Tribe Technology set to deliver healthy pipeline of orders from Tier-One miners. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksALS.L Regulatory News (ALS)

  • There is currently no data for ALS

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration Update at Daro Copper Gold Project

14 Aug 2018 07:00

RNS Number : 6734X
Altus Strategies PLC
14 August 2018
 

Altus Strategies Plc / Epics: AIM: ALS & TSX-V: ALTS / Sector: Mining

 

NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES NOR FOR DISSEMINATION IN THE UNITED STATES OF AMERICA

 

 

 

14 August 2018

Altus Strategies Plc

("Altus" or the "Company")

 

Exploration Update at Daro Copper Gold Project, Northern Ethiopia

 

Altus Strategies Plc (AIM: ALS & TSX-V: ALTS), the Africa focused exploration project generator, provides an update on its exploration activities at its 100% owned 411.7km2 Daro copper-gold project (''Daro'' or the ''Project'') in the Tigray province of northern Ethiopia.

 

Highlights:

· High copper and gold outcrop assay results including 11.6% Cu and 4.4 g/t Au at Teklil prospect

· Gossan zone at Teklil prospect mapped discontinuously for 900m

· Discovery of Keren prospect including assays of 37 g/t Au in float and 10.35 g/t Au in outcrop

· Significant gold-bearing quartz vein and stockwork system discovered at Keren prospect

· Stream sediment survey completed with results defining multiple new target areas

 

Steven Poulton, Chief Executive of Altus, commented:

"Exploration at Daro is continuing to yield exciting results, with high gold and copper assays returning from a number of surface sampling programmes, including 37 g/t Au and 22.7% Cu. The presence of gossans, polymetallic mineralisation, significant artisanal gold workings and favourable host geology continues to indicate the potential for a VMS discovery within Daro. We are also excited to continue developing the Project further, with the discovery of the Keren prospect containing a gold-bearing quartz vein and stockwork system. Our next phase of work will include mapping and selective channel and soil sampling programmes. We look forward to updating shareholders on the results of this work in due course."

 

Teklil prospecting results

Rock chip sampling at the Teklil prospect has returned results of 4.4 g/t Au from quartzite and 11.6% Cu from metamudstone in the immediate hanging wall of a newly discovered gossan. A total of 75 rock chip and float samples were collected as part of the programme. As previously reported by the Company on the 5th of April 2018, a sample of gossan float from Teklil assayed at 34% Cu. Follow up exploration in the vicinity of this sample has discovered in-situ gossanous material, a sample of which has assayed 6.95% Cu and 1.06 g/t Au. An additional sample of gossanous float collected in this area has assayed 22.7% Cu and 6.51 g/t Au. The gossan zone at Teklil has now been mapped discontinuously for approximately 900m and is up to 15m wide.

 

Stream sediment samples located approximately 750m to the north of the Teklil prospect have returned anomalous gold (including 9ppb Au and 6ppb Au), which when coupled with a 4.4 g/t Au sample of outcrop in the vicinity, indicate that the prospect remains open to the north.

 

Discovery of Keren Prospect

Exploration following up on anomalous stream sediment results (including 111ppb Au and 76ppb Au), has discovered the Keren prospect which is located approximately 9km southeast of the Teklil prospect. A sample of quartz float at Keren, has assayed 37 g/t Au, while multiple rock chips have returned values greater than 0.5 g/t Au and up to 10.35 g/t Au. A total of 75 rock chip and float samples were collected as part of the programme. Six zones of ENE-WSW striking discontinuous and sub parallel quartz veining and stockworks have been mapped at Keren to date, with each zone being mapped as between 25m and 300m wide within a 2km long area of interest.

 

The following figures have been prepared and relate to the disclosures in this announcement and are visible in the version of this announcement on the Company's website (www.altus-strategies.com) or in PDF format by following this link:

http://altus-strategies.com/site/assets/files/4424/daro_update_-_aug_18.pdf

 

· Location of the Daro licence on the Arabian Nubian Shield is shown in Figure 1.

· Geology and structures of the Daro licence is shown in Figure 2.

· Overview of the Teklil gold-copper prospect is shown in Figure 3.

· Overview of the Keren gold-copper prospect is shown in Figure 4.

· A selection of project photos is shown in Figure 5.

 

Daro Project: Location

The Daro exploration licence is held by Altau Resources Ltd, the Company's 100% owned Ethiopia focused subsidiary. The licence is located in northern Ethiopia, 95km west of the Company's Tigray-Afar Cu-Ag project, 100km northwest of the Tigray state capital of Mekele and 570km north of Ethiopia's capital, Addis Ababa. Mekele has a regional airport and year-round access to the licence area is provided by a network of maintained surfaced and graded roads.

 

Daro Project: Geological setting

The Daro licence is situated within the Neo-Proterozoic Nakfa Terrane, at a junction between two major tectonic blocks and comprises a series of metasedimentary and metavolcanic rocks, affected by thrusting and intrusion of the Rama granite. A band of mafic to ultramafic rocks bisects the licence from southwest to northeast, interpreted to be an ophiolite complex of ancient oceanic crust and seafloor sediments. Historical data compilation of Daro, undertaken by the French governmental Bureau de Recherches Géologiques et Minières ("BRGM"), has defined a number of marker lithologies and structures that are considered prospective for VMS deposits. These include the presence of bimodal volcanics and associated sediments, mafic and ultramafic lithologies which conform to an ophiolitic sequence, as well as the presence of extensive chert horizons.

 

The Nakfa Terrane hosts a number of significant VMS base metal and gold deposits and mines. These include Bisha, a polymetallic mine operated by Nevsun Resources Ltd (TSX: NSU) 190km north west of Daro, the Harvest and Adyabo projects, being advanced by East Africa Metals Inc. (TSX-V:EAM) 35km west of Daro and the Asmara project being advanced by Sichuan Road & Bridge Mining Investment Corp Ltd 100km north of Daro.

 

Sampling Methodology and analysis

A total of 75 grab samples were collected as rock chips from outcrop or float from the programmes described in this release. Of the 75 samples:

 

Copper: 6 of 75 samples assayed above 1% Cu, ranging from trace to 22.70% Cu

Gold: 28 of 75 samples assayed above 0.2 g/t Au, ranging from

Silver: 18 of 75 samples assayed above 1 g/t Ag, ranging from

 

All sample preparation and assay was undertaken by ALS Global at their laboratories in Addis Ababa (Ethiopia) and Loughrea (Republic of Ireland) respectively. To date the Company has collected 195 stream sediment samples at the Daro project. Given the early stage nature of these programmes, no Quality Assurance and Quality Control ("QA-QC") samples have been sent for assay.

 

Rock samples were crushed with 70% passing -2mm. The aqua regia digestion with super trace ICP-MS analysis for a suite of 41 elements.

 

The stream sediment sample programme covered approximately 65% of the 411.7km2 Daro licence area. Drainage catchments within the licence were defined using 1:50,000 scale topographic maps prepared by the Ethiopian Mapping Authority. At each sampling locality, a 4kg sample of

 

Qualified Person

The technical disclosure in this regulatory announcement has been read and approved by Steven Poulton, Chief Executive of Altus. A graduate of the University of Southampton in Geology (Hons), he also holds a Master's degree from the Camborne School of Mines (Exeter University) in Mining Geology. He is a Fellow of the Institute of Materials, Minerals and Mining and has over 19 years of experience in mineral exploration and is a Qualified Person under the AIM rules and National Instrument 43-101 under the rules of the TSX.

 

Market Abuse Regulation (MAR) Disclosure

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

For further information you are invited to visit the Company's website www.altus-strategies.com or contact:

 

Altus Strategies Plc

Steven Poulton, Chief Executive

 

Tel: +44 (0) 1235 511 767

E: info@altus-strategies.com

SP Angel (Nominated Adviser)

Richard Morrison / Soltan Tagiev

 

Tel: +44 (0) 20 3470 0470

SP Angel (Broker)

Richard Parlons / Jonathan Williams

 

Tel: +44 (0) 20 3470 0471

Blytheweigh (Financial PR)

Tim Blythe / Camilla Horsfall / James Husband

Tel: +44 (0) 20 7138 3204

 

About Altus Strategies Plc

Altus is a London (AIM: ALS) and Toronto (TSX-V: ALTS) listed, diversified and Africa focused mineral exploration project generator. Through our subsidiaries we discover new projects and attract third party capital to fund their growth, development and ultimately exit optionality. This strategy enables Altus to remain focused on the acquisition of new opportunities to be fed into the project generation cycle and aims to minimise shareholder dilution. Our business model is designed to create a growing portfolio of well managed and high growth potential projects and royalties, diversified by commodity and by country. Altus currently has eighteen projects in six commodities across six countries. We aim to position our shareholders at the vanguard of value creation, but with significantly reduced risks traditionally associated with investments in the mineral exploration sector.

 

Cautionary Note Regarding Forward-Looking Statements

Certain statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs. Readers are cautioned not to place undue reliance on the forward-looking information, which speak only as of the date of this news release.

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

Glossary of Terms"Ag" means silver

"Au" means gold

"Cu" means copper

"Gossan" means an intensely oxidized, weathered or decomposed rock, potential indicating the upper and exposed part of an ore deposit or mineral vein

"ICP-AES" means Inductively coupled plasma atomic emission spectroscopy

"ICP-MS" means Inductively coupled plasma mass spectrometry

"km" means kilometre

"m" means metres

"Ma" means million years ago

"Outcrop" means a visible exposure of rock that is in-situ and has no covering of soil or vegetation

"Shear zone" means a zone in which rocks have been deformed by lateral movement along parallel planes

"QA-QC" means Quality Assurance and Quality Control

"Quartz vein" means a fracture which has been filled by quartz and other minerals which have crystallised from mineralised fluids

"VMS" means volcanogenic massive sulphide

 

**ENDS**

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLKMGMRNFLGRZM
Date   Source Headline
17th Aug 20227:00 amRNSCancellation - ALTUS STRATEGIES PLC
16th Aug 20225:04 pmRNSQuarterly Report and Financial Statements
16th Aug 202210:06 amRNSScheme of arrangement becomes effective
16th Aug 20227:30 amRNSSuspension – Altus Strategies Plc
12th Aug 202212:22 pmRNSCourt Sanction of Scheme of Arrangement
9th Aug 20225:30 pmRNSAltus Strategies
8th Aug 20224:08 pmRNSResults of Court Meeting and General Meeting
2nd Aug 20227:00 amRNSUpdated MRE & PEA at Diba & Lakanfla gold project
13th Jul 202211:14 amRNSForm 8.3 - Altus Strategies PLC
12th Jul 202212:21 pmRNSForm 8.3 - Altus Strategies PLC
12th Jul 20227:00 amRNSPublication and Posting of Scheme Document
1st Jul 20224:56 pmRNSForm 8.3 - Altus Strategies plc
1st Jul 20224:40 pmRNSForm 8.3 - Altus Strategies plc
1st Jul 20224:36 pmRNSForm 8.3 - Altus Strategies plc
1st Jul 202212:27 pmRNSForm 8.3 - Altus Strategies
30th Jun 20223:04 pmRNSForm 8.3 - Altus Strategies plc
30th Jun 20227:00 amRNSForm 8.3 - Altus Strategies plc
28th Jun 202210:28 amRNSForm 8.3 - Altus Strategies Plc
21st Jun 20223:50 pmRNSResult of Annual General Meeting
21st Jun 20221:15 pmRNSForm 8 (OPD) - Altus Strategies Plc
16th Jun 20225:00 pmRNSForm 8 (OPD) - Elemental Royalties Corp.
16th Jun 20224:56 pmRNSForm 8 (OPD) Altus Strategies plc
16th Jun 20224:36 pmRNSForm 8 (DD) - Matthew Grainger
16th Jun 20224:33 pmRNSForm 8 (DD) - Steven Poulton
16th Jun 20227:00 amRNSDirector Dealings & PDMR Notification
15th Jun 20226:21 pmRNSRecommended All-Share Merger of Equals
15th Jun 20221:14 pmRNSForm 8.3 - Altus Strategies / Elemental Royalties
14th Jun 20227:00 amRNSRECOMMENDED ALL-SHARE MERGER OF EQUALS
9th Jun 20227:00 amRNSRecord Quarterly Royalty Income from Caserones
31st May 20227:00 amRNSMultiple High Grade Gold Discoveries in Egypt
27th May 20223:00 pmRNSQuarterly Report and Financial Statements
26th May 20227:00 amRNSNotice of Annual General Meeting
23rd May 20227:00 amRNSHolding(s) in Company
20th May 20227:00 amRNSAltus to Receive US$5.3M in Portfolio Rebalancing
16th May 20227:00 amRNSExtension of La Mancha Strategic Loan Facility
29th Apr 20227:00 amRNSAudited Final Results
26th Apr 20227:00 amRNSDrilling hits 4.9 g/t gold over 14m at Tabakorole
19th Apr 20227:00 amRNSGold Mining Licence Granted at Diba Project, Mali
12th Apr 20227:00 amRNSMining Licence Granted, Agdz Copper-Silver Project
5th Apr 20227:00 amRNSUpdate on Copper and Gold Royalty Revenues
17th Mar 20227:00 amRNSSignificant Intercepts from Diba & Lakanfla, Mali
15th Mar 20227:00 amRNSPortfolio Update
11th Mar 20224:53 pmRNSHolding(s) in Company
7th Mar 20227:00 amRNSAppointment of Gerard De Hert to the Board
21st Feb 20227:00 amRNSDirector Dealings & PDMR Notification
15th Feb 20227:00 amRNSAltus Intersect 1.23 g/t over 127m at Lakanfla
14th Feb 20227:00 amRNSExtension of Loan Facility from La Mancha
11th Feb 20227:00 amRNSGrant of Share Options and PDMR Notification
1st Feb 20227:00 amRNSCompletion of Newcrest Gold Royalty Acquisition
27th Jan 20227:00 amRNSExcellent gold grades from drilling at Diba, Mali

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.