Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUnivision Share News (UVEL)

  • This share is currently suspended. It was suspended at a price of 0.15

Share Price Information for Univision (UVEL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.15
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.15
UVEL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

UniVision sinks as profit hit hard by Hong Kong metro project delays

Thu, 30th Dec 2021 10:04

(Alliance News) - UniVision Engineering Ltd on Thursday said a dispute with a subcontractor held back progress on a major contract, resulting in higher costs that more than halved profit.

Shares in UniVision were down 15% at 0.72 pence on Thursday morning in London. The stock is down 42% in 2021.

For the six months that ended September 30, UniVision reported pretax profit dropped 64% to GBP142,000 from GB394,000.

The Hong Kong-based CCTV and surveillance system company said that a dispute with a subcontractor over the value of work related to its Mass Transit Railway Corp contract was responsible for the fall.

MTRC is the company's largest customer, with UniVision providing replacement work on CCTV systems and installing CCTV system for numerous railway lines in Hong Kong.

UniVision commented that it believes that the sub-contractor performing installation works as part of the contract has under-performed tasks. This, the company noted, had resulted in major delays in the MTRC project and also increased costs, as Univision deployed its own resources to complete the outstanding work.

Further, a change of key network equipment caused additional delays. Combined, UniVision said these factors had hurt the process of certification and has led to slow billing to MTRC.

UniVision also recorded an impairment of GBP634,000 related to billings to MTRC for a maintenance contract. It took no such hit a year before.

Up to September 30, the company had invoiced MTRC HKD184.5 million, about GBP17.6 million, leaving HKD305.2 million remaining. Despite the recent issues, UniVision said it expects the completion of contracted works in July 2024 as originally intended.

Revenue rose 22% to GBP5.0 million from GBP4.1 million. The company cited increases in construction contract income for the rise which leaped 75% to HKD50.5 million from HKD28.9 million year-on-year.

Looking forward, UniVision said it remains cautious about its second half due to Covid-19 delaying projects.

By Heather Rydings; heatherrydings@alliancenews.com

Copyright 2021 Alliance News Limited. All Rights Reserved.

More News
24 Apr 2018 18:35

UniVision Shares Close 20% Higher On Annual Earnings Guidance

LONDON (Alliance News) - Closed circuit television and surveillance systems producer UniVision Engineering Ltd on Tuesday termed 2018 financial year as a "transformational year" and said

Read more
28 Jun 2016 11:21

UniVision Agrees Sale Of Taiwanese Subsidiary To Executive Chairman

Read more
31 May 2016 13:54

UniVision Engineering sees FY hit from Taiwan unit loss

(ShareCast News) - Shares in Hong Kong-based surveillance and security outfit UniVision Engineering plummeted after the company's Taiwan unit reporting a TWD$25.5 full year operating loss which it expected to hit 2016 group earnings. UniVision holds a 52.25% interest in T-Com Technology. Operations

Read more
31 May 2016 11:44

UniVision Expects T-Com Trading Troubles To Hit Annual Results

Read more
22 May 2016 23:01

UK advisers struggling with Chinese stock listings - survey

By Alasdair Pal and Patrick Graham LONDON, May 23 (Reuters) - Almost two-thirds of the advisory firms who assist in stock exchange listings in London say they are struggling to guide Chinese firms through the process, a survey showed, in the latest sign of problems with such initial public

Read more
1 Apr 2016 14:13

UniVision share transfer deal heading to court

(ShareCast News) - UniVision revealed it was embroiled in the beginnings of a legal battle on Friday, after a share transfer deal in Hong Kong turned sour. The AIM-traded company supplies, designs, installs and maintains CCTV and surveillance systems, and sells security-related products. In an upda

Read more
1 Apr 2016 11:06

UniVision And Its Chairman Face Legal Proceedings Over Share Deal

Read more
30 Mar 2016 11:44

UniVision Engineering To Sell T-Com Technology Stake

Read more
14 Jan 2016 17:09

DIRECTOR DEALINGS SUMMARY: Univision Chairman Sells Over 40% Of Stake

Read more
14 Jan 2016 17:02

DIRECTOR DEALINGS: Univision Chairman Sells Over 40% Stake

Read more
11 Dec 2015 11:13

UniVision Engineering Swings To Loss On Competition, Project Delays

Read more
3 Dec 2015 11:12

UniVision Warns Poor Performance From Subsidiary To Cause Interim Loss

Read more
5 Oct 2015 15:02

AGM, EGM Calendar - Week Ahead

Read more
10 Sep 2015 17:00

UniVision Engineering Full Year Profit Falls As Competition Increases

Read more
29 Apr 2015 11:56

UniVision Engineering Wins New Contracts Worth HKD8.4 Million

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.