RE: Revenue11 Jan 2019 23:07
They have a massive haulage industry over there move oil in tankers which will only do a well up to 4500/5000 Nope.
Anything over that it's a 75mm steel pipe as was told on hear by a chap who works over there.
3 mouths to get there 4 months to install.