The next focusIR Investor Webinar takes places on Weds 10th July at 6 PM with guest speakers from Pyx Resources (PYX), Helium one (HE1), Fulcrum Metals (FMET) and Metals One (MET1). Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUnivision Share News (UVEL)

  • This share is currently suspended. It was suspended at a price of 0.15

Share Price Information for Univision (UVEL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.15
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.15
UVEL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

UniVision Engineering Swings To Loss On Competition, Project Delays

Fri, 11th Dec 2015 11:13

LONDON (Alliance News) - Closed circuit television and surveillance system company UniVision Engineering Ltd Friday reported a swing to a pretax loss for its first half, as a result of increasing competition and a delay of major government infrastructure projects.

For the half year to end-September the company reported a swing to a pretax loss of HKD583,000 from a pretax profit of HKD2.4 million a year before, equivalent to a pretax loss of GBP49,000, swung from a pretax profit of GBP189,000.

This was as a result of revenue falling to HKD34.4 million from HKD,40.8 million, or GBP2.9 million from GBP3.1 million. UniVision attributed this decline primarily to a 27% fall in its maintenance construction business, mostly caused by a change in the scope of service provided in a new maintenance contract with MTR Corp Ltd, and lower sub-contract income for a CCTV replacement project.

Despite the fall in revenue, the company said it expects its business to improve, as several proposed major infrastructure projects are expected in the coming years.

It intends to maintain its dividend policy "in the coming years", it said, noting it has paid a final dividend to shareholders in its last three financial years.

UniVision said it remains confident for its future, and "cautiously optimistic" about its prospects.

Shares in UniVision were untraded Friday morning. It last traded at 0.550 pence.

By Hana Stewart-Smith; hanassmith@alliancenews.com; @HanaSSAllNews

Copyright 2015 Alliance News Limited. All Rights Reserved.

More News
17 May 2013 19:10

Investors dump Double B names as rates spike higher

By Danielle Robinson and Joy Ferguson NEW YORK, May 17 (IFR) - If anyone needed evidence that parts of the high-yield bond market no longer offer protection against rising interest rates, then they received it this week, when the highest quality, longest dated new issues suffered losses of

Read more
8 Apr 2013 13:44

UniVision leaps on contract wins and proposed dividend

UniVision, which designs and installs digital surveillance and integrated security systems, saw its shares rocket on Monday after securing a number of new contracts in Hong Kong. Together the four contacts have a total value in the region on £1.1m and include the CCTV for the Island South railway

Read more
29 Dec 2011 15:31

London close: London hitches ride on Wall Street's coat-tails

London's reaction to the keenly awaited Italian bond auction bordered on indifference, but investors took heart from US business activity data. Propelled by Wall Street's tail-winds, Footsie finished on a high for the day. Italy sold €2.5bn worth of benchmark 10-year bonds at an interest rate of 6

Read more
29 Dec 2011 09:57

Univision jumps on revenue growth

Univision Engineering, the security company focused on China and Taiwan, shot up on Thursday morning after reporting increased revenues in the half year to the end of September. Total revenue for the period hit HK$47M (£3.9m), up 24% on the equivalent period of last year. The profit figure was not

Read more
16 Jul 2010 08:30

UniVision Engineering Sees FY11 Loss After Tax >UVEL.LN

LONDON (Dow Jones)--UniVision Engineering Ltd (UVEL.LN), an AIM-listed Hong Kong based designer and installer of digital surveillance and integrated security systems, said Friday it anticipates recording a loss after tax for the year ended March 31 which it blamed a full impairment loss on its inves

Read more
21 Jun 2010 11:23

UniVision Doesn't See Zhongshan Completion For 6 Months

LONDON (Dow Jones)--UniVision Engineering Ltd. (UVEL.LN), a Hong Kong based designer and installer of digital surveillance and integrated security systems, said Monday that due to slower than expected progress in certain areas of construction and overall market conditions in China it doesn't now exp

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.