Andrada Mining acquisition elevates the miner to emerging mid-tier status. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAntofagasta Regulatory News (ANTO)

Share Price Information for Antofagasta (ANTO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2,110.00
Bid: 2,109.00
Ask: 2,110.00
Change: 17.00 (0.81%)
Spread: 1.00 (0.047%)
Open: 2,107.00
High: 2,129.00
Low: 2,093.00
Prev. Close: 2,093.00
ANTO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2021 PRODUCTION REPORT

21 Apr 2021 07:00

RNS Number : 0814W
Antofagasta PLC
21 April 2021
 

NEWS RELEASE, 21 APRIL 2021

Q1 2021 PRODUCTION REPORT

PRODUCTION AND COSTS IN LINE WITH GUIDANCE

 

Antofagasta plc CEO, Iván Arriagada said: "Antofagasta´s production and cost performance in the first quarter was in line with guidance with copper production at 183,000 tonnes and net cash costs at $1.16/lb.

"Labour negotiations were successfully concluded at Los Pelambres and no further negotiations are scheduled at our mining operations until next year.

"In March, Chile entered a second wave of COVID-19 infections as the number of cases in Chile accelerated, reaching record daily cases since the outbreak of the pandemic. As a result, countrywide lockdowns have been reinstated with the availability of critical hospital infrastructure under significant pressure. In addition to the health measures we introduced last year we have further reduced our on-site workforce and these actions have allowed us to continue to operate our mines and projects under these challenging conditions. Additional testing has been introduced throughout the Group while the full benefit of the country's successful vaccination programme is expected to be realised later in the year. We also remain committed to supporting our local communities and suppliers, and contributing to the social and economic recovery of Chile.

"The copper market continues to perform strongly, and we expect this to continue as structural supply and demand dynamics support a tight physical market. In the meantime, we maintain our focus on cost control and disciplined capital allocation.

"Production, cost and capital expenditure guidance for the full year is unchanged, assuming no additional nationwide restrictions are imposed due the pandemic."

 

HIGHLIGHTS

PRODUCTION

· Copper production in Q1 2021 was in line with guidance at 183,000 tonnes, 5.7% lower than in the same quarter in 2020 and 5.0% lower than in Q4 2020 mainly due to expected reduced grades at Los Pelambres

· Gold production was 59,100 ounces in Q1 2021, 9.2% lower than in the same period in 2020 and 8.0% higher than in 4Q 2020, mainly due to changes in grade at Centinela

· Molybdenum production in the quarter was 3,000 tonnes, an increase of 600 tonnes compared to the same period in 2020 due to higher recoveries at Centinela, and 700 tonnes lower than in Q4 2020

CASH COSTS

· Cash costs before by-product credits in Q1 2021 were $1.68/lb, 17c/lb higher than the same period last year due to the decrease in production, the stronger Chilean peso and the impact of the payment of a one-off signing bonus following the completion of labour negotiations at Los Pelambres

· Net cash costs were $1.16/lb in Q1 2021, compared to $1.10/lb in Q1 2020 and $1.14/lb in the previous quarter, reflecting the increase in cash costs before by-product credits, partially offset by the higher by-product credits

 

 

 

 

GUIDANCE 2021

· Full year guidance assumes COVID-19 restrictions will remain in place for all of 2021. However, because of the new wave of COVID-19 cases and the nationwide lockdown imposed in late March, major maintenance at Los Pelambres originally planned for Q2 and which requires a large number of additional workers on-site is under review so that some of the non-critical activities can be rescheduled to later in 2021

· With the drought in central Chile now in its 12th year, Los Pelambres has implemented several operational changes during Q1 aimed at preserving water availability in anticipation of what could be a delayed start to the winter rainfall. While rainfall in 2020 was slightly higher than 2019, which itself was one of the worst years on record, the water balance in 2021 will reflect the cumulative impact of another year of drought. Los Pelambres will continue to regularly review projected water availability for the year under different scenarios and a sustained focus on optimising water usage will remain key, and in the second half 2022 we will complete the desalination plant

· In Q1, the growth projects at Los Pelambres, Centinela and Zaldívar progressed according to their revised plans with the COVID-19 health protocols fully integrated into their execution plans. Given the more extensive lockdown imposed since late March a further reduction in the number of on-site workers at Los Pelambres has been implemented in April and, at this stage, this is not expected to have an impact on the projects' schedules or costs

· Despite the above, and the stronger than expected Chilean peso, full year guidance is unchanged at 730-760,000 tonnes of copper at a net cash cost of $1.25/lb and capital expenditure of $1.6 billion

· Production in the second half of the year is expected to be slightly stronger than in the first half

· Earlier this month Los Pelambres submitted the EIA for the expansion of the desalination plant to 800 l/s, and for various sustaining capital expenditure projects, including the replacement of the concentrate pipeline and other infrastructure

 

GROUP PRODUCTION AND CASH COSTS

Year to Date

Q1

Q4

 

 

 

2021

2020

%

2021

2020

%

Copper production

kt

183.0

194.0

(5.7)

183.0

192.6

(5.0)

Copper sales

kt

182.8

195.3

(6.4)

182.8

202.2

(9.6)

Gold production

koz

59.1

65.1

(9.2)

59.1

54.7

8.0

Molybdenum production

kt

3.0

2.4

25.0

3.0

3.7

(18.9)

Cash costs before by-product credits (1)

$/lb

1.68

1.51

11.3

1.68

1.63

3.1

Net cash costs (1)

$/lb

1.16

1.10

5.5

1.16

1.14

1.8

(1) Cash cost is a non-GAAP measure used by the mining industry to express the cost of production in US dollars per pound of copper produced.

 

Investors - London Media - London

Andrew Lindsay alindsay@antofagasta.co.uk Carole Cable antofagasta@brunswickgroup.com

Telephone +44 20 7808 0988 Telephone +44 20 7404 5959

Rosario Orchard rorchard@antofagasta.co.uk

Telephone +44 20 7808 0988

Media - Santiago

Pablo Orozco porozco@aminerals.cl

Carolina Pica cpica@aminerals.cl

Telephone +56 2 2798 7000

 

Register on our website to receive our email alerts https://www.antofagasta.co.uk/investors/news/email-alerts/ 

 

MINING OPERATIONS

Los Pelambres

Los Pelambres produced 84,900 tonnes of copper in Q1 2021, 9.0% lower than in the same quarter last year and 6.2% lower than the previous quarter, mainly driven by lower grades.

Molybdenum production in Q1 2021 increased to 2,600 tonnes from 2,400 in Q1 2020, due to higher molybdenum grades.

Gold production for the quarter was 14,300 ounces, 3.4% lower than the same period last year.

Cash costs before by-product credits at $1.46/lb in Q1 2021 were 18.7% higher than in the same quarter in 2020 due to the decrease in production, the stronger Chilean peso, and the payment of a one-off signing bonus following the successful completion of labour negotiations which increased costs by approximately 2c/lb for the full year. Compared to the previous quarter, costs increased by 7.4%, again on the decrease in production and the impact of a one-off signing bonus.

Net cash costs in Q1 2021 increased by 2c/lb compared to Q1 2020 to $0.84/lb reflecting higher cash costs before by-product credits partially offset by by-product credits increasing from 41c/lb to 62c/lb on higher molybdenum production and higher realised prices. Compared to the previous quarter net cash costs increased by 5.0%.

The Los Pelambres Expansion project was 47.9% complete (engineering, procurement and construction) as at the end of the quarter.

LOS PELAMBRES

Year to Date

Q1

Q4

 

 

 

2021

2020

%

2021

2020

%

Daily ore throughput

kt

164.5

163.9

0.4

164.5

167.8

(2.0)

Copper grade

%

0.67

0.72

(6.9)

0.67

0.67

0.0

Copper recovery

%

89.1

90.0

(1.0)

89.1

90.3

(1.3)

Copper production

kt

84.9

93.3

(9.0)

84.9

90.5

(6.2)

Copper sales

kt

80.7

98.2

(17.8)

80.7

97.1

(16.9)

Molybdenum grade

%

0.021

0.017

23.5

0.021

0.023

(8.7)

Molybdenum recovery

%

85.3

84.4

1.1

85.3

85.1

0.2

Molybdenum production

kt

2.6

2.4

8.3

2.6

3.0

(13.3)

Molybdenum sales

kt

2.6

2.1

23.8

2.6

3.3

(21.2)

Gold grade

g/t

0.048

0.045

7.2

0.048

0.049

(1.1)

Gold recovery

%

68.1

75.7

(10.0)

68.1

74.5

(8.6)

Gold production

koz

14.3

14.8

(3.4)

14.3

16.6

(13.9)

Gold sales

koz

12.9

13.3

(3.0)

12.9

16.7

(22.8)

Cash costs before by-product credits (1)

$/lb

1.46

1.23

18.7

1.46

1.36

7.4

Net cash costs (1)

$/lb

0.84

0.82

2.4

0.84

0.80

5.0

(1) Includes tolling charges of $0.14/lb in Q1 2021, $0.15/lb in Q4 2020, and $0.20/lb Q1 2020

 

 

Centinela

Total copper production in Q1 2021 at Centinela was 66,800 tonnes, 0.5% higher than in the same quarter in 2020. Compared to the previous quarter, copper production decreased by 4.6% on lower throughput at both Centinela Concentrates and Centinela Cathodes.

Copper in concentrates production was 45,300 tonnes in Q1 2021, 3.9% higher than in Q1 2020 as the concentrate plant operated at above design capacity for the second consecutive quarter, which was partially offset by lower grades and recoveries. Compared to the previous quarter, copper in concentrate decreased by 2.8% on slightly lower throughput.

Production of copper in cathodes fell 6.1% compared to Q1 2020. This was primarily due to expected lower grades and recoveries, despite higher throughput.

Gold production was 44,900 ounces in Q1 2021, 10.7% lower than in the same period last year due to lower gold grades and recoveries, partially offset by higher throughput, and 18.2% higher than in Q4 2020 as grades and recoveries increased.

Cash costs before by-product credits in Q1 2021 were $1.78/lb, the same as in Q1 2020. Compared to the previous quarter costs decreased by 1.1% primarily on the impact of a one-off signing bonus in Q4 2020 partially offset by lower production.

Net cash costs in Q1 2021 were $1.12/lb, some 5c/lb lower than in the same quarter last year due to by-product credits increasing from 61c/lb to 66c/lb on higher molybdenum production and realised prices. Compared to the previous quarter net cash costs decreased by 5.1%, or 6c/lb reflecting the lower cash costs before by-product credits and higher by-product credits. 

 

CENTINELA

Year to Date

Q1

Q4

 

 

 

2021

2020

%

2021

2020

%

CONCENTRATES

 

 

 

 

 

 

 

Daily ore throughput

kt

106.4

91.1

16.8

106.4

108.0

(1.5)

Copper grade

%

0.60

0.64

(6.3)

0.60

0.59

1.7

Copper recovery

%

84.2

89.3

(5.7)

84.2

82.9

1.6

Copper production

kt

45.3

43.6

3.9

45.3

46.6

(2.8)

Copper sales

kt

45.1

43.0

4.9

45.1

45.1

0.0

Molybdenum grade

%

0.010

0.007

42.9

0.010

0.015

(33.3)

Molybdenum recovery

%

39.5

11.1

255.9

39.5

44.6

(11.4)

Molybdenum production

kt

0.4

0.1

300.0

0.4

0.7

(42.9)

Molybdenum sales

kt

0.4

0.1

300.0

0.4

0.9

(55.6)

Gold grade

g/t

0.22

0.27

(18.5)

0.22

0.18

22.2

Gold recovery

%

71.9

75.7

(5.0)

71.9

68.9

4.4

Gold production

koz

44.9

50.3

(10.7)

44.9

38.0

18.2

Gold sales

koz

42.6

50.4

(15.5)

42.6

34.9

22.1

 

 

 

 

 

 

 

 

Daily ore throughput

kt

56.9

53.6

6.2

56.9

58.0

(1.9)

Copper grade

%

0.59

0.64

(7.8)

0.59

0.64

(7.8)

Copper recovery

%

66.4

69.7

(4.7)

66.4

65.1

2.0

Copper production - heap leach

kt

20.4

21.5

(5.1)

20.4

22.3

(8.5)

Copper production - total (1)

kt

21.5

22.9

(6.1)

21.5

23.4

(8.1)

Copper sales

kt

21.8

22.2

(1.8)

21.8

26.1

(16.5)

Total copper production

kt

66.8

66.5

0.5

66.8

70.0

(4.6)

Cash costs before by-product credits (2)

$/lb

1.78

1.78

0.0

1.78

1.80

(1.1)

Net cash costs (2)

$/lb

1.12

1.17

(4.3)

1.12

1.18

(5.1)

(1) Includes production from ROM material

(2) Includes tolling charges of $0.19/lb in Q1 2021, $0.14/lb in Q4 2020, and $0.13/lb Q1 2020

 

 

Antucoya

Antucoya produced 20,200 tonnes of copper in Q1 2021, equal to the same quarter last year as a 9.7% increase in throughput was offset by lower grades and consequentially lower recoveries. Production decreased by 6.5% compared to Q4 2020 on lower grades and recoveries.

During the quarter, the cash costs were $1.96/lb, a 4.8% increase compared to the previous quarter. This was mainly due to lower grades.

ANTUCOYA

Year to Date

Q1

Q4

 

 

 

2021

2020

%

2021

2020

%

Daily ore throughput

Kt

80.6

73.5

9.7

80.6

79.5

1.4

Copper grade

%

0.35

0.41

(14.6)

0.35

0.39

(10.3)

Copper recovery

%

69.1

75.9

(9.0)

69.1

75.3

(8.2)

Copper production

Kt

20.2

20.2

0.0

20.2

21.6

(6.5)

Copper sales

Kt

22.9

18.3

25.1

22.9

22.8

0.4

Cash costs

$/lb

1.96

1.78

10.1

1.96

1.87

4.8

 

Zaldívar

Copper production at Zaldívar was 11,100 tonnes in Q1 2021, a 20.7% decrease compared with the same period last year on lower grades and recoveries. Production increased by 4.7% compared to Q4 2020 as throughput returned to levels achieved earlier in 2020.

Cash costs at $2.30/lb in Q1 2021 rose by 2.2% compared to the previous quarter primarily due to lower grades. Compared to Q1 2020 costs increased by 64c/lb on lower grades and lower recoveries.

ZALDÍVAR

Year to Date

Q1

Q4

 

 

 

2021

2020

%

2021

2020

%

Daily ore throughput

kt

42.2

42.2

0.0

42.2

34.8

21.3

Copper grade

%

0.88

0.99

(11.1)

0.88

0.99

(11.1)

Copper recovery (1)

%

48.8

61.3

(20.4)

48.8

50.1

(2.6)

Copper production - heap leach (2)

kt

9.0

11.0

(18.2)

9.0

8.0

12.5

Copper production - total (2,3)

kt

11.1

14.0

(20.7)

11.1

10.6

4.7

Copper sales (2)

kt

12.4

13.5

(8.1)

12.4

11.1

11.7

Cash costs

$/lb

2.30

1.66

38.6

2.30

2.25

2.2

(1) Restated from average over full leach cycle to 12-month rolling recoveries

(2) Group's 50% share

(3) Includes production from secondary leaching

 

 

 

Transport Division

Total transport volumes in Q1 2021 were 1.5 million tonnes, 6.2% lower than in the same quarter last year and 7.2% lower than in Q4 2020 mainly due to the impact of sea swells affecting port access and customers' lower copper production and sulphuric acid consumption.

TRANSPORT

Year to Date

Q1

Q4

 

 

 

2021

2020

%

2021

2020

%

Rail

kt

1,216

1,221

(0.4)

1,216

1,255

(3.1)

Road

kt

309

405

(23.7)

309

390

(20.7)

Total tonnage transported

kt

1,526

1,626

(6.2)

1,526

1,645

(7.2)

 

Commodity prices and exchange rates

 

Year to Date

Q1

Q4

 

 

 

2021

2020

%

2021

2020

%

Copper

 

 

 

 

 

 

 

Market price

$/lb

3.85

2.56

50.4

3.85

3.25

18.5

Realised price

$/lb

4.26

2.02

110.9

4.26

3.67

16.1

Gold

 

 

 

 

 

 

 

Market price

$/oz

1,800

1,584

13.6

1,800

1,875

(4.0)

Realised price

$/oz

1,708

1,605

6.4

1,708

1,901

(10.2)

Molybdenum

 

 

 

 

 

 

 

Market price

$/lb

11.3

9.7

16.5

11.3

9.0

25.6

Realised price

$/lb

13.3

9.8

35.7

13.3

9.8

35.7

Exchange rates

 

 

 

 

 

 

 

Chilean peso

per $

724

804

(10.0)

724

762

(5.0)

 

Spot commodity prices for copper, gold and molybdenum as at 31 March 2021 were $4.01/lb, $1,688/oz and $11.1/lb respectively, compared with $3.51/lb, $1,891/oz and $10.0/lb as at 31 December 2020 and $2.18/lb, $1,607/oz and $8.4/lb as at 31 March 2020.

The provisional pricing adjustments for copper, gold and molybdenum for the quarter were positive $169.0 million, negative $7.1 million and positive $12.8 million respectively.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLURSVRAOUSUAR
Date   Source Headline
28th Jun 20244:00 pmRNSREPORT ON PAYMENTS TO GOVERNMENTS
5th Jun 20245:02 pmRNSTRANSFER OF CENTINELA WATER SUPPLY INFRASTRUCTURE
8th May 20246:23 pmRNSRESULTS OF 2024 ANNUAL GENERAL MEETING
8th May 202410:05 amRNSCHAIRMAN’S COMMENTS AT THE 2024 AGM
30th Apr 20247:00 amRNSANTOFAGASTA PLC ANNOUNCES PRICING OF BOND
25th Apr 20247:00 amRNSFINAL DIVIDEND PAYABLE
17th Apr 20247:00 amRNSQ1 2024 PRODUCTION REPORT
3rd Apr 202411:00 amRNSNOTIFICATION OF TRANSACTIONS
28th Mar 20247:00 amRNS2023 REPORTING SUITE, 2024 AGM & CORPORATE UPDATE
19th Mar 20248:00 amRNSCENTINELA SECOND CONCENTRATOR FINANCING
20th Feb 20247:00 amRNSFULL-YEAR RESULTS FOR THE YEAR ENDED 31/12/2023
16th Feb 20247:00 amRNSUPDATED EMISSIONS TARGETS
15th Feb 20247:00 amRNS2023 FY RESULTS PRESENTATION & CONFERENCE DETAILS
30th Jan 20244:49 pmRNSAPPOINTMENT OF INDEPENDENT NON-EXECUTIVE DIRECTOR
17th Jan 20247:00 amRNSQ4 2023 PRODUCTION REPORT
2nd Jan 20247:00 amRNSNOTIFICATION OF TRANSACTION BY DIRECTOR / PDMR
20th Dec 20237:00 amRNSCENTINELA SECOND CONCENTRATOR PROJECT APPROVED
15th Dec 20232:24 pmRNSANTOFAGASTA ANNOUNCES INVESTMENT IN BUENAVENTURA
12th Dec 20237:00 amRNSDIRECTOR CHANGE AND CHANGES TO BOARD COMMITTEES
10th Nov 20237:00 amRNSPUBLICATION OF CLIMATE CHANGE REPORT
18th Oct 20237:00 amRNSQ3 2023 PRODUCTION REPORT
7th Sep 20237:00 amRNSINTERIM DIVIDEND PAYABLE
10th Aug 20237:00 amRNSHALF YEARLY FINANCIAL REPORT
3rd Aug 20237:00 amRNS2023 Half Year Results - Participation Details
31st Jul 20237:00 amRNSANTOFAGASTA RELEASES SOCIAL VALUE REPORT
20th Jul 20237:00 amRNSANTOFAGASTA RELEASES TAX REPORT
19th Jul 20237:00 amRNSQ2 2023 PRODUCTION REPORT
30th Jun 20237:00 amRNSReport on Payments to Govts
10th May 20236:37 pmRNSRESULTS OF 2023 ANNUAL GENERAL MEETING
10th May 20231:00 pmRNSCHAIRMAN’S COMMENTS AT THE 2023 AGM
2nd May 20237:00 amRNSFINAL DIVIDEND PAYABLE
19th Apr 20237:00 amRNSQ1 2023 PRODUCTION REPORT
18th Apr 20237:00 amRNSAPPOINTMENT OF INDEPENDENT NON-EXECUTIVE DIRECTOR
31st Mar 20238:38 amRNSPUBLICATION OF 2022 ANNUAL REPORT AND ACCOUNTS
30th Mar 20234:31 pmRNSNOTIFICATION OF TRANSACTIONS
14th Mar 20234:39 pmRNSCHANGES TO BOARD COMMITTEES
21st Feb 20237:00 amRNS2022 Full-year results announcement
14th Feb 20237:00 amRNS2022 Full Year Results - Participation Details
18th Jan 20237:00 amRNSQ4 2022 PRODUCTION REPORT
29th Dec 20228:34 amRNSLOS PELAMBRES ACCESS BLOCKED
15th Dec 20225:15 pmRNSANTOFAGASTA EXITS REKO DIQ PROJECT IN PAKISTAN
19th Oct 20227:00 amRNSQ3 2022 PRODUCTION REPORT
12th Oct 202210:15 amRNSNotice of Q3 2022 Production Report
4th Oct 20222:37 pmRNSLOS PELAMBRES DESALINATION PROJECT UPDATE
12th Sep 20227:00 amRNSPrecautionary Measure at Los Pelambres
9th Sep 20225:31 pmRNSInterim Dividend 2022 FX Rates
11th Aug 20227:00 amRNSHALF YEAR FINANCIAL REPORT FOR PERIOD TO 30.06.22
4th Aug 20227:00 amRNSNotice of Half Year Results 2022
20th Jul 20227:00 amRNSQ2 2022 PRODUCTION REPORT
11th Jul 20227:00 amRNSANTOFAGASTA RELEASES TAX REPORT

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.