
15th Aug 20171:50 pmPRNAnnouncement of 2017 Interim Results
15th Aug 20171:45 pmPRNORA - Resolutions of the Board of Directors
15th Aug 20171:40 pmPRNResolutions Passed at the 2017 Second EGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.