Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBradda Head Lithium Regulatory News (BHL)

Share Price Information for Bradda Head Lithium (BHL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.00
Bid: 1.90
Ask: 2.10
Change: -0.30 (-13.04%)
Spread: 0.20 (10.526%)
Open: 2.15
High: 2.11
Low: 2.11
Prev. Close: 2.00
BHL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Eureka Geophysics Results

24 Jan 2022 07:00

RNS Number : 3009Z
Bradda Head Lithium Ltd
24 January 2022
 

24 January 2022

Bradda Head Lithium Ltd.

("Bradda Head", "Bradda", or the "Company")

Eureka Geophysics Results

 

Bradda Head Lithium Ltd (AIM: BHL), the North America-focused lithium development group, announces results from industry expert Zonge Engineering's magnetotellurics survey (MT), and from Terravision Exploration's GPRplusTM survey (GPRPlus), both carried out at its Eureka asset in Nevada.

 

Highlights:

· The geophysics results from both programmes demonstrate the potential presence of both brine and clay deposits at Eureka, which is located in Central Nevada, not far from Tesla's Gigafactory and Albemarle's existing Silver Peak Lithium mine, notably the only US lithium mine in operation currently.

· The MT survey has shown the presence of a potential brine reservoir at varying depths (300m to 2,000m) over a 12km strike length. (see https://www.braddaheadltd.com/media/image-library/)

· Two programmes are now planned for H2 2022:- a deeper drilling programme to test the lower basin- a shallow drilling programme to test the clay potential.

· The surveys also showed geothermal potential at Eureka, which can potentially be used to lower the carbon footprint of lithium production at the asset. Geothermally heated water with anomalous lithium levels is seen at surface near Eureka, which were previously tested in 2016.

· Bradda has now staked an additional 16km2 of claims at its Eureka project reflecting the positive results from both geophysical programmes (see https://www.braddaheadltd.com/media/image-library/)

· The GPRPlus survey has also shown the presence of potential clay material, like that seen at Bradda's other sedimentary assets (Basin and Wikieup Projects) down to a depth of c.100m. Previous limited and shallow surface sampling returned grades of up to 550 ppm at Eureka.

 

 

Charles FitzRoy, CEO of Bradda Head, commented:

 

"These results support the potential of Eureka that our geological team have always believed to be the case. This will enable us to go ahead with plans for a drilling programme to test the observed brine reservoir and a shallow drill programme to test the clay to maximise the resource's full potential whilst further exploring Eureka's lower basin."

 

"Furthermore, Eureka has additional benefits in that it has demonstrated considerable geothermal potential. This is a key point as it could enable us to lower our carbon footprint and running costs for lithium extraction from Eureka - mirroring Bradda's vision and strategy."

 

"2022 has already been strong for Bradda, with the exercising of the Cheto option covering portions of Basin East and West, the positive metallurgical testwork results from Basin East demonstrating the potential to extract 99% of lithium from leach whilstthe Company remains very well funded via its Royalty agreement with LRC. The additional news at Eureka is a further sign of Bradda's fast-track approach to developing its assets, and we expect to announce more newsflow for Eureka over the course of 2022."

 

 

Background

 

Bradda Head commissioned two geophysical surveys (MT and GPRPlus) over its Eureka project to understand more about how the lithium is contained there. Bradda had previously undertaken a surface sampling programme, indicating the presence of lithium at surface of up to 550ppm Li, and testing of hot springs at surface had indicated an anomalous lithium content in the water at surface.

 

In late 2021 Bradda conducted remote sensing to understand more about the lithium footprint at Eureka, this led the Company to stake 16km2 of claims over the area which we believe has the potential for a shallow lithium in clay project, similar to what the Company is developing in Arizona at Wikieup and the Basin Project. Bradda has an existing JORC resource of 185kt of LCE at Basin East and an updated resource is due Q1, and the Company is currently drilling at Wikieup where a maiden resource is expected in Q2.

 

 

For further information please visit the Company's website: www.braddaheadltd.com

 

Contact:

 

Bradda Head Lithium Limited

+44 (0) 1624 639 396

Charlie FitzRoy, CEO

Denham Eke, Finance Director

 

 

 

Beaumont Cornish (Nomad)

James Biddle/Roland Cornish

+44 20 7220 1666

 

 

Peterhouse (Joint Broker)

+44 207 469 0930

Charles Goodfellow

Duncan Vasey

Lucy Williams

 

 

 

Shard Capital (Joint Broker)

+44 207 186 9927

Damon Heath

Isabella Pierre

 

 

 

Red Cloud (North American Broker)

+1 416 803 3562

Joe Fars

 

 

 

Tavistock (PR)

+ 44 20 7920 3150

Nick Elwes

Oliver Lamb

Adam Baynes

braddahead@tavistock.co.uk

 

 

 

 

 

Notes to Editors

Bradda Head Lithium Ltd. is a North America-focused lithium development group. The Company currently has interests in a variety of projects, the most advanced of which are in Central and Western Arizona: The Burro Creek Project (the Burro Creek East Project and the Burro Creek West Project) and the Wikieup Project.

The Burro Creek East Project has an estimated an Inferred Mineral Resource (JORC) of 42.6 Mt of lithium-bearing clays at an average grade of 818 ppm of lithium for 185,000 tonnes of lithium carbonate equivalent (LCE). The Burro Creek East Project also has additional exploration potential for extensions to the current model of between 50,000 to 300,000 tonnes of lithium carbonate equivalent.

The Group intends to continue to develop its three phase one projects in Arizona, whilst endeavouring to unlock value at its other prospective pegmatite and brine assets in Arizona, Nevada, and Pennsylvania.

All of Bradda Head's licences are held on a 100% equity basis and are in close proximity to the required infrastructure.

Bradda Head is quoted on the AIM of the London Stock Exchange with the ticker of BHL.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFLFSDLTIVFIF
Date   Source Headline
26th Apr 20237:00 amRNSResource Expansion Potential Identified at Basin
14th Apr 20237:00 amRNSDirector Dealings
13th Apr 20237:00 amRNSAcquisition of Inlier Claims at San Domingo
6th Apr 20237:00 amRNSIssue of Options
27th Mar 20237:00 amRNSSan Domingo Pegmatite District Drilling Results
23rd Mar 202311:20 amRNSHolding(s) in Company
16th Mar 20237:00 amRNSSonic Drilling Underway at the Basin Project
3rd Mar 20237:00 amRNSBasin East MRE Uploaded to SEDAR
1st Mar 20237:01 amRNSUpdated Map Following Disputed Claims Mediation
1st Mar 20237:00 amRNSSettlement of Claim Dispute with Arizona Lithium
20th Feb 20237:00 amRNSAppointment of Joey Wilkins as COO
6th Feb 20239:05 amRNSSecond Price Monitoring Extn
6th Feb 20239:00 amRNSPrice Monitoring Extension
6th Feb 20237:00 amRNSSan Domingo Drilling Results
27th Jan 20238:53 amRNSUnaudited Interim Results for the 3 and 9 months
27th Jan 20237:00 amRNSAppointment of North American Advisers
26th Jan 20233:05 pmRNSUpdated Presentation
26th Jan 20237:00 amRNSUpdate on San Domingo Drilling Results
24th Jan 20237:00 amRNSBradda Head Lithium Opens the TSX-V Market
16th Jan 20237:00 amRNSSignificant Resource Expansion at Basin Project
21st Dec 20227:00 amRNSStock Option Plan & Issue of Options
12th Dec 20224:40 pmRNSSecond Price Monitoring Extn
12th Dec 20224:35 pmRNSPrice Monitoring Extension
12th Dec 20222:05 pmRNSSecond Price Monitoring Extn
12th Dec 20222:00 pmRNSPrice Monitoring Extension
12th Dec 202211:05 amRNSSecond Price Monitoring Extn
12th Dec 202211:00 amRNSPrice Monitoring Extension
22nd Nov 20227:00 amRNSInvestor Conferences and Updated Presentation
21st Nov 20224:06 pmEQSBradda Head Lithium 'well positioned' following soil sampling results
21st Nov 20227:00 amRNSSan Domingo Soil Sampling Results
14th Nov 20227:00 amRNSNew Community Website Launched
9th Nov 20227:00 amRNSApproval to List on TSX-V
1st Nov 20227:00 amRNSUnaudited Interim Results
26th Oct 20229:35 amRNSReplacement - Holding(s) in Company
26th Oct 20227:00 amRNSHolding(s) in Company
18th Oct 20227:00 amRNSBasin East Drilling & Wikieup South Update
23rd Sep 202212:52 pmRNSResults of Annual General Meeting
22nd Sep 202212:08 pmRNSNew Company Websites and TSX-V Listing Update
13th Sep 20227:00 amRNSSpodumene Intersected in First Hole at San Domingo
5th Sep 20227:00 amRNSBasin East Extension Permit Received
30th Aug 20227:00 amRNSBasin East Update
25th Aug 20221:24 pmRNSCorrection: TR-1: Notification of Major Holdings
24th Aug 20224:34 pmRNSTR-1: Notification of Major Holdings
15th Aug 20227:00 amRNSNotice of AGM
8th Aug 20227:00 amRNSSan Domingo Update
29th Jul 20227:00 amRNSAudited Final Results for Year Ending 28 Feb 2022
21st Jul 20227:00 amRNSProposed Listing on TSX Venture Exchange
18th Jul 20227:00 amRNSDrill Rig Mobilised at San Domingo Project
30th Jun 20224:41 pmRNSSecond Price Monitoring Extn
30th Jun 20224:36 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.